Common use of Fire Protection System Clause in Contracts

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure — Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 5,000 Xxxx Water Tank 4,500 Methanator Feed Tank 4,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 Thin Stillage Tank 4,500 Syrup Tank 4,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 All Other Areas 3,000 Table 2 Maintenance and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th day of March, 2006 (“Effective Date”) by and between Advanced BioEnergy, LLC, a Delaware Limited Liability Company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: Lump Sum Design Build Contract (Advanced BioEnergy, LLC)

AutoNDA by SimpleDocs

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Expansion Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure Description (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 5,000 Xxxx Water Slurry Tank 4,500 Methanator Feed 4,000 Liquifaction Tank 4,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 Thin Stillage Tank 4,500 Syrup Tank 4,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 All Other Areas 3,000 Platte Valley Fuel Ethanol, LLC April 24, 2006 Table 2 Maintenance Owner’s Milestones Number Of Days To Be Completed After Notice Owner’s Responsibilities To Proceed Notice to Proceed * **** Storm Water Permits Complete * **** Natural Gas/Propane Supply Agreements Complete * **** Water Supply and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materialsService Agreements Complete * **** Risk Insurance Provider Selected/Fire Protection Requirements Known * **** NPDES Discharge Point Selected * **** Electrical Service * **** Water Pre-Treatment System Design Complete * **** Wastewater Discharge System Complete * **** Operating Permits Complete * **** Discharge Permits Complete * **** Pumphouse/Water Pre-treatment System Complete * **** Fire Protection System Complete * **** Administrative Building Complete * **** Paving (Expansion Plant Roads) Complete * **** Rail Spur Complete * **** Employees Hired and Ready for Training * **** Natural Gas Pipeline Complete * **** Platte Valley Fuel Ethanol, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & suppliesLLC April 24, etc. Safety showers as required Rolling stock Used 1½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile 2006 EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th 24th day of MarchApril, 2006 (“Effective Date”) by and between Advanced BioEnergyPlatte Valley Fuel Ethanol, LLC, a Delaware Limited Liability Company Nebraska limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: License Agreement (US BioEnergy CORP)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Cardinal Ethanol, LLC December 14, 2006 Table 1 Minimum Soil Bearing Pressure — Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Description Pressure (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 5,000 Xxxx 6,000 Corn/DDGS Building 4,000 Cxxx Water Tank 4,500 3,500 Methanator Feed Tank 4,500 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 3,500 Thin Stillage Tank 4,500 3,500 Syrup Tank 4,500 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 All Other Areas 3,000 Cardinal Ethanol, LLC December 14, 2006 C-5 Table 2 Maintenance and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 1/2 yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile Cardinal Ethanol, LLC December 14, 2006 Table 3 Owner’s Milestones Number Of Days To Be Completed After Notice To Owner’s Responsibilities Proceed Temporary Electrical Service In Place 0 Obtain Builder’s Risk policy in the amount of the Contract Price, obtain Boiler and Machinery Insurance, and obtain Terrorism Coverage per TRIA as long as it is required under Article 17 of the Agreement 0 Storm Water Permits Complete: Modify the existing storm water discharge permit to reflect the ethanol plant, if required 60 Natural Gas/Propane Transportation / Storage Agreement Complete 90 Water Supply and Service Agreements Complete 90 Electrical Service Arrangement 90 Wastewater Discharge System Complete 180 TTB Operating Permits Complete 200 Discharge Permits Complete 200 Pumphouse/Water System Complete 305 Fire Protection System Complete 305 Paving (Plant Roads) Complete 90 days prior to SC Rail Spur Complete 90 days prior to SC Permanent Electrical Service Complete 60 days prior to SC Maintenance and Power Equipment Onsite (Table 2) 60 days prior to SC Employees Hired and Ready for Training 60 days prior to SC Natural Gas Pipeline/Delivery System Complete 60 days prior to SC Cardinal Ethanol, LLC December 14, 2006 EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th 14th day of MarchDecember, 2006 (“Effective Date”) by and between Advanced BioEnergyCardinal Ethanol, LLC, a Delaware Limited Liability Company an Indiana limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: License Agreement (Cardinal Ethanol LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements separate contracts as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement separate contract between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure (pounds per square foot) Grain Storage Silos 7,000 8,000 DDGS Storage Silos 5,000 8,000 Xxxx Water Tank 4,500 3,500 Methanator Feed Tank 4,500 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 3,500 Thin Stillage Tank 4,500 3,500 Syrup Tank 4,500 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 4,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 4,000 All Other Areas 3,000 Table 2 Maintenance and Power Equipment Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 ½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile Table 3 Owner’s Milestones Owner’s Responsibilities Number of Days to be Completed after Notice to Proceed Notice to Proceed 0 Obtain Builder’s Risk policy in the amount of the Contract Price, obtain Boiler and Machinery Insurance, and obtain Terrorism Coverage per TRIA as long as it is required under Article 17 of the Agreement. 10 Storm Water Permits Complete: Modify the existing storm water discharge permit to reflect the ethanol plant, if required. 60 Natural Gas/Propane Transportation / Storage Agreement Complete 90 Water Supply and Service Agreements Complete 90 Electrical Service Arrangement 90 Wastewater Discharge System Complete 180 TTB Operating Permits Complete 200 Discharge Permits Complete 200 Pumphouse/Water System Complete 305 Fire Protection System Complete 305 Paving (Plant Roads) Complete 90 days prior to SC Rail Spur Complete 90 days prior to SC Employees Hired and Ready for Training 60 days prior to SC Natural Gas Pipeline Complete 60 days prior to SC EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th 5th day of MarchMay, 2006 (“Effective Date”) by and between Advanced BioEnergyMillennium Ethanol, LLC, a Delaware Limited Liability Company South Dakota limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: License Agreement (Millennium Ethanol, LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Expansion Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure — Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 5,000 Xxxx Water Slurry Tank 4,500 Methanator Feed Tank 4,500 4,000 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 Thin Stillage Tank 4,500 Syrup Tank 4,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 All Other Areas 3,000 Table 2 Maintenance Owner’s Milestones Owner’s Responsibilities Notice to Proceed Number Of Days To Be Completed After Notice To Proceed Notice to Proceed 0 Storm Water Permits Complete 60 Natural Gas/Propane Supply Agreements Complete 90 Water Supply and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies Service Agreements Complete 90 Risk Insurance Provider Selected/Fire Protection Requirements Known 90 NPDES Discharge Point Selected 90 Electrical Service 90 Water Pre-Treatment System Design Complete 170 Wastewater Discharge System Complete 180 Operating Permits Complete 200 Discharge Permits Complete 200 Pumphouse/Water Pre-treatment System Complete 305 Fire Protection System Complete 305 Administrative Building Complete 90 days prior to SC Paving (Expansion Plant Roads) Complete 90 days prior to SC Rail Spur Complete 90 days prior to SC Employees Hired and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile Ready for Training 60 days prior to SC Natural Gas Pipeline Complete 60 days prior to SC EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th day of MarchSeptember 20, 2006 (“Effective Date”) by and between Advanced BioEnergyLittle Sioux Corn Processors, LLCLP, a Delaware Limited Liability Company an Iowa limited partnership (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: License Agreement (Little Sioux Corn Processors LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure (pounds per square foot) Grain Storage Silos 7,000 8,000 DDGS Storage Silos 5,000 8,000 Corn/DDGS Building 4,000 Xxxx Water Tank 4,500 3,500 Methanator Feed Tank 4,500 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 3,500 Thin Stillage Tank 4,500 3,500 Syrup Tank 4,500 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 4,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 4,000 All Other Areas 3,000 Table 2 Maintenance and Power Equipment Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Partsbins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 ½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile Table 3 Owner’s Milestones Owner’s Responsibilities Number Of Days To Be Completed After Notice To Proceed Temporary Electrical Service In Place 0 Obtain Builder’s Risk policy in the amount of the Contract Price, obtain Boiler and Machinery Insurance, and obtain Terrorism Coverage per TRIA as long as it is required under Article 17 of the Agreement. 0 Storm Water Permits Complete: Modify the existing storm water discharge permit to reflect the ethanol plant, if required. 60 Natural Gas/Propane Transportation / Storage Agreement Complete 90 Water Supply and Service Agreements Complete 90 Electrical Service Arrangement 90 Wastewater Discharge System Complete 180 TTB Operating Permits Complete 200 Discharge Permits Complete 200 Pumphouse/Water System Complete 305 Fire Protection System Complete 305 Paving (Plant Roads) Complete 90 days prior to SC Rail Spur Complete 90 days prior to SC Permanent Electrical Service Complete 60 days prior to SC Maintenance and Power Equipment Onsite (Table 2) 60 days prior to SC Employees Hired and Ready for Training 60 days prior to SC Natural Gas Pipeline/Delivery System Complete 60 days prior to SC EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th 28th day of MarchSeptember, 2006 (“Effective Date”) by and between Advanced BioEnergyHighwater Ethanol, LLC, a Delaware Limited Liability Company Minnesota limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: License Agreement (Highwater Ethanol LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. E ENERGY AXXXX, LLC August 1, 2006 Table 1 Minimum Soil Bearing Pressure — Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Description Pressure (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 5,000 Xxxx 8,000 Cxxx Water Tank 4,500 3,500 Methanator Feed Tank 4,500 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 3,500 Thin Stillage Tank 4,500 3,500 Syrup Tank 4,500 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 4,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 4,000 All Other Areas 3,000 E ENERGY AXXXX, LLC August 1, 2006 C-5 Table 2 Maintenance and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 1/2 yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile E ENERGY AXXXX, LLC August 1, 2006 Table 3 Owner’s Milestones Number Of Days To Be Completed After Notice To Owner’s Responsibilities Proceed Temporary Electrical Service In Place 0 Obtain Builder’s Risk policy in the amount of the Contract Price, obtain Boiler and Machinery Insurance, and obtain Terrorism Coverage per TRIA as long as it is required under Article 17 of the Agreement. 0 Storm Water Permits Complete: Modify the existing storm water discharge permit to reflect the ethanol plant, if required. 60 Natural Gas/Propane Transportation / Storage Agreement Complete 90 Water Supply and Service Agreements Complete 90 Electrical Service Arrangement 90 Wastewater Discharge System Complete 180 TTB Operating Permits Complete 200 Discharge Permits Complete 200 Pumphouse/Water System Complete 305 Fire Protection System Complete 305 Paving (Plant Roads) Complete 90 days prior to SC Rail Spur Complete 90 days prior to SC Permanent Electrical Service Complete 60 days prior to SC Maintenance and Power Equipment Onsite (Table 2) 60 days prior to SC Employees Hired and Ready for Training 60 days prior to SC Natural Gas Pipeline/Delivery System Complete 60 days prior to SC E ENERGY AXXXX, LLC August 1, 2006 EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th 1st day of MarchAugust, 2006 (“Effective Date”) by and between Advanced BioEnergyE Energy Axxxx, LLC, a Delaware Limited Liability Company Nebraska limited liability company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: License Agreement (E Energy Adams LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Expansion Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 5,000 Xxxx Water Slurry Tank 4,500 Methanator Feed 4,000 Liquifaction Tank 4,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 Thin Stillage Tank 4,500 Syrup Tank 4,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 All Other Areas 3,000 Table 2 Maintenance Owner’s Milestones Owner’s Responsibilities Number Of Days To Be Completed After Notice To Proceed Notice to Proceed 0 Storm Water Permits Complete 60 Natural Gas/Propane Supply Agreements Complete 90 Water Supply and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies Service Agreements Complete 90 Risk Insurance Provider Selected/Fire Protection Requirements Known 90 NPDES Discharge Point Selected 90 Electrical Service 90 Water Pre-Treatment System Design Complete 170 Wastewater Discharge System Complete 180 Operating Permits Complete 200 Discharge Permits Complete 200 Pumphouse/Water Pre-treatment System Complete 305 Fire Protection System Complete 305 Administrative Building Complete 90 days prior to SC Paving (Expansion Plant Roads) Complete 90 days prior to SC Rail Spur Complete 90 days prior to SC Employees Hired and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile Ready for Training 60 days prior to SC Natural Gas Pipeline Complete 60 days prior to SC EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT EXHIBIT E Schedule of Values E-1 EXHIBIT F Form of Informational Report PROJECT MEETING: Two-Week Look Ahead(s) JOBSITE: MEETING DATE: q MANPOWER TOTALS q Xxxxx, Inc. 0 (this “License Agreement”sub) is entered into and made effective as of the 13th day of March, 2006 (“Effective Date”) by and between Advanced BioEnergy, LLC, a Delaware Limited Liability Company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).0 0 0 0 0 0 0 0 0 JOBSITE TOTAL 0 q SAFETY ISSUES

Appears in 1 contract

Samples: Build Expansion Agreement (Golden Grain Energy)

AutoNDA by SimpleDocs

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. Table 1 Minimum Soil Bearing Pressure — Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Pressure (pounds per square foot) Grain Storage Silos 7,000 8,000 DDGS Storage Silos 5,000 8,000 Corn/DDGS Building 4,000 Xxxx Water Tank 4,500 3,500 Methanator Feed Tank 4,500 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 3,500 Thin Stillage Tank 4,500 3,500 Syrup Tank 4,500 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 4,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 4,000 All Other Areas 3,000 Table 2 Maintenance and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 ½ yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th day of March, 2006 (“Effective Date”) by and between Advanced BioEnergy, LLC, a Delaware Limited Liability Company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).Mobile

Appears in 1 contract

Samples: License Agreement (Highwater Ethanol LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. [Name of Project Company] _____ ___, 2006 Table 1 Minimum Soil Bearing Pressure Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Description Pressure (pounds per square foot) Grain Storage Silos 7,000 8,000 DDGS Storage Silos 5,000 Xxxx 8,000 Corn/DDGS Building 4,000 Cxxx Water Tank 4,500 3,500 Methanator Feed Tank 4,500 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 3,500 Thin Stillage Tank 4,500 3,500 Syrup Tank 4,500 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 4,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 4,000 All Other Areas 3,000 [Name of Project Company] _____ ___, 2006 C-5 Table 2 Maintenance and Power Equipment Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 1/2 yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile [Name of Project Company] _____ ___, 2006 C-6 Table 3 Owner’s Milestones Number Of Days To Be Completed After Notice To Owner’s Responsibilities Proceed Temporary Electrical Service In Place 0 Obtain Builder’s Risk policy in the amount of the Contract Price, obtain Boiler and Machinery Insurance, and obtain Terrorism Coverage per TRIA as long as it is required under Article 17 of the Agreement. 0 Storm Water Permits Complete: Modify the existing storm water discharge permit to reflect the ethanol plant, if required. 60 Natural Gas/Propane Transportation / Storage Agreement Complete 90 Water Supply and Service Agreements Complete 90 Electrical Service Arrangement 90 Wastewater Discharge System Complete 180 TTB Operating Permits Complete 200 Discharge Permits Complete 200 Pumphouse/Water System Complete 305 Fire Protection System Complete 305 Paving (Plant Roads) Complete 90 days prior to SC Rail Spur Complete 90 days prior to SC Permanent Electrical Service Complete 60 days prior to SC Maintenance and Power Equipment Onsite (Table 2) 60 days prior to SC Employees Hired and Ready for Training 60 days prior to SC Natural Gas Pipeline/Delivery System Complete 60 days prior to SC [Name of Project Company] _____ ___, 2006 EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th ___ day of March, 2006 (“Effective Date”) by and between Advanced BioEnergy, LLC, a Delaware Limited Liability Company corporation (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: Master Agreement (US BioEnergy CORP)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. ADVANCED BIOENERGY, LLC March 16, 2006 Table 1 Minimum Soil Bearing Pressure Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Description Pressure (pounds per square foot) Grain Storage Silos 7,000 DDGS Storage Silos 5,000 Xxxx Cxxx Water Tank 4,500 Methanator Feed Tank 4,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 Thin Stillage Tank 4,500 Syrup Tank 4,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 All Other Areas 3,000 ADVANCED BIOENERGY, LLC March 16, 2006 Table 2 Maintenance and Power Equipment — Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 1/2 yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile ADVANCED BIOENERGY, LLC March 16, 2006 EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th day of March, 2006 (“Effective Date”) by and between Advanced BioEnergy, LLC, a Delaware Limited Liability Company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).

Appears in 1 contract

Samples: License Agreement (Advanced BioEnergy, LLC)

Fire Protection System. Fire Protection System requirements vary by governmental requirements per location and by insurance carrier requirements. Owner is responsible to provide the required fire protection system for the Plant. This may include storage tanks, pumps, underground fire water mains, fire hydrants, foam or water monitor valves, sprinkler systems, smoke and heat detection, deluge systems, or other provisions as required by governmental codes or Owner’s insurance carrier’s fire protection criteria. Owner shall pay for a Fire Protection System to be designed and constructed by Design-Builder and to be integrated into the Plant. The Fire Protection System shall be designed and constructed to meet the governmental and insurance requirements. Owner is to execute side-letter agreements as necessary for the design and construction of such Fire Protection System. Design-Builder shall recover costs for the design and construction of such system from Owner at Design-Builder’s standard time plus material rates during the relevant time period and at the relevant locale. A side-letter agreement between Owner and Design-Builder shall be executed by Owner and Design-Builder to compensate Design-Builder, at Design-Builder’s standard time plus materials rates during the relevant time period and at the relevant locale, for any costs and expenses related to such Fire Protection System. First United Ethanol, LLC November 16, 2006 Table 1 Minimum Soil Bearing Pressure Responsibility of Owner ** Subject to revision based on detailed design and engineering. Description Required Allowable Soil Bearing Description Pressure (pounds per square foot) Grain Storage Silos 7,000 8,000 DDGS Storage Silos 5,000 Xxxx 8,000 Corn/DDGS Building 4,000 Cxxx Water Tank 4,500 3,500 Methanator Feed Tank 4,500 3,500 Liquefaction Tank #1 3,500 Liquefaction Tank #2 3,500 Fermentation Tank #1 5,000 Fermentation Tank #2 5,000 Fermentation Tank #3 5,000 Fermentation Tank #4 5,000 Fermentation Tank #5 5,000 Fermentation Tank #6 5,000 Fermentation Tank #7 5,000 Beerwell 5,000 Whole Stillage Tank 4,500 3,500 Thin Stillage Tank 4,500 3,500 Syrup Tank 4,500 3,500 190 Proof Day Tank 3,000 200 Proof Day Tank 3,000 Denaturant Tank 3,000 Fire Water Tank 3,000 Denatured Ethanol Tank #1 3,000 4,000 Denatured Ethanol Tank #2 3,000 Distillation Mat Foundation 4,500 4,000 All Other Areas 3,000 First United Ethanol, LLC November 16, 2006 C-5 Table 2 Maintenance and Power Equipment Responsibility of Owner Description Additional Description Spare Parts Spare parts Parts bins Misc. materials, supplies and equipment Shop supplies and equipment One shop welder One portable gas welder One plasma torch One acetylene torch One set of power tools Two sets of hand tools with tool boxes Carts and dollies Hoists (except centrifuge overhead crane) Shop tables Maintenance office furnishings & supplies Fire Extinguishers Reference books Safety manuals Safety cabinets & supplies, etc. Safety showers as required Rolling stock Used 1 1/2 yard front end loader New Skid loader Used Fork lift Used Scissors lift, 30 foot Used Pickup truck Track Mobile EXHIBIT D ICM License Agreement THIS LICENSE AGREEMENT (this “License Agreement”) is entered into and made effective as of the 13th day of MarchFirst United Ethanol, 2006 (“Effective Date”) by and between Advanced BioEnergyLLC November 16, LLC, a Delaware Limited Liability Company (“OWNER”), and ICM, Inc., a Kansas corporation (“ICM”).2006

Appears in 1 contract

Samples: License Agreement (First United Ethanol LLC)

Time is Money Join Law Insider Premium to draft better contracts faster.