Grease Waste Sample Clauses

Grease Waste. The Tenant is responsible to replace all piping from every fixture connection to the wye connection of the main branch line. The Tenant is responsible for installing and maintaining a complete grease waste interceptor system if the existing space is not equipped with one. There are two locations for the interceptor; within the kitchen using model (Thermaco Big Dipper System or approved equal) or at an SFO approved location on the ramp. The Airport will determine which type of interceptor is required depending on the anticipated grease production of the restaurant. New piping shall be of materials that will not allow grease to coat the interior of the pipe. All piping shall be labeled including tenant space number every 10 feet and at point of connections. The GI unit itself shall have a plaque with the space name and a 24 hour contact number attached to it.
AutoNDA by SimpleDocs
Grease Waste a. (0) 0000-0000 gallon concrete interceptor.
Grease Waste. 13 5. Natural Gas...................................................... 13 6. Testing.......................................................... 13 L. FIRE PROTECTION....................................................... 13 M.
Grease Waste. Code-approved grease interceptors must be installed to prevent grease-laden waste from entering the sanitary waste system. Interceptors located within a space must be surface-mounted above the floor. Grease interceptors outside the Premises must be approved by the Landlord. A master grease waste system and common grease inceptor has been provided for the Taste of San Francisco. A connection is available at designated locations.
Grease Waste. The Tenant is responsible to replace all piping from every fixture connection to the wye connection of the main branch line. The Tenant is responsible for installing and maintaining a complete grease waste interceptor system if the existing space is not equipped with one. There are two locations for the interceptor; within the kitchen using model (Thermaco Big Dipper System or approved equal) or at an SFO approved location on the ramp. The Tenant contractor shall perform confirmation dye testing for any interceptor installations at locations where aboveground sanitary connections are not
Grease Waste 

Related to Grease Waste

  • Hazardous Waste Throughout the term of this Lease, Tenant shall not undertake or permit any Environmental Activity (as such term is hereinafter defined) other than (i) in compliance with all applicable laws and ordinances and all rules, orders and regulations, present or future, ordinary or extraordinary, foreseen or unforeseen) of any federal, state or local governmental authority (hereinafter collectively referred to as "Legal Requirements"), and (ii) in such a manner as shall keep the premises, the Building and the Land free from any lien imposed pursuant to any Legal Requirement in respect of such Environmental Activity. Tenant shall take all necessary steps to ensure that any Environmental Activity undertaken or permitted at the premises is undertaken in a manner as to provide prudent safeguards against potential risks to human health or the environment. Tenant shall notify Landlord within 24 hours of the release of any Hazardous Materials (as such term is hereinafter defined) from or at the premises which could form the basis of any claim, demand or action by any party. Landlord shall have the right, from time to time, at Tenant's expense, to conduct an environmental audit or such other examinations, tests, inspections and reviews of the premises as Landlord, in its sole discretion, shall deem necessary, appropriate or desirable and Tenant shall cooperate in the conduct of any such environmental audit, examination, test, inspection or review. If Tenant shall breach the covenants provided in this Article, then, in addition to any other rights and remedies which may be available to landlord pursuant to this Lease or otherwise at law, Landlord may require Tenant to take all actions, or to reimburse Landlord for the costs of any and all actions taken by Landlord, as are necessary, appropriate or desirable to cure such breach. for purposes of this Article, the term "Environmental Activity" means any use, storage, installation, existence, release, threatened release, discharge, generation, abatement, removal, disposal, handling or transportation from, under, into or on the leased premises of (a) any "hazardous substance" as defined in any federal statute, (b) petroleum, crude oil or any fraction thereof, natural gas or synthetic gas used for fuel, and (c) any additional substances or materials which at such time are classified or considered to be hazardous or toxic under the laws of the State of New York or any other Legal Requirements the materials described in clauses (a) through (c) being collectively referred to as "Hazardous Materials". The provisions of subparagraph (j) of Article 6 of this Lease shall be applicable to any failure by Tenant to comply with or keep or perform the provisions of this Article. The obligations of Tenant under this Article shall survive the expiration or sooner termination of the term of this Lease.

  • Waste Borrower shall not commit or suffer any waste of the Property or make any change in the use of the Property which will in any way materially increase the risk of fire or other hazard arising out of the operation of the Property, or take any action that might invalidate or give cause for cancellation of any Policy, or do or permit to be done thereon anything that may in any way impair the value of the Property or the security of this Security Instrument. Borrower will not, without the prior written consent of Lender, permit any drilling or exploration for or extraction, removal, or production of any minerals from the surface or the subsurface of the Land, regardless of the depth thereof or the method of mining or extraction thereof.

  • STORAGE TANKS AND SUMPS 3.1 Is any above or below ground storage of gasoline, diesel, petroleum, or other Hazardous Materials in tanks or sumps proposed in, on or about the Premises? Existing Tenants should describe any such actual or proposed activities. Yes [ ] No [ ] If yes, please explain:

  • Hazardous Wastes Are hazardous wastes generated? Yes ☐ No ☐ If yes, continue with the next question. If not, skip this section and go to section 4.0.

  • Storage The ordering agency is responsible for storage if the contractor delivers within the time required and the agency cannot accept delivery.

  • Storage Tanks If storage tanks storing Hazardous Materials located on the Premises or the Project are used by Tenant or are hereafter placed on the Premises or the Project by Tenant, Tenant shall install, use, monitor, operate, maintain, upgrade and manage such storage tanks, maintain appropriate records, obtain and maintain appropriate insurance, implement reporting procedures, properly close any storage tanks, and take or cause to be taken all other actions necessary or required under applicable state and federal Legal Requirements, as such now exists or may hereafter be adopted or amended in connection with the installation, use, maintenance, management, operation, upgrading and closure of such storage tanks. Notwithstanding anything to the contrary contained herein, Tenant shall have no right to use or install any underground storage tanks at the Project.

  • Recycling If this Agreement provides for the purchase or use of goods specified in PCC 12207 (for example, certain paper products, office supplies, mulch, glass products, lubricating oils, plastic products, paint, antifreeze, tires and tire-derived products, and metal products), this section is applicable with respect to those goods. Without limiting the foregoing, if this Agreement includes (i) document printing, (ii) parts cleaning, or (iii) janitorial and building maintenance services, this section is applicable. Contractor shall use recycled products in the performance of this Agreement to the maximum extent doing so is economically feasible. Upon request, Contractor shall certify in writing under penalty of perjury, the minimum, if not exact, percentage of post consumer material as defined in the PCC 12200, in such goods regardless of whether the goods meet the requirements of PCC 12209. With respect to printer or duplication cartridges that comply with the requirements of PCC 12156(e), the certification required by this subdivision shall specify that the cartridges so comply.

  • Waste Disposal Tenant shall store its waste either inside the Premises or within outside trash enclosures that are fully fenced and screened in compliance with all Private Restrictions, and designed for such purpose. All entrances to such outside trash enclosures shall be kept closed, and waste shall be stored in such manner as not to be visible from the exterior of such outside enclosures. Tenant shall cause all of its waste to be regularly removed from the Premises at Tenant’s sole cost. Tenant shall keep all fire corridors and mechanical equipment rooms in the Premises free and clear of all obstructions at all times.

  • Cleaning 8.1 CONTRACTOR shall, at his own expenses, at all times keep the premises free from accumulation of debris, waste materials, and rubbish, and at the completion of the work, he shall remove his tools and equipment and all surplus materials, debris, waste material, and rubbish and shall leave the premises in a neat and clean condition. If CONTRACTOR does not attend to such cleaning immediately upon request, OWNER shall have the right to have this work done by others and deduct the cost therefore from the payment due CONTRACTOR hereunder.

  • ASBESTOS CONTAINING BUILDING MATERIALS Please be advised that an asbestos survey may have been performed at the Property. If provided, please review the information that identifies the locations of known asbestos containing material or presumed asbestos containing material. All personnel and appropriate subcontractors should be notified of the presence of these materials, and informed not to disturb these materials. Any activity that involves the disturbance or removal of these materials must be done by an appropriately trained individual/contractor.

Time is Money Join Law Insider Premium to draft better contracts faster.