Field Measurements Sample Clauses

Field Measurements. Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor with the Contract Documents before commencing activities. Errors, inconsistencies or omissions discovered shall be reported to Department in writing prior to the performance of the work. Once work is started, Contractor assumes the responsibility and costs for the work and the cost of correcting work previously installed.
AutoNDA by SimpleDocs
Field Measurements. Contractor shall make the layout of lines and elevations and shall be responsible for the accuracy of both the Contractor’s and the Subcontractors’ work resulting therefrom. All dimensions affecting proper fabrication and installation of all Contract work must be verified by the Contractor prior to fabrication and installation by taking field measurements of the true conditions. The Contractor shall take, and assist Subcontractors in taking, all field dimensions required in performance of the work, and shall verify all dimensions and conditions on the Site. If there are any discrepancies between dimensions in Drawings (or Plans) and existing conditions which will affect the work, the Contractor shall promptly bring such discrepancies to the attention of the Architect for adjustment before proceeding with the work. Contractor shall be responsible for the proper fitting of all work and for the coordination of all trades, Subcontractors and persons engaged upon this Contract.
Field Measurements. Contractor shall take field measurements and verify field conditions and shall carefully compare such field measurements and conditions and other information known to Contractor. Once work is started, Contractor assumes the responsibility and costs for the work and the cost of correcting work previously installed.
Field Measurements. A. Take field measurements at the site to verify or supplement indicated dimensions and to ensure proper coordination of all other construction items.
Field Measurements. 03 Review of existing design data .04 Analysis of existing structural capabilities .05 Analysis of existing mechanical capabilities .06 Analysis of existing electrical capabilities.
Field Measurements. It is the responsibility of the Subcontractor to take field measurements to ensure the proper matching and fitting of its Work with existing conditions and the work of others and to point out any dimensioning errors on the Construction Documents before that relevant portion of the Work is commenced.
Field Measurements. A. Although care has been taken to ensure their accuracy, the dimensions shown for existing items and structures are not guaranteed. It is the responsibility of the General Contractor to verify these dimensions in the field before fabricating any construction component. No claims for extra payment due to incorrect dimensions will be considered by the Town of Wellesley.
AutoNDA by SimpleDocs
Field Measurements. Water quality and sediment Bulk samples of stream water will be collected from the Xxxxx Toledo analyzed for dissolved oxygen, conductivity, pH, hardness and alkalinity. Sediments will be collected twice each year from pools (greater than 1.0 m in depth) throughout sample reaches on the Xxxxx Toledo using a mini-Xxxxxx sediment sampler. The samples from within each pool will be composited and separated into coarse (2.0 – 4.0 mm) to fine (0.25 – 0.5 mm) particulates using U.S. Standard stainless steel sieves (Xxxxx and Xxxxxxxx 1996). From the smallest particle size fractions, carbon and nitrogen ratios (C:N) will be obtained by high temperature combustion and gas chromatography (Pella 1990; Xxx-Xxx and Xxxxx 1989). Field Measurements - benthic invertebrates and fish populations Benthic Macroinvertebrates Quantitative replicated samples for macroinvertebrate density, species richness, diversity and evenness, will be collected using a modified Xxxx type circular sampler (mesh size = 250 microns). Sample collections will occur during the spring and fall across nine study reaches (see Table 1). A total of nine study reaches are planned in which pre-burn data are available from prior studies. These will co-occur within the same study reach as the fish collections and will be subjectively selected by habitat type (i.e., xxxxxx) for macroinvertebrate colonization. Briefly stated, three replicate samples (n=3, except Indios Creek where n=4, due to the additional “Cabin” site) will be collected using the quantitative Xxxx sampler to estimate macroinvertebrate density and diversity from riffles within each study reach during each fall and spring collection. An earlier study revealed samples from run and pool habitats were highly variable and did not add sufficient taxonomic information to the analyses; thus, only xxxxxx areas will be sampled for macroinvertebrate metrics. A total of 54 invertebrate samples (9 study reaches x 3 samples/study reach x 2 seasons/year = 54 samples/year + Indios Cabin site (2 samples/yr) = total of 56 samples/year) will be collected and stored in 85% ethyl alcohol until processing. All macroinvertebrates will be removed from debris for identification and enumeration to the lowest possible taxon using taxonomic keys (Pennak 1978; Xxxxxx and Cummins 1996) and reference collections obtained throughout XXXX 0000-0000.
Field Measurements. A. Verify that field measurements are as shown on Shop Drawings.
Field Measurements. A. Verify that field measurements are after construction of facilities and are included in shop drawing submittal. Field verification of dimensions is a prerequisite for fabrication of railing and any misfitting of railing will be the responsibility of the Contractor to rectify until railing complies with the Specifications.