Fishing Vessels Sample Clauses

Fishing Vessels. Vessels engaged in fishing, as defined in Rule 2, shall stay well clear of the navigable waters of the Canal Operation Compatibility Area.
AutoNDA by SimpleDocs

Related to Fishing Vessels

  • Vessels Each Vessel is

  • Containers The marine and intermodal cargo containers either owned or leased by the Borrower and employed by the Borrower in the conduct of its business, including, without limitation, refrigerated, dry van, tank, open top and flat rack containers and refrigeration units and generator sets associated therewith, but excluding any chassis for such containers.

  • Drop Shipped Off loaded by carrier to an Agency loading dock or designated area. There will be no charge to the ordering Agency for this delivery method.

  • Loading RPMG shall schedule the loading and shipping of all outbound corn oil purchased hereunder, but all labor and equipment necessary to load trucks and rail cars and other associated costs shall be supplied and borne by Producer without charge to RPMG. Producer shall handle the corn oil in a good and workmanlike manner in accordance with RPMG’s written requirements and normal industry practice. Producer shall maintain the truck and rail loading facilities in safe operating condition in accordance with normal industry standards and shall visually inspect all trucks and rail cars to assure (i) cleanliness so as to avoid contamination, and (ii) that such trucks and railcars are in a condition suitable for transporting the corn oil. RPMG and RPMG’s agents shall have adequate access to the Ethanol Facility to load Producer’s corn oil on an industry standard basis that allows RPMG to economically market Producer’s corn oil. RPMG’s employees shall follow all reasonable safety rules and procedures promulgated by Producer and provided to RPMG reasonably in advance and in writing. Producer shall supply product description tags, certificates of analysis, bills of lading and/or material safety data sheets that are applicable to all shipments. In the event that Producer fails to provide the labor, equipment and facilities necessary to meet RPMG’s loading schedule, Producer shall be responsible for all costs and expenses, including without limitation actual demurrage and wait time, incurred by RPMG resulting from or arising in connection with Producer’s failure to do so.

  • As-Builts Seller shall provide final as-built drawings of the Seller-Owned Interconnection Facilities within 30 Days of the successful completion of the Acceptance Test.

  • Trailers You are insured against claims arising out of your ownership, use or operation of any trailer or its equipment, provided that such trailer is not being towed by, attached to or carried on a motorized vehicle. Business or Business Use

  • Plant The expression ‘Plant’ as used in the tender papers shall mean every temporary accessory necessary or considered necessary by the Engineer to execute, construct, complete and maintain the work and all altered, modified, substituted and additional works ordered in the time and the manner herein provided and all temporary materials and special and other articles and appliance of every sort kind and description whatsoever intended or used therefore.

  • Leave Loading 10.2 The employer and the individual employee must have genuinely made the agreement without coercion or duress.

  • Escorting Visitors Visitors to areas where PHI COUNTY discloses to 4 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY is 5 contained shall be escorted and such PHI shall be kept out of sight while visitors are in the area.

  • Fishery 1. The objective of cooperation on fishery will be to strengthen the research and productive capacities for the development

Time is Money Join Law Insider Premium to draft better contracts faster.