ENTRYWAY SYSTEMS Sample Clauses

ENTRYWAY SYSTEMS. PERFORMANCE METRICS AND MEASUREMENT Protocols promoting effective use of entryway systems shall be wholly adopted. Quality control checks shall be used to ensure 100% adoption. PRACTICES TO OPTIMIZE USE AND MAINTENANCE OF ENTRYWAY SYSTEMS All entryways and entrances into Xxxxxxxxxx and Xxxxxxx building are equipped with walk-off mats: ▪ Walk-off mats shall be installed at all primary entrances. These systems shall be a minimum of 10 feet long in the direction of travel. ▪ The walk-off mats shall be professionally cleaned and thoroughly vacuumed onsite on a daily basis. The flooring beneath the mats shall be vacuumed and mopped on a weekly basis as well. ▪ Secondary entrances shall also have walk-off mats of 10–12 feet in length to capture initial loose particles entering the building. These mats must be vacuumed daily, and the floor beneath shall be vacuumed and mopped on a weekly basis.
AutoNDA by SimpleDocs

Related to ENTRYWAY SYSTEMS

  • Systems The details of any systems work will be determined after a thorough business analysis. System's work will be billed on a time and material basis. Investors Bank provides an allowance of 10 systems hours for data extract set up and reporting extract set up. Additional hours will be billed on a time and material basis.

  • Secondary Systems The Developer and Connecting Transmission Owner shall each cooperate with the other in the inspection, maintenance, and testing of control or power circuits that operate below 600 volts, AC or DC, including, but not limited to, any hardware, control or protective devices, cables, conductors, electric raceways, secondary equipment panels, transducers, batteries, chargers, and voltage and current transformers that directly affect the operation of Developer or Connecting Transmission Owner’s facilities and equipment which may reasonably be expected to impact the other Party. The Developer and Connecting Transmission Owner shall each provide advance notice to the other Party, and to NYISO, before undertaking any work on such circuits, especially on electrical circuits involving circuit breaker trip and close contacts, current transformers, or potential transformers.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Appliances The Landlord shall: (check one) ☐ - Provide the following appliances: . ☐ - Not provide any appliances.

Time is Money Join Law Insider Premium to draft better contracts faster.