Excess Auxiliary Power Unit. (APU) Burn Monthly Penalty: (Average Actual APU hrs per Cycle-Target) x Total Cycle x *** x Fuel cost per gallon Assumptions: · APU burn rate = *** per CRJ900 Aircraft (w/Air and electric load) · APU runs almost exclusively w/air load but not necessarily electric · Cycles based on all Operator operations (scheduled and unscheduled) · Fuel cost per gallon = actual price per gallon incurred by Delta per Section 1.04 of this Exhibit A including into-plane fees and taxes.
AutoNDA by SimpleDocs
Excess Auxiliary Power Unit. (APU) Burn Monthly Penalty: (Average Actual APU hrs per flight hour-Target) x Flt to Blk Hour Ratio x Total Block Hours x *** x Fuel cost per gallon Plus Margin applicable to the fuel expense reimbursement pursuant to Section 5.08 or 5.11. Assumptions: · APU burn rate = *** per Bombardier (w/Air and electric load) · APU runs almost exclusively w/air load but not necessarily electric. Reduction in rate w/electric removed insignificant per 9E · Flight hours and Block hours based on all 9E operations (scheduled and unscheduled) · Fuel cost per gallon = actual price per gallon incurred by Delta per Section 5.05(a)(ii) including into-plane fees and taxes.

Related to Excess Auxiliary Power Unit

  • Interconnection Facility Options The Intercarrier Compensation provisions of this Agreement shall apply to the exchange of Exchange Service (EAS/Local) traffic between CLEC's network and Qwest's network. Where either Party acts as an IntraLATA Toll provider, each Party shall xxxx the other the appropriate charges pursuant to its respective tariff or price lists. Where either Party interconnects and delivers traffic to the other from third parties, each Party shall xxxx such third parties the appropriate charges pursuant to its respective tariffs, price lists or contractual offerings for such third party terminations. Absent a separately negotiated agreement to the contrary, the Parties will directly exchange traffic between their respective networks without the use of third party transit providers.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Non-Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established a different power factor range that applies to all similarly situated non-synchronous generators in the control area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard shall be dynamic and can be met using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two. This requirement shall only apply to newly interconnecting non-synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Switching and Tagging Rules Each Party shall provide the other Parties a copy of its switching and tagging rules that are applicable to the other Parties’ activities. Such switching and tagging rules shall be developed on a non-discriminatory basis. The Parties shall comply with applicable switching and tagging rules, as amended from time to time, in obtaining clearances for work or for switching operations on equipment.

  • ADJUSTMENT OF THE DISTRIBUTOR’S ALLOCABLE PORTION AND EACH SUCCESSOR DISTRIBUTOR’S ALLOCABLE PORTION The parties to the Distribution Agreement recognize that, if the terms of any distributor’s contract, any distribution plan, any prospectus, the FINRA Conduct Rules or any other applicable law change so as to disproportionately reduce, in a manner inconsistent with the intent of this Distribution Agreement, the amount of the Distributor’s Allocable Portion or any Successor Distributor’s Allocable Portion had no such change occurred, the definitions of the Distributor’s Allocable Portion and/or the Successor Distributor’s Allocable Portion in respect of the Class C shares relating to a Fund shall be adjusted by agreement among the relevant parties; provided, however, if the Distributor, the Successor Distributor and the Fund cannot agree within thirty (30) days after the date of any such change in applicable laws or in any distributor’s contract, distribution plan, prospectus or the FINRA Conduct Rules, they shall submit the question to arbitration in accordance with the commercial arbitration rules of the American Arbitration Association and the decision reached by the arbitrator shall be final and binding on each of them. SCHEDULE B to the Amended and Restated Principal Underwriting Agreement ALLOCATION SCHEDULE The following relates solely to Class 529-C shares. The Distributor’s Allocable Portion of Distribution Fees and CDSCs in respect of Class 529-C shares shall be 100% until such time as the Distributor shall cease to serve as exclusive distributor of Class 529-C shares; thereafter, collections that constitute CDSCs and Distribution Fees relating to Class 529-C shares shall be allocated among the Distributor and any successor distributor (“Successor Distributor”) in accordance with this Schedule. At such time as the Distributor’s Allocable Portion of the Distribution Fees equals zero, the Successor Distributor shall become the Distributor for purposes of this Allocation Schedule. Defined terms used in this Schedule and not otherwise defined herein shall have the meanings assigned to them in the Principal Underwriting Agreement (the “Distribution Agreement”), of which this Schedule is a part. As used herein the following terms shall have the meanings indicated:

  • Capacity Interconnection Rights Pursuant to and subject to the applicable terms of the Tariff, the Interconnection Customer shall have Capacity Interconnection Rights at the Point(s) of Interconnection specified in this Interconnection Service Agreement in the amount of 550 MW.

  • Voice Grade Unbundled Copper Sub-Loop Unbundled Sub-Loop Distribution – Intrabuilding Network Cable (aka riser cable)

  • Rate Center Area The geographic area that has been identified by a given LEC as being associated with a particular NPA-NXX code assigned to the LEC for its provision of Telephone Exchange Services. The Rate Center Area is the exclusive geographic area that the LEC has identified as the area within which it will provide Telephone Exchange Services bearing the particular NPA-NXX designation associated with the specific Rate Center Area.