Common use of Fire Protection System Clause in Contracts

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Expansion Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Description (pounds per square foot) Slurry Tank 4,000 Liquifaction Tank 3,500 Fermentation Tank 5,000 All Other Areas 3,000 Platte Valley Fuel Ethanol, LLC April 24, 2006 Owner’s Responsibilities To Proceed Notice to Proceed * **** Storm Water Permits Complete * **** Natural Gas/Propane Supply Agreements Complete * **** Water Supply and Service Agreements Complete * **** Risk Insurance Provider Selected/Fire Protection Requirements Known * **** NPDES Discharge Point Selected * **** Electrical Service * **** Water Pre-Treatment System Design Complete * **** Wastewater Discharge System Complete * **** Operating Permits Complete * **** Discharge Permits Complete * **** Pumphouse/Water Pre-treatment System Complete * **** Fire Protection System Complete * **** Administrative Building Complete * **** Paving (Expansion Plant Roads) Complete * **** Rail Spur Complete * **** Employees Hired and Ready for Training * **** Natural Gas Pipeline Complete * **** Platte Valley Fuel Ethanol, LLC April 24, 2006 THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 24th day of April, 2006 (“Effective Date”) by and between Platte Valley Fuel Ethanol, LLC, a Nebraska limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Sources: Lump Sum Design Build Expansion Agreement (US BioEnergy CORP)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Expansion Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure — Responsibility of Owner Description Required Allowable Soil Bearing Pressure (pounds per square foot) Slurry Tank 4,000 Liquifaction Liquefaction Tank 3,500 Fermentation Tank 5,000 4,500 All Other Areas 3,000 Platte Valley Fuel Ethanol, LLC April 24, 2006 Table 2 Owner’s Milestones Owner’s Responsibilities Notice to Proceed Number Of Days To Be Completed After Notice To Proceed Notice to Proceed * **** 0 Storm Water Permits Complete * **** 60 Natural Gas/Propane Supply Agreements Complete * **** 90 Water Supply and Service Agreements Complete * **** 90 Risk Insurance Provider Selected/Fire Protection Requirements Known * **** 90 NPDES Discharge Point Selected * **** 90 Electrical Service * **** 90 Water Pre-Treatment System Design Complete * **** 170 Wastewater Discharge System Complete * **** 180 Operating Permits Complete * **** 200 Discharge Permits Complete * **** 200 Pumphouse/Water Pre-treatment System Complete * **** 305 Fire Protection System Complete * **** 305 Administrative Building Complete * **** 90 days prior to SC Paving (Expansion Plant Roads) Complete * **** 90 days prior to SC Rail Spur Complete * **** 90 days prior to SC Employees Hired and Ready for Training * **** 60 days prior to SC Natural Gas Pipeline Complete * **** Platte Valley Fuel Ethanol, LLC April 24, 2006 60 days prior to SC EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 24th day of AprilSeptember 20, 2006 (“Effective Date”) by and between Platte Valley Fuel EthanolLittle Sioux Corn Processors, LLCLP, a Nebraska an Iowa limited liability company partnership (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Sources: Lump Sum Design Build Expansion Agreement (Little Sioux Corn Processors LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Expansion Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Description (pounds per square foot) Table 1 Minimum Soil Bearing Pressure – Responsibility of Owner Slurry Tank 4,000 Liquifaction Tank 3,500 Fermentation Tank 5,000 All Other Areas 3,000 Platte Valley Fuel Ethanol, LLC April 24, 2006 Owner’s Responsibilities To Proceed Notice to Proceed * **** 0 Storm Water Permits Complete * **** 60 Natural Gas/Propane Supply Agreements Complete * **** 90 Water Supply and Service Agreements Complete * **** 90 Risk Insurance Provider Selected/Fire Protection Requirements Known * **** 90 NPDES Discharge Point Selected * **** 90 Electrical Service * **** 90 Water Pre-Treatment System Design Complete * **** 170 Wastewater Discharge System Complete * **** 180 Operating Permits Complete * **** 200 Discharge Permits Complete * **** 200 Pumphouse/Water Pre-treatment System Complete * **** 305 Fire Protection System Complete * **** 305 Administrative Building Complete * **** 90 days prior to SC Paving (Expansion Plant Roads) Complete * **** 90 days prior to SC Rail Spur Complete * **** 90 days prior to SC Employees Hired and Ready for Training * **** 60 days prior to SC Natural Gas Pipeline Complete * **** Platte Valley Fuel Ethanol, LLC April 24, 2006 THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as 60 days prior to SC E-1 q MANPOWER TOTALS q q SAFETY ISSUES 1. text 2. text 1. text 2. text 1. text 2. text 1. text 2. text ▇▇▇▇ ▇. text 2. text Area 1. text 2. text Area 1. text 2. q MILLWRIGHT 1. text 2. q PIPE 2. q ELECTRICAL 1. text 2. Area 1. text Subcontractor Name 1. text No. Type of the 24th day of April, 2006 (“Effective Date”) by and between Platte Valley Fuel Ethanol, LLC, a Nebraska limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).Application/Permit Responsibility for Obtaining Permit Assistance in Preparation Notes

Appears in 1 contract

Sources: Lump Sum Design Build Expansion Agreement (Golden Grain Energy)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Expansion Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Description (pounds per square foot) Slurry Table 1 Minimum Soil Bearing Pressure – Responsibility of Owner ** Subject to revision based on detailed design and engineering. Grain Storage Silos 8,000 DDGS Storage Silos 8,000 Corn/DDGS Building 4,000 ▇▇▇▇ Water Tank 4,000 Liquifaction 3,500 Methanator Feed Tank 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Beerwell 5,000 Whole Stillage Tank 3,500 Thin Stillage Tank 3,500 Syrup Tank 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 4,000 Denatured Ethanol Tank #2 4,000 All Other Areas 3,000 Platte Valley Fuel EthanolTable 2 Maintenance and Power Equipment – Responsibility of Owner Spare Parts Spare parts Partsbins Misc. materials, LLC April 24supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, 2006 Owneretc. Safety showers as required Rolling stock Used 1 ½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile Temporary Electrical Service In Place 0 Obtain Builder’s Responsibilities To Proceed Notice to Proceed * **** Risk policy in the amount of the Contract Price, obtain Boiler and Machinery Insurance, and obtain Terrorism Coverage per TRIA as long as it is required under Article 17 of the Agreement. 0 Storm Water Permits Complete * **** Complete: Modify the existing storm water discharge permit to reflect the ethanol plant, if required. 60 Natural Gas/Propane Supply Agreements Transportation / Storage Agreement Complete * **** 90 Water Supply and Service Agreements Complete * **** Risk Insurance Provider Selected/Fire Protection Requirements Known * **** NPDES Discharge Point Selected * **** 90 Electrical Service * **** Water Pre-Treatment System Design Complete * **** Arrangement 90 Wastewater Discharge System Complete * **** 180 TTB Operating Permits Complete * **** 200 Discharge Permits Complete * **** 200 Pumphouse/Water Pre-treatment System Complete * **** 305 Fire Protection System Complete * **** Administrative Building Complete * **** 305 Paving (Expansion Plant Roads) Complete * **** 90 days prior to SC Rail Spur Complete * **** 90 days prior to SC Permanent Electrical Service Complete 60 days prior to SC Maintenance and Power Equipment Onsite (Table 2) 60 days prior to SC Employees Hired and Ready for Training * **** 60 days prior to SC Natural Gas Pipeline Pipeline/Delivery System Complete * **** Platte Valley Fuel Ethanol, LLC April 24, 2006 60 days prior to SC THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 24th 28th day of AprilSeptember, 2006 (“Effective Date”) by and between Platte Valley Fuel Highwater Ethanol, LLC, a Nebraska Minnesota limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Sources: Lump Sum Design Build Agreement (Highwater Ethanol LLC)