Frontage Roads. DB Contractor shall design and construct frontage roads along the existing alignments. The design shall consist of widening frontage road pavement, as needed, to accommodate the Basic Configuration shown in the TxDOT Schematic Design. All frontage road and existing intersection pavement within the limits described below shall be considered Rehabilitation Pavement Areas for which DB Contractor shall design and construct pavement milling and overlay: a) Along I-69C Northbound: From STA 808+75 to I-2/Cage Blvd. intersection. b) Along I-69C Southbound: From STA 808+90 to I-2/Cage Blvd. intersection. c) Along I-2 Eastbound: From STA 149+00 to Exit Ramp REXCES, approximate STA 461+00. d) Along I-2 Westbound: From STA 152+00 to Ramp RWECES, approximate STA 461+50. DB Contractor shall design and construct frontage road widening to accommodate the basic configuration as shown on the TxDOT Schematic Design and as described below (New Pavement): 2.4.1. I-2 Eastbound:
Appears in 2 contracts
Sources: Design Build Agreement, Design Build Agreement