Exposed Surfaces Sample Clauses

Exposed Surfaces. All exposed surfaces of any display that face another Exhibitor’s space must be finished in a tasteful manner so as it will not distract from the other Exhibitor’s display. It is the responsibility of each Exhibitor to finish their own surfaces. Exhibitor’s exposed surfaces will be covered with non-advertising text or graphics.
AutoNDA by SimpleDocs

Related to Exposed Surfaces

  • Contamination The presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.

  • Dangerous Materials Tenant shall not keep or have on the Premises any article or thing of a dangerous, flammable, or explosive character that might substantially increase the danger of fire on the Premises, or that might be considered hazardous by a responsible insurance company, unless the prior written consent of Landlord is obtained and proof of adequate insurance protection is provided by Tenant to Landlord.

  • 342 Hazardous Substances Purchaser shall notify the National Response Center and Contracting Officer of all releases of reportable quantities of hazardous substances on or in the vicinity of Sale Area that are caused by Purchaser’s employees, agents, contractors, Subcontractors, or their employees or agents, directly or indirectly, as a result of Purchaser’s Operations, in accordance with 40 CFR 302.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • Hazardous Substances The words "Hazardous Substances" mean materials that, because of their quantity, concentration or physical, chemical or infectious characteristics, may cause or pose a present or potential hazard to human health or the environment when improperly used, treated, stored, disposed of, generated, manufactured, transported or otherwise handled. The words "Hazardous Substances" are used in their very broadest sense and include without limitation any and all hazardous or toxic substances, materials or waste as defined by or listed under the Environmental Laws. The term "Hazardous Substances" also includes, without limitation, petroleum and petroleum by-products or any fraction thereof and asbestos.

  • Animals The Hirer shall ensure that no animals (including birds) except guide dogs are brought into the premises, other than for a special event agreed to by the Village Hall. No animals whatsoever are to enter the kitchen at any time.

  • No Hazardous Materials (A) have been disposed of or otherwise released from any Real Property of the Company or any of its Subsidiaries in violation of any Environmental Laws; or

  • Environmental Hazards (a) Except for matters described in Section 18(b), Borrower shall not cause or permit any of the following:

  • Porcupine Site Highway 11

  • Trees 1) Any major tree surgery or tree removal over a three (3) inch diameter, which becomes necessary through no fault of the Contractor, will be at the County's expense.

Time is Money Join Law Insider Premium to draft better contracts faster.