Galvanising Sample Clauses

Galvanising. All galvanising to be carried out in accordance with AS1627, AS2313.2, AS/NZS4680 and AS5131 and under the supervision of a competent person. Quality inspection, testing and reports are to be provided in accordance with AS2331.
AutoNDA by SimpleDocs
Galvanising. General Galvanising of iron and steel articles shall be carried out by the hot dip process. The preparation for galvanising and the galvanising process shall not adversely affect the mechanical properties of the material coated. All galvanising shall be in accordance with BS 729, ISO 1460 or an equivalent approved standard to give a uniform thickness, free from defects and a minimum average coating weight. Galvanised finned tubing shall have a minimum average thickness of 70 microns. Other methods of depositing zinc coating such as sheradising, electroplating or metal spraying shall not be used unless specifically approved.Surfaces which are in contact with fluid shall not be galvanised or cadmium plated. The identifying marks on any galvanised parts shall be stamped before galvanising is applied and shall be clearly legible afterwards. Zinc coated fasteners such as nuts and bolts should be lubricated with beeswax or other suitable lubricant prior to fitting and tightening. Material on which the galvanising has been damaged shall be re-dipped.
Galvanising. (i) Hydraulic and/or mechanical press work and/or roll forming of pipe ends and/or collar type joints.
Galvanising. Gratings and the fixing clamps, bolts, nuts shall be cleaned with wire brush and galvanization shall be done in accordance with IS: 2629 and tested as per IS: 2633 and IS: 6745. Quantity of zinc coating shall be minimum 900 gms/sq.m. of surface area (0.12 mm uniform thickness).
Galvanising a) Sample Tests Representative samples, selected by the Engineer of all galvanised material shall be submitted to galvanising tests. Galvanised fittings associated with insulators, and steel cores for aluminium conductor steel reinforced cables shall be tested in line with the relevant IEC Recommendation. All other fittings, fabrications, hardware and fixings shall be inspected and tested in accordance with ISO Recommendations R1460 and R1461.

Related to Galvanising

  • Dewatering 4.7.1 Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, all non- trades employees shall assist in ‘dewatering’ their own work site or area if it is so affected. Such work to be paid at single time rates. Productive work will continue in areas not so affected.

  • Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • FABRICATION Making up data or results and recording or reporting them.

  • Skidding and Yarding Methods of skid- ding or yarding specified for particular areas, if any, are indicated on Sale Area Map. Outside Clearcutting Units and construction clearings, insofar as ground conditions permit, products shall not be skidded against reserve trees or groups of reproduction and tractors shall be equipped with a winch to facilitate skidding. B6.421 Rigging. Insofar as practicable, needed rigging shall be slung on stumps or trees desig- nated for cutting.

  • Bullying The Employer and the Union agree that behaviors that harm, intimidate or coerce vulnerable individuals can contribute to a hostile work environment. Examples of such behavior include, but are not limited to:

  • Safety Glasses 10.3.1 Where a teacher is considered to be working in an “eye danger” area, the teacher shall receive a personal issue of standard neutral safety glasses which shall remain the property of the employer.

  • Beëindiging Deze licentie is xxx xxxxxx totdat deze wordt beëindigd. Uw rechten ingevolge deze licentie vervallen automatisch, zonder aankondiging van Apple, als u niet voldoet aan een of meer van de voorwaarden van deze licentie. Nadat de geldigheid van deze licentie is verlopen, dient u elk gebruik van de Apple software xx xxxxxx en alle volledige of gedeeltelijke kopieën van de Apple software die in uw bezit zijn, te vernietigen.

  • CUTTING AND PATCHING The Contractor shall be responsible for cutting, fitting or patching required to complete the Work or to make its parts fit together properly.

  • MASONRY 4.1 Storm Shelter Area/Tornado Protection: In new building construction, provide lateral and vertical bracing in the walls around the employee toilet rooms. DIVISION 5 – METALS

Time is Money Join Law Insider Premium to draft better contracts faster.