FLOW METER PROVING FREQUENCY Sample Clauses

FLOW METER PROVING FREQUENCY. On a scheduled Day of each Month, or at other mutually agreeable intervals, Dynegy or Dynegy's designee shall test and verify the accuracy of its measurement equipment in accordance with the appropriate referenced standards. Dynegy or its designee shall give DLMT notice of the date and time of each test sufficiently in advance (48 hours minimum) to permit DLMT to have a Exhibit B Page 1 representative present to witness such test result. Calibration records of either Dynegy's or DLMT's measurement equipment shall be available for review by either Party.
AutoNDA by SimpleDocs

Related to FLOW METER PROVING FREQUENCY

  • Switching System Hierarchy and Trunking Requirements For purposes of routing iNetworks traffic to Verizon, the subtending arrangements between Verizon Tandems and Verizon End Offices shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to iNetworks, the subtending arrangements between iNetworks Tandems and iNetworks End Offices shall be the same as the Tandem/End Office subtending arrangements that iNetworks maintains for the routing of its own or other carriers’ traffic.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):

  • Low Census Low census is defined as a decline in patient care requirements resulting in a temporary staff decrease. During periods of low census, the Employer will assign low census to nurses in the following order:

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Registry Performance Specifications Registry Performance Specifications for operation of the TLD will be as set forth in Specification 10 attached hereto (“Specification 10”). Registry Operator shall comply with such Performance Specifications and, for a period of at least one (1) year, shall keep technical and operational records sufficient to evidence compliance with such specifications for each calendar year during the Term.

Time is Money Join Law Insider Premium to draft better contracts faster.