{"component": "clause", "props": {"groups": [{"snippet": "The parties agree that the GMP for the Project is $ , consisting of the Preconstruction Fee, the Estimated Cost of the Work and the CM/GC Fee (stated as a fixed dollar lump sum amount), as follows: Preconstruction Fee: $ Estimated Cost of Work (Est. COW): $ CM/GC Fee ( % of Est. COW): $ GMP (Total of above categories): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC\u2019s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.", "samples": [{"hash": "kQiRUDzKUmo", "uri": "/contracts/kQiRUDzKUmo#gmp", "label": "Cm/Gc Contract", "score": 29.3390369415, "published": true}, {"hash": "9LRue0n9gxF", "uri": "/contracts/9LRue0n9gxF#gmp", "label": "Construction Manager/General Contractor Contract", "score": 28.520565033, "published": true}, {"hash": "keOCvXmYjx2", "uri": "/contracts/keOCvXmYjx2#gmp", "label": "Construction Manager/General Contractor Contract", "score": 28.025100708, "published": true}], "size": 28, "snippet_links": [{"key": "the-parties-agree-that", "type": "clause", "offset": [0, 22]}, {"key": "the-project", "type": "definition", "offset": [35, 46]}, {"key": "preconstruction-fee", "type": "definition", "offset": [72, 91]}, {"key": "work-and", "type": "clause", "offset": [119, 127]}, {"key": "fixed-dollar", "type": "clause", "offset": [155, 167]}, {"key": "lump-sum-amount", "type": "clause", "offset": [168, 183]}, {"key": "estimated-cost-of-work", "type": "definition", "offset": [221, 243]}, {"key": "for-purposes-of", "type": "clause", "offset": [323, 338]}, {"key": "work-includes", "type": "clause", "offset": [386, 399]}, {"key": "costs-for-general-conditions-work", "type": "clause", "offset": [425, 458]}, {"key": "all-components", "type": "clause", "offset": [477, 491]}, {"key": "fully-functional", "type": "definition", "offset": [529, 545]}], "hash": "7cb6ac719be1748892e2a774781b08c9", "id": 1}, {"snippet": "The Guaranteed Maximum Price is composed of the Direct Construction Costs and the Construction Fee. The Construction Manager is at risk to cover any additional Project costs. To the extent the combined total of the Direct Construction Costs and the Construction Fee is less than the GMP, the difference shall be retained by the City.", "samples": [{"hash": "875ychC2l4L", "uri": "/contracts/875ychC2l4L#gmp", "label": "Construction Manager at Risk Agreement", "score": 24.1608486176, "published": true}], "size": 5, "snippet_links": [{"key": "the-guaranteed-maximum-price", "type": "clause", "offset": [0, 28]}, {"key": "direct-construction-costs", "type": "clause", "offset": [48, 73]}, {"key": "construction-fee", "type": "definition", "offset": [82, 98]}, {"key": "the-construction-manager", "type": "clause", "offset": [100, 124]}, {"key": "at-risk", "type": "definition", "offset": [128, 135]}, {"key": "project-costs", "type": "clause", "offset": [160, 173]}, {"key": "to-the-extent", "type": "clause", "offset": [175, 188]}, {"key": "by-the-city", "type": "clause", "offset": [321, 332]}], "hash": "ce1b403e80feb21d64a46c3cc6b921d0", "id": 9}, {"snippet": "As used herein, \u201cGMP\u201d means current good manufacturing practices, including without limitation the FDA\u2019s Quality System Regulations pursuant to Title 21 of the United States Code of Federal Regulations, Part 820, as applicable to the manufacture of a Class 2 medical instrument to gain 510(k) approval by the FDA.", "samples": [{"hash": "gKTDDmCNp69", "uri": "/contracts/gKTDDmCNp69#gmp", "label": "Supply and Manufacturing Agreement", "score": 31.3408622742, "published": true}, {"hash": "7pZxjMS9hqR", "uri": "/contracts/7pZxjMS9hqR#gmp", "label": "Supply and Manufacturing Agreement (Quanterix Corp)", "score": 28.8548946381, "published": true}, {"hash": "lWofy4oBivX", "uri": "/contracts/lWofy4oBivX#gmp", "label": "Supply and Manufacturing Agreement (Quanterix Corp)", "score": 28.6249141693, "published": true}], "size": 12, "snippet_links": [{"key": "current-good-manufacturing-practices", "type": "definition", "offset": [28, 64]}, {"key": "including-without-limitation", "type": "clause", "offset": [66, 94]}, {"key": "the-fda", "type": "clause", "offset": [95, 102]}, {"key": "quality-system-regulations", "type": "definition", "offset": [105, 131]}, {"key": "pursuant-to-title", "type": "clause", "offset": [132, 149]}, {"key": "united-states-code-of-federal-regulations", "type": "definition", "offset": [160, 201]}, {"key": "applicable-to", "type": "clause", "offset": [216, 229]}, {"key": "class-2", "type": "definition", "offset": [251, 258]}, {"key": "medical-instrument", "type": "definition", "offset": [259, 277]}, {"key": "approval-by", "type": "clause", "offset": [293, 304]}], "hash": "c639401c07507d43dc4966d20e2ac1cf", "id": 3}, {"snippet": "As a result of the Due Diligence of Contractor, the GMP for the Project is set forth under Article 3. The GMP is based upon all Due Diligence performed, the approved Construction Documents, and all other Contract Documents existing and reviewed by the Contractor at the time this Construction Services Agreement is entered into as more fully described and referenced in the Scope of Work set forth in Exhibit \u201cA.\u201d Contractor\u2019s detailed line item costing of the Project, or Master Budget, totaling the GMP is attached hereto as Exhibit \u201cB.\u201d Furthermore, the District and Contractor represent and warrant that the GMP is separate and distinct from the Sublease Payments to be paid by the District under the Sublease. The GMP is an \u201call inclusive\u201d price for the construction of the Project that is calculated after Due Diligence and shall not be exceeded except as set forth in this Agreement. Contractor has taken on all contingencies and calculated those contingencies out in the form of the Construction Contingency. Contractor specifically agrees that once the Construction Contingency is fully exhausted, that Contractor can and shall Complete the Project pursuant to the terms of this Agreement within the Contract Time. No disputes concerning compensation, extras, or application of Contingencies shall be utilized as grounds to slow down or to stop work. The following two contingencies have been calculated through the Due Diligence of the Contractor and shall be calculated against the contingency amounts based on application of the Change Order language of Article 17.", "samples": [{"hash": "d4dwP4tXNQ", "uri": "/contracts/d4dwP4tXNQ#gmp", "label": "Construction Services Agreement", "score": 34.421875, "published": true}, {"hash": "igEpTqSD2Iu", "uri": "/contracts/igEpTqSD2Iu#gmp", "label": "Construction Services Agreement", "score": 29.0642852783, "published": true}, {"hash": "bWeJyVYTzX0", "uri": "/contracts/bWeJyVYTzX0#gmp", "label": "Construction Services Agreement", "score": 27.5147151947, "published": true}], "size": 8, "snippet_links": [{"key": "due-diligence", "type": "definition", "offset": [19, 32]}, {"key": "of-contractor", "type": "clause", "offset": [33, 46]}, {"key": "article-3", "type": "definition", "offset": [91, 100]}, {"key": "approved-construction-documents", "type": "definition", "offset": [157, 188]}, {"key": "other-contract-documents", "type": "clause", "offset": [198, 222]}, {"key": "by-the-contractor", "type": "clause", "offset": [245, 262]}, {"key": "at-the-time", "type": "definition", "offset": [263, 274]}, {"key": "construction-services-agreement", "type": "definition", "offset": [280, 311]}, {"key": "entered-into", "type": "clause", "offset": [315, 327]}, {"key": "the-scope-of-work", "type": "clause", "offset": [370, 387]}, {"key": "line-item", "type": "clause", "offset": [436, 445]}, {"key": "master-budget", "type": "definition", "offset": [473, 486]}, {"key": "attached-hereto-as-exhibit", "type": "definition", "offset": [508, 534]}, {"key": "district-and-contractor", "type": "clause", "offset": [557, 580]}, {"key": "separate-and-distinct", "type": "clause", "offset": [619, 640]}, {"key": "payments-to-be", "type": "clause", "offset": [659, 673]}, {"key": "by-the-district", "type": "clause", "offset": [679, 694]}, {"key": "all-inclusive", "type": "clause", "offset": [730, 743]}, {"key": "construction-of-the-project", "type": "definition", "offset": [759, 786]}, {"key": "in-this-agreement", "type": "definition", "offset": [872, 889]}, {"key": "form-of", "type": "clause", "offset": [979, 986]}, {"key": "the-construction-contingency", "type": "clause", "offset": [987, 1015]}, {"key": "complete-the-project", "type": "definition", "offset": [1137, 1157]}, {"key": "terms-of-this-agreement", "type": "clause", "offset": [1174, 1197]}, {"key": "the-contract-time", "type": "clause", "offset": [1205, 1222]}, {"key": "disputes-concerning", "type": "clause", "offset": [1227, 1246]}, {"key": "stop-work", "type": "definition", "offset": [1349, 1358]}, {"key": "of-the-contractor", "type": "clause", "offset": [1439, 1456]}, {"key": "based-on", "type": "definition", "offset": [1513, 1521]}, {"key": "the-change-order", "type": "clause", "offset": [1537, 1553]}, {"key": "language-of", "type": "clause", "offset": [1554, 1565]}, {"key": "article-17", "type": "definition", "offset": [1566, 1576]}], "hash": "e40984873c047745ca3a4b35c1b66b53", "id": 5}, {"snippet": "The Contract Sum shall not exceed the amount specified in the GMP, as set forth in the GMP Acceptance, as it may be amended from time to time.", "samples": [{"hash": "9SSzj46tEaW", "uri": "/contracts/9SSzj46tEaW#gmp", "label": "Construction Manager at Risk Contract", "score": 33.0471534729, "published": true}, {"hash": "9kcEaDTJ55g", "uri": "/contracts/9kcEaDTJ55g#gmp", "label": "Construction Manager at Risk Contract", "score": 31.8728237152, "published": true}, {"hash": "igfWfCsw1OJ", "uri": "/contracts/igfWfCsw1OJ#gmp", "label": "Construction Manager at Risk Contract", "score": 31.8563995361, "published": true}], "size": 4, "snippet_links": [{"key": "the-contract-sum", "type": "clause", "offset": [0, 16]}, {"key": "gmp-acceptance", "type": "clause", "offset": [87, 101]}, {"key": "from-time-to-time", "type": "clause", "offset": [124, 141]}], "hash": "36e2ec1fb66706ed97e732fe70e881e8", "id": 10}, {"snippet": "The Project Consultant shall review and comment on GMP proposal(s) submitted by CM including all qualifications and assumptions set forth therein,", "samples": [{"hash": "2E5rf5Duken", "uri": "/contracts/2E5rf5Duken#gmp", "label": "Professional Services", "score": 26.2566738129, "published": true}, {"hash": "huhD7os9Ew1", "uri": "/contracts/huhD7os9Ew1#gmp", "label": "Professional Services", "score": 25.0807666779, "published": true}, {"hash": "g5eghBqcwBO", "uri": "/contracts/g5eghBqcwBO#gmp", "label": "Professional Services Agreement", "score": 25.0013694763, "published": true}], "size": 15, "snippet_links": [{"key": "consultant-shall", "type": "clause", "offset": [12, 28]}, {"key": "review-and-comment", "type": "clause", "offset": [29, 47]}, {"key": "submitted-by", "type": "clause", "offset": [67, 79]}, {"key": "qualifications-and-assumptions", "type": "clause", "offset": [97, 127]}], "hash": "3272290df18299e7527ab564d18e6cb5", "id": 2}, {"snippet": "As a result of the Due Diligence of Contractor, the GMP for the Project is set forth under Article 3. The GMP is based upon all Due Diligence performed, the approved Construction Documents, and all other Contract Documents existing and reviewed by the Contractor at the time this Construction Services Agreement is entered into as more fully described and referenced in the Scope of Work set forth in Exhibit \u201cA.\u201d Contractor\u2019s detailed line item costing of the Project, or Master Budget, totaling the GMP is attached hereto as Exhibit \u201cB.\u201d Furthermore, the District and Contractor represent and warrant that the GMP is separate and distinct from the Sublease Payments to be paid by the District under the Sublease. District represents and warrants and Contractor acknowledges that: 1) the total amount of Sublease Payments and any optional Prepayment under the Sublease include the total rental for the Project, which total does not exceed the fair market value for the Project, 2) said rental amount is separate and distinct from Progress Payments and Retention, and 3) said rental amount shall be paid by the District with District non-local match contribution local funds. The GMP is an \u201call inclusive\u201d price for the construction of the Project that is calculated after Due Diligence and shall not be exceeded except as set forth in this Agreement. Contractor has taken on all contingencies and calculated those contingencies out in the form of the Construction Contingency. Contractor specifically agrees that once the Construction Contingency is fully exhausted, that Contractor can and shall Complete the Project pursuant to the terms of this Agreement within the Contract Time. No disputes concerning compensation, extras, or application of Contingencies shall be utilized as grounds to slow down or to stop work. The following two contingencies have been calculated through the Due Diligence of the Contractor and shall be calculated against the contingency amounts based on application of the Change Order language of Article 17.", "samples": [{"hash": "a9xFtmsQhU7", "uri": "/contracts/a9xFtmsQhU7#gmp", "label": "Construction Services Agreement", "score": 33.4084854126, "published": true}, {"hash": "7Shzdqf8udO", "uri": "/contracts/7Shzdqf8udO#gmp", "label": "Construction Services Agreement", "score": 32.7597312927, "published": true}, {"hash": "aUARCWJVQ3v", "uri": "/contracts/aUARCWJVQ3v#gmp", "label": "Construction Services Agreement", "score": 32.1520347595, "published": true}], "size": 7, "snippet_links": [{"key": "due-diligence", "type": "definition", "offset": [19, 32]}, {"key": "of-contractor", "type": "clause", "offset": [33, 46]}, {"key": "article-3", "type": "definition", "offset": [91, 100]}, {"key": "approved-construction-documents", "type": "definition", "offset": [157, 188]}, {"key": "other-contract-documents", "type": "clause", "offset": [198, 222]}, {"key": "by-the-contractor", "type": "clause", "offset": [245, 262]}, {"key": "at-the-time", "type": "definition", "offset": [263, 274]}, {"key": "construction-services-agreement", "type": "definition", "offset": [280, 311]}, {"key": "entered-into", "type": "clause", "offset": [315, 327]}, {"key": "the-scope-of-work", "type": "clause", "offset": [370, 387]}, {"key": "line-item", "type": "clause", "offset": [436, 445]}, {"key": "master-budget", "type": "definition", "offset": [473, 486]}, {"key": "attached-hereto-as-exhibit", "type": "definition", "offset": [508, 534]}, {"key": "district-and-contractor", "type": "clause", "offset": [557, 580]}, {"key": "separate-and-distinct", "type": "clause", "offset": [619, 640]}, {"key": "payments-to-be", "type": "clause", "offset": [659, 673]}, {"key": "by-the-district", "type": "clause", "offset": [679, 694]}, {"key": "total-amount", "type": "definition", "offset": [789, 801]}, {"key": "optional-prepayment", "type": "clause", "offset": [831, 850]}, {"key": "total-rental", "type": "definition", "offset": [882, 894]}, {"key": "the-fair-market-value", "type": "clause", "offset": [940, 961]}, {"key": "rental-amount", "type": "clause", "offset": [987, 1000]}, {"key": "progress-payments-and-retention", "type": "clause", "offset": [1031, 1062]}, {"key": "match-contribution", "type": "definition", "offset": [1144, 1162]}, {"key": "local-funds", "type": "definition", "offset": [1163, 1174]}, {"key": "all-inclusive", "type": "clause", "offset": [1191, 1204]}, {"key": "construction-of-the-project", "type": "definition", "offset": [1220, 1247]}, {"key": "in-this-agreement", "type": "definition", "offset": [1333, 1350]}, {"key": "form-of", "type": "clause", "offset": [1440, 1447]}, {"key": "the-construction-contingency", "type": "clause", "offset": [1448, 1476]}, {"key": "complete-the-project", "type": "definition", "offset": [1598, 1618]}, {"key": "terms-of-this-agreement", "type": "clause", "offset": [1635, 1658]}, {"key": "the-contract-time", "type": "clause", "offset": [1666, 1683]}, {"key": "disputes-concerning", "type": "clause", "offset": [1688, 1707]}, {"key": "stop-work", "type": "definition", "offset": [1810, 1819]}, {"key": "of-the-contractor", "type": "clause", "offset": [1900, 1917]}, {"key": "based-on", "type": "definition", "offset": [1974, 1982]}, {"key": "the-change-order", "type": "clause", "offset": [1998, 2014]}, {"key": "language-of", "type": "clause", "offset": [2015, 2026]}, {"key": "article-17", "type": "definition", "offset": [2027, 2037]}], "hash": "a187d1a81cfb116a36eb716db0e22708", "id": 6}, {"snippet": "The parties agree that the GMP for the Project is $ , consisting of the Preconstruction Fee, the Estimated Cost of the Work and the CM/GC Fee (stated as a fixed dollar lump sum amount), as follows: CM/GC Fee ( % of Est. COW): $ For purposes of determining the GMP, the Estimated Cost of the Work includes the CM/GC\u2019s Contingency, costs for General Conditions Work, and the costs of all components and systems required for a complete, fully functional facility.", "samples": [{"hash": "dvKVc6rncze", "uri": "/contracts/dvKVc6rncze#gmp", "label": "Construction Manager/General Contractor Agreement", "score": 24.1704311371, "published": true}, {"hash": "44R1JNpnFL7", "uri": "/contracts/44R1JNpnFL7#gmp", "label": "Construction Manager/General Contractor Contract", "score": 21.3613967896, "published": true}], "size": 9, "snippet_links": [{"key": "the-parties-agree-that", "type": "clause", "offset": [0, 22]}, {"key": "the-project", "type": "definition", "offset": [35, 46]}, {"key": "preconstruction-fee", "type": "definition", "offset": [72, 91]}, {"key": "work-and", "type": "clause", "offset": [119, 127]}, {"key": "fixed-dollar", "type": "clause", "offset": [155, 167]}, {"key": "lump-sum-amount", "type": "clause", "offset": [168, 183]}, {"key": "for-purposes-of", "type": "clause", "offset": [228, 243]}, {"key": "work-includes", "type": "clause", "offset": [291, 304]}, {"key": "costs-for-general-conditions-work", "type": "clause", "offset": [330, 363]}, {"key": "all-components", "type": "clause", "offset": [382, 396]}, {"key": "fully-functional", "type": "definition", "offset": [434, 450]}], "hash": "ef61114365b0bd9dbe6a0c5609b59b15", "id": 4}, {"snippet": "The parties agree that the GMP for the Project is $_______________, consisting of the Preconstruction Fee, Cost of the Work, Construction Manager at Risk Fee (stated as a fixed dollar lump sum amount), and the SGC Work as follows: Preconstruction Fee: $ ________________ Cost of the Work:* $ ________________ GMP (Total of above categories):** $ ________________ TOTAL $_________________ *excluding cost of 3-Year Extended Service & Maintenance **excluding Pre-Construction Fee For purposes of determining the GMP, the GMP includes the Construction Manager at Risk\u2019s Contingency, the Construction Manager at Risk Field Work, and the costs of all components and systems required for a complete, fully functional facility.", "samples": [{"hash": "1zBwbfWQhAP", "uri": "/contracts/1zBwbfWQhAP#gmp", "label": "Construction Manager at Risk Agreement", "score": 25.5790557861, "published": true}, {"hash": "9eIhO9pVIHV", "uri": "/contracts/9eIhO9pVIHV#gmp", "label": "Construction Manager at Risk Agreement", "score": 24.8439426422, "published": true}, {"hash": "cJP7fQaxn8j", "uri": "/contracts/cJP7fQaxn8j#gmp", "label": "Construction Manager at Risk Agreement", "score": 24.622177124, "published": true}], "size": 5, "snippet_links": [{"key": "the-parties-agree-that", "type": "clause", "offset": [0, 22]}, {"key": "the-project", "type": "definition", "offset": [35, 46]}, {"key": "preconstruction-fee", "type": "definition", "offset": [86, 105]}, {"key": "cost-of-the-work", "type": "definition", "offset": [107, 123]}, {"key": "risk-fee", "type": "definition", "offset": [149, 157]}, {"key": "fixed-dollar", "type": "clause", "offset": [171, 183]}, {"key": "lump-sum-amount", "type": "clause", "offset": [184, 199]}, {"key": "extended-service", "type": "clause", "offset": [414, 430]}, {"key": "for-purposes-of", "type": "clause", "offset": [478, 493]}, {"key": "the-construction-manager", "type": "clause", "offset": [532, 556]}, {"key": "field-work", "type": "clause", "offset": [613, 623]}, {"key": "all-components", "type": "clause", "offset": [642, 656]}, {"key": "fully-functional", "type": "definition", "offset": [694, 710]}], "hash": "6553e06258615228e28d4036dc7ab255", "id": 8}, {"snippet": "The term \u201c", "samples": [{"hash": "7uWGVx1DHQa", "uri": "/contracts/7uWGVx1DHQa#gmp", "label": "Research Collaboration and License Agreement (HOOKIPA Pharma Inc.)", "score": 33.7994537354, "published": true}, {"hash": "enrj62DIl7y", "uri": "/contracts/enrj62DIl7y#gmp", "label": "Pilot Collaboration and Option Agreement (Synlogic, Inc.)", "score": 32.6112251282, "published": true}, {"hash": "9TPCWXoKvl", "uri": "/contracts/9TPCWXoKvl#gmp", "label": "License and Collaboration Agreement (SQZ Biotechnologies Co)", "score": 31.7707042694, "published": true}], "size": 6, "snippet_links": [{"key": "the-term", "type": "definition", "offset": [0, 8]}], "hash": "e6abc5b81feb3c0a954d10eb23e67d9b", "id": 7}], "next_curs": "CkwSRmoVc35sYXdpbnNpZGVyY29udHJhY3RzcigLEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IgxnbXAjMDAwMDAwMGEMogECZW4YACAA", "clause": {"title": "GMP", "parents": [["definitions", "Definitions"], ["miscellaneous", "Miscellaneous"], ["establishment-of-guaranteed-maximum-price-gmp", "ESTABLISHMENT OF GUARANTEED MAXIMUM PRICE \u201cGMP"], ["basic-services", "Basic Services"], ["construction-manager-deliverables-project-consultants-duty-to-review-and-respond", "Construction Manager Deliverables/Project Consultants Duty to Review and Respond"]], "size": 195, "children": [["construction-contingency", "Construction Contingency"], ["errors-and-omissions-contingency", "Errors and Omissions Contingency"], ["project-contingency", "Project Contingency"], ["bonds", "Bonds"], ["design-build-entitys-general-conditions", "Design Build Entity\u2019s General Conditions"]], "id": "gmp", "related": [["product-specifications", "Product Specifications", "Product Specifications"], ["manufacturing", "Manufacturing", "Manufacturing"], ["api", "API", "API"], ["quality-standards", "Quality Standards", "Quality Standards"], ["technical-specifications", "Technical Specifications", "Technical Specifications"]], "related_snippets": [], "updated": "2025-08-07T04:22:56+00:00"}, "json": true, "cursor": ""}}