Grading is subjective Sample Clauses

Grading is subjective. Grading is a subjective determination. While numerical grading may give the impression of preci- sion, the numbers in fact represent a nuanced opinion that even experts cannot consistently and systematically agree upon. The grade reflects the opinion of the cataloger (or grader) as to the state of preservation, method of strike, and overall appearance of a particular Precious Metal or lot.
AutoNDA by SimpleDocs

Related to Grading is subjective

  • Performance Expectations The Charter School’s performance in relation to the indicators, measures, metrics and targets set forth in the Comprehensive Performance Framework shall provide the basis upon which the SCSC will decide whether to renew the Charter School’s Charter Contract at the end of the Charter term. This section shall not preclude the SCSC from considering other factors when relevant.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Performance Measure The specific representation of a process or outcome that is relevant to the assessment of performance; it is quantifiable and can be documented

  • PERFORMANCE MEASUREMENTS Upon a particular Commission’s issuance of an Order pertaining to Performance Measurements in a proceeding expressly applicable to all CLECs generally, BellSouth shall implement in that state such Performance Measurements as of the date specified by the Commission. Performance Measurements that have been Ordered in a particular state can currently be accessed via the internet at xxxx://xxxx.xxxxxxxxx.xxx. The following Service Quality Measurements (SQM) plan as it presently exists and as it may be modified in the future, is being included as the performance measurements currently in place for the state of Tennessee. At such time that the TRA issues a subsequent Order pertaining to Performance Measurements, such Performance Measurements shall supersede the SQM contained in the Agreement. BellSouth Service Quality Measurement Plan‌ (SQM) Tennessee Performance Metrics Measurement Descriptions Version 2.00 Issue Date: July 1, 2003 Introduction

  • Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.

  • EVALUATING PERFORMANCE 7.1 The Performance Plan (Annexure A) to this Agreement sets out:

  • Performance Factors (a) Each party will notify the other party of the existence of a Performance Factor, as soon as reasonably possible after the party becomes aware of the Performance Factor. The Notice will:

  • Performance Measurement Satisfactory performance of this Contract will be measured by:

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Evaluation Criteria 5.2.1. The responses will be evaluated based on the following: (edit evaluation criteria below as appropriate for your project)

Time is Money Join Law Insider Premium to draft better contracts faster.