Common use of Estimated Cost Clause in Contracts

Estimated Cost. For the scope of services outlined within this proposal, we estimate a total cost of about $16,967.00. The breakdown of the estimated cost is as follows: P a g e 3 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 2021 Item Estimated Quantity Unit Unit Price Estimated Cost Field Activities: Mobe/demobe of drill rig 1 Lump Sum $ 300.00 Drilling/sampling of 8 borings to 20 feet 160 feet $ 18.00 $ 2,880.00 Locate/identify/xxxx borings by graduate engineer 2 hours $ 85.00 $ 170.00 Coring of existing pavement 8 each $ 80.00 $ 640.00 Field logging/supervising coring/drilling by field technician 16 hours $ 65.00 $ 1,040.00 Limited traffic control (cones, signs, technician as flagman during coring and drilling) 1 Lump Sum $ 800.00 Grouting of roadway boreholes after drilling 160 feet $ 8.00 $ 1,280.00 Vehicle Charge 18 hours $ 7.50 $ 135.00 Sub-Total $ 7,245.00 Laboratory Testing: Atterberg Limits (ASTM D4318) 28 each $ 60.00 $ 1,680.00 % Pass No. 200 Sieve (ASTM D1140) 28 each $ 46.00 $ 1,288.00 Moisture Content (ASTM D2216) 64 each $ 9.00 $ 576.00 Unconfined Compression (ASTM D2166) 12 each $ 44.00 $ 528.00 Standard Xxxxxxx Test (ASTM D698) 1 each $ 175.00 $ 175.00 California Bearing Ratio, 3-Point (ASTM D1883) 3 each $ 185.00 $ 555.00 Sub-Total $ 4,802.00 Engineering, coordination, supervision, analysis, and report preparation*: Senior engineer, P.E. 10 hours $ 150.00 $ 1,500.00 Graduate engineer/EIT 36 hours $ 85.00 $ 3,060.00 Clerical/Drafting Support 6 hours $ 60.00 $ 360.00 Sub-Total $ 4,920.00 TOTAL FOR THE GEOTECHNICAL INVESTIGATION $ 16,967.00 * includes desktop review of surface faults within the project area. P a g e 4 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 2021

Appears in 2 contracts

Samples: agendalink.co.fort-bend.tx.us:8085, agendalink.co.fort-bend.tx.us:8085

AutoNDA by SimpleDocs

Estimated Cost. For the scope of services outlined within this proposal, we estimate a total cost of about $16,967.0026,608.50. The breakdown of the estimated cost is as follows: P a g e 3 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 2021 Item Estimated Quantity Unit Unit Price Estimated Cost Field Activities: Visual pavement evaluation by senior engineer 4 hours $ 150.00 $ 600.00 Mobe/demobe of drill rig 1 Lump Sum $ 300.00 Drilling/sampling of 8 11 borings to 20 feet 160 (2 at 100’ and 9 at 10’) 290 feet $ 18.00 $ 2,880.00 5,220.00 Locate/identify/xxxx mark borings by graduate engineer 2 3 hours $ 85.00 $ 170.00 255.00 Coring of existing pavement 8 11 each $ 80.00 $ 640.00 880.00 Field logging/supervising coring/drilling logging by field qualified technician 16 32 hours $ 65.00 $ 1,040.00 2,080.00 Limited traffic control (cones, signs, technician as flagman during coring and drillingdrilling along the roadway) 1 Lump Sum $ 800.00 1,600.00 Grouting of roadway boreholes after drilling 160 290 feet $ 8.00 $ 1,280.00 2,320.00 Vehicle Charge 18 39 hours $ 7.50 $ 135.00 292.50 Sub-Total $ 7,245.00 13,547.50 Laboratory Testing: Atterberg Limits (ASTM D4318) 28 48 each $ 60.00 $ 1,680.00 2,880.00 % Pass No. 200 Sieve (ASTM D1140) 28 36 each $ 46.00 $ 1,288.00 1,656.00 Moisture Content (ASTM D2216) 64 90 each $ 9.00 $ 576.00 810.00 Unconfined Compression (ASTM D2166) 12 20 each $ 44.00 $ 528.00 880.00 Item Estimated Quantity Unit Unit Price Estimated Cost Standard Xxxxxxx Test (ASTM D698) 1 each $ 175.00 $ 175.00 California Bearing Ratio, 3-Point (ASTM D1883) 3 each $ 185.00 $ 555.00 Sub-Total $ 4,802.00 6,956.00 Engineering, coordination, supervision, analysis, and report preparation*: Senior engineer, P.E. 10 12 hours $ 150.00 $ 1,500.00 1,800.00 Graduate engineer/EIT 36 45 hours $ 85.00 $ 3,060.00 3,825.00 Clerical/Drafting Support 6 8 hours $ 60.00 $ 360.00 480.00 Sub-Total $ 4,920.00 6,105.00 TOTAL FOR THE GEOTECHNICAL INVESTIGATION $ 16,967.00 * includes desktop review of surface faults within the project area. P a g e 4 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 202126,608.50

Appears in 2 contracts

Samples: Agreement for Professional Engineering Services, Agreement

AutoNDA by SimpleDocs

Estimated Cost. For the scope of services outlined within this proposal, we estimate a total cost of about $16,967.0039,736.00. The breakdown of the estimated cost is as follows: P a g e 3 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 2021 Item Estimated Quantity Unit Unit Price Estimated Cost Field Activities: Initial site visit by Senior engineer, P.E. 4 hours $ 150.00 $ 600.00 Mobe/demobe of drill rig 1 Lump Sum $ 300.00 Coring of existing pavement at 2 locations 2 each $ 80.00 $ 160.00 Drilling/sampling of 8 37 borings to 20 15 feet 160 555 feet $ 18.00 $ 2,880.00 9,990.00 Locate/identify/xxxx mark borings by graduate engineer 2 6 hours $ 85.00 $ 170.00 Coring 510.00 Field logging of existing pavement 8 each $ 80.00 $ 640.00 Field logging/supervising coring/drilling soil samples by field qualified technician 16 48 hours $ 65.00 $ 1,040.00 3,120.00 Limited traffic control (cones, signs, technician as flagman during coring drilling along Dallas Street and drillingCalifornia Street) 1 Lump Sum $ 800.00 600.00 Grouting of roadway 2 boreholes after drilling 160 30 feet $ 8.00 9.00 $ 1,280.00 270.00 Vehicle Charge 18 60 hours $ 7.50 $ 135.00 450.00 Sub-Total $ 7,245.00 16,000.00 Laboratory Testing: Atterberg Limits (ASTM D4318) 28 80 each $ 60.00 $ 1,680.00 4,800.00 % Pass No. 200 Sieve (ASTM D1140) 28 48 each $ 46.00 $ 1,288.00 2,208.00 Moisture Content (ASTM D2216) 64 260 each $ 9.00 $ 576.00 2,340.00 Unconfined Compression (ASTM D2166) 12 32 each $ 44.00 $ 528.00 1,408.00 Standard Xxxxxxx Test (ASTM D698) 1 2 each $ 175.00 $ 175.00 350.00 California Bearing Ratio, 3-Point Points per set (ASTM D1883) 3 6 each $ 185.00 $ 555.00 1,110.00 Sub-Total $ 4,802.00 12,216.00 Item Estimated Quantity Unit Unit Price Estimated Cost Engineering, coordination, supervision, analysis, and report preparation*: Senior engineer, P.E. 10 28 hours $ 150.00 $ 1,500.00 4,200.00 Graduate engineer/EIT 36 engineer 72 hours $ 85.00 $ 3,060.00 Clerical/Drafting Support 6 6,120.00 Engineering Assistant 20 hours $ 60.00 $ 360.00 1,200.00 Sub-Total $ 4,920.00 11,520.00 TOTAL FOR THE GEOTECHNICAL INVESTIGATION $ 16,967.00 * includes desktop review of surface faults within the project area. P a g e 4 of 5 Proposal No. APE21-788 Proposed 00xx Xxxxxx Extension Project No. 13106 XX 00X xx Xxxx Xxxxxx Xxxxxxxx, Xxxxx March 5, 202139,736.00

Appears in 2 contracts

Samples: Agreement, Agreement

Time is Money Join Law Insider Premium to draft better contracts faster.