Estimated Fees Sample Clauses

Estimated Fees. The estimated fees for this agreement are $20,000.00. These fees are variable based on the fee schedule provided.
AutoNDA by SimpleDocs
Estimated Fees. Based on the scope of work and fee schedule outlined above, the total cost of our geotechnical services will be $9,350. Attached for your reference is an itemization of the anticipated costs associated with performing the proposed geotechnical services. Our schedule can be adjusted to meet project milestones if required. SCHEDULE Approximately one to two weeks from the time of authorization will be required to complete the field investigation. Laboratory testing and reporting will follow completion of the field activities by about two weeks. Attached are our Terms & Conditions, and these Terms & Conditions should be considered an integral part of our proposal. Please execute the attached Work Authorization Sheet and return a copy to us, as your signature will formally authorize us to proceed with the discussed scope of work and aid us in invoicing. We appreciate the opportunity to submit this cost estimate and look forward to the prospect of working with you. If you have any questions, please call. Sincerely, SOUTHERN EARTH SCIENCES, INC. Xxxx Xxxxxx, P.E. Geotechnical Dept. Manager Registered, Alabama 30835 MC Attachments SESI Geotechnical Services Proposal P17-024.01 CR-6 Improvements at SR-59 - reduced scope Gulf Shores, AL Service Unit Rate Quantity Units Price Comments Field Services Mobilization $ 500.00 1 ea $ 500.00 rig and crew mobilization Mileage - Rig Travel mile Mileage - Crew Travel mile SPT 0-50 feet $ 12.50 156 ft $ 1,950.00 SPT 50-75 feet SPT 75-100 feet SPT 100-150 feet ft ft ft 4 to 30 ft for signal poles 6 to 6 ft for widening SPT 150-200 feet ft Grouting Boreholes ft Extra SPT Tests $ 15.00 12 ea $ 180.00 Asphalt Cores $ 75.00 4 ea $ 300.00 4 asphalt cores w/ base meas Asphalt/Concrete Patch ea Manual Auger Borings xx Xxxxxx Tubes ea CPTu Soundings ft CPTs Seismic Soundings ft CPTu w/ Direct Push Samples ft Grouting CPT Soundings ea Double Ring Infiltration Tests ea Monitorting xxxxx for SHGW ea Subcontract Clearing day Subcontract Traffic Control $ 1,800.00 1 day $ 1,800.00 for asphalt cores Difficult Access/Tracking hr Site Specific Safety hr Subtotal $ 4,730.00 Laboratory Testing Moisture Content $ 5.00 12 ea $ 60.00 Atterberg Limits $ 75.00 8 ea $ 600.00 #200 Washes $ 30.00 12 ea $ 360.00 UU Triaxial ea Consolidation ea UD Sample Prep ea Unconfined Compression ea California Bearing Ratio ea Corrosivity ea Subtotal $ 1,020.00 Prof and Staff Services Field Engineer $ 100.00 8 hr $ 800.00 Staff Engineer $ 100.00 12 hr $ 1,200.00 Profe...
Estimated Fees. The services specified above are provided on a per project basis; that is, University shall pay Contractor based upon the type and scope of the services outlined in section 1.A above.
Estimated Fees. The method of calculating fees under this Task Order shall be (e.g. flat fee, hourly billing, blended rates, fixed rates per phase, etc.). The estimated fees for this Task Order is $TBD. DocuSign Envelope ID: 4C11A77B-6D08-4926-B073-BFAC814F211C
Estimated Fees. Based upon the 2017 California Department of Finance estimate of 271,579 Merced County residents, the Annual Fee for Participant is $30,863. Annual Fees and Implementation Fees for the term of this Agreement are estimated as follows: 2017 (4 months) 2018 2019 2020 2021 Total Implementation: $15,000 $0 $0 $0 $0 $15,000 Annual Fee: $10,288 $30,863 $30,863 $30,863 $30,863 $133,740 Total Fees: $25,288 $30,863 $30,863 $30,863 $30,863 $148,740
Estimated Fees. The method of calculating fees under this Task Order shall be (e.g. flat fee, hourly billing, blended rates, fixed rates per phase, etc.). The estimated fees for this Task Order is $TBD. DocuSign Envelope ID: 800C2088-71B0-4F17-94BD-2763A360D3C6 Maximum Fee Firm represents that all of the services for this Task Order can be provided for a fee, including expenses, not to exceed $ .00, which is funded by the attached service release order. City shall have no obligation to pay any sum greater than $ for the services described herein. MWBE Goal under this Task Order – TBD Accepted and Agreed to by: Deputy Director of the Office of Emergency Management Date: Accepted and Agreed to by: By: Name: Title: Date: DocuSign Envelope ID: 800C2088-71B0-4F17-94BD-2763A360D3C6 EXHIBIT “B-2” TASK ORDER INSTRUCTIONS Steps:
Estimated Fees. Please find our general estimate of the construction testing costs for this project. The testing costs are an estimate based on our experience with projects of similar size and scope, so the actual testing costs could vary from this estimate. We have necessarily made assumptions about the contractor’s approach to various construction items and the actual construction progress timeframes to develop the estimated trips to the site and corresponding fees. Our estimates outlined below can be considered a lump-sum, not-to-exceed price for the number of trips and testing that is outlined herein. Additional testing services beyond the scope of work indicated in this proposal would be performed only with the owner’s prior authorization to do so, and will be billed at our standard unit rates. Our standard unit rate fee schedule is attached for reference. Based on the time frames, personnel and assumptions provided above we have the following estimates. Task Estimated Cost Task 1 – Earthwork Testing $12,005.00 Task 2 – Special Inspection and Testing of Concrete Construction $20,852.50 Task 3 – Metal Deck Inspection $2,304.00 Task 4 – Floor Flatness/Floor Levelness $3,392.00 Task 5 – Grout Testing $4,032.00 Task 6 – Mortar Testing $4,032.00 Task 7 – Masonry Prisms $4,352.00 Task 8 – Structural Weld Inspection $6,240.00 Task 9 – Asphalt Testing $1,696.00 Task 10Construction Period Geotechnical Engineering $1,231.00 Estimated Total $60,136.50 We understand the County is tax exempt and no tax is included in our fee estimate. All reimbursable items such as miles, concrete test molds and other consumable items used in our work are included in our cost estimate. No additional fees or charges will be billed. If you have any questions, or desire any additional information, please call us at your earliest convenience. Thank you for the opportunity to be of service. Sincerely, Xxxx Xxxxxxxx FMG ENGINEERING 2022 RATE SCHEDULE PERSONNEL RATE Principal Engineer II $198.00/hr Principal Engineer I $170.00/hr Senior Engineer $150.00/hr Engineer III – PE $130.00/hr Engineer II – PE $120.00/hr Engineer I – PE $115.00/hr Geospatial Analyst $110.00/hr Graduate Engineer II – EIT $105.00/hr Graduate Engineer I – EIT $95.00/hr CADD Technician II $100.00/hr CADD Technician I $90.00/hr Geologist - PG $95.00/hr Environmental Scientist $90.00/hr Land Surveyor - RLS $110.00/hr Land Surveyor – LSIT $95.00/hr Survey Technician II $90.00/hr Survey Technician I $80.00/hr Engineering Technician I...
AutoNDA by SimpleDocs
Estimated Fees. (a) Except as defined in this Exhibit E, Subsection 1, Client shall pay Fiserv fees and other charges for each Development Project as specified in each Exhibit E — n (“Development Fees”). * Any estimates of Development Fees and completion dates are referenced solely for the purpose of allowing Client to plan its budgets and schedules based upon the then available information. The daily rates quoted in the table will be valid for 3 months from the effective date of a Development Project. Fiserv will adhere to its Professional Services rates as defined. Fiserv agrees not to increase fees for any individual promoted or reassigned during a project.
Estimated Fees. A summary of the proposed fee for the scope of work based on the scope of services detailed in this letter is shown below. Task 1 - Kick-off Meeting $1,224 Task 2 - Data Collection and Review of Available Documents $8,576 Task 3 - Geotechnical Analysis $8,792 Task 4 - Final Design and Construction Documents $51,716 Task 5 - Permits and Regulatory Approvals $5,000 Task 6 - Periodic On-site Visits $19,230 SEH would be pleased to provide bidding assistance and construction services. If these services are desired, we will work with the city to provide a scope and fee. Payment: The fee is hourly and estimated to be $94,538 including expenses and equipment. The payment method, basis, frequency and other special conditions are set forth in attached Exhibit A-1. This Agreement for Professional Services, attached General Conditions, Exhibits and any Attachments (collectively referred to as the “Agreement”) supersedes all prior contemporaneous oral or written agreements and represents the entire understanding between Client and Consultant with respect to the services to be provided by Consultant hereunder. In the event of a conflict between the documents, this document and the attached General Conditions shall take precedence over all other Exhibits unless noted below under “Other Terms and Conditions”. The Agreement for Professional Services and the General Conditions (including scope, schedule, fee and signatures) shall take precedence over attached Exhibits. This Agreement may not be amended except by written agreement signed by the authorized representatives of each party. Other Terms and Conditions: Other or additional terms contrary to the General Conditions that apply solely to this project as specifically agreed to by signature of the Parties and set forth herein: None.
Estimated Fees. (a) Client shall pay Fiserv fees and other charges for each Development Project as specified in each Exhibit E–n (“Development Fees”). * . The minimum number of days will be clearly indicated on the estimate.