Entry Level Skills Sample Clauses

Entry Level Skills. Consider what the job demands are at the entry or starting point, after the orientation period, not what would be nice to have or what outstanding performers or long-term employees can do.
AutoNDA by SimpleDocs

Related to Entry Level Skills

  • Level 4 If the Employee is not satisfied with the response of the Assistant Superintendent for Administrative Services, the Employee may submit the grievance to the Superintendent within ten (10) days of the receipt of the response to Level 3. The Superintendent shall sign and date all copies when he/she receives them. The Superintendent shall respond in writing within ten (10) days of the above date. Either party may be accompanied by one other Employee or administrator.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • FREQUENCY AND CAPACITY LEVELS No restriction on frequency, capacity and aircraft type.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Measurement method An isolation resistance test instrument is connected between the live parts and the electrical chassis. The isolation resistance is subsequently measured by applying a DC voltage at least half of the working voltage of the high voltage bus. If the system has several voltage ranges (e.g. because of boost converter) in conductively connected circuit and some of the components cannot withstand the working voltage of the entire circuit, the isolation resistance between those components and the electrical chassis can be measured separately by applying at least half of their own working voltage with those components disconnected.

  • Registry-­‐Level Fees (a) Registry Operator shall pay ICANN a registry-­‐level fee equal to (i) the registry fixed fee of US$6,250 per calendar quarter and (ii) the registry-­‐level transaction fee (collectively, the “Registry-­‐Level Fees”). The registry-­‐level transaction fee will be equal to the number of annual increments of an initial or renewal domain name registration (at one or more levels, and including renewals associated with transfers from one ICANN-­‐accredited registrar to another, each a “Transaction”), during the applicable calendar quarter multiplied by US$0.25; provided, however that the registry-­‐level transaction fee shall not apply until and unless more than 50,000 Transactions have occurred in the TLD during any calendar quarter or any consecutive four calendar quarter period in the aggregate (the “Transaction Threshold”) and shall apply to each Transaction that occurred during each quarter in which the Transaction Threshold has been met, but shall not apply to each quarter in which the Transaction Threshold has not been met. Registry Operator’s obligation to pay the quarterly registry-­‐level fixed fee will begin on the date on which the TLD is delegated in the DNS to Registry Operator. The first quarterly payment of the registry-­‐level fixed fee will be prorated based on the number of calendar days between the delegation date and the end of the calendar quarter in which the delegation date falls.

  • Variable Registry-­‐Level Fee If the ICANN accredited registrars (accounting, in the aggregate, for payment of two-thirds of all registrar-level fees (or such portion of ICANN accredited registrars necessary to approve variable accreditation fees under the then-current registrar accreditation agreement), do not approve, pursuant to the terms of their registrar accreditation agreements with ICANN, the variable accreditation fees established by the ICANN Board of Directors for any ICANN fiscal year, upon delivery of notice from ICANN, Registry Operator shall pay to ICANN a variable registry-level fee, which shall be paid on a fiscal quarter basis, and shall accrue as of the beginning of the first fiscal quarter of such ICANN fiscal year (the “Variable Registry-Level Fee”). The fee will be calculated and invoiced by ICANN on a quarterly basis, and shall be paid by Registry Operator within sixty (60) calendar days with respect to the first quarter of such ICANN fiscal year and within twenty (20) calendar days with respect to each remaining quarter of such ICANN fiscal year, of receipt of the invoiced amount by ICANN. The Registry Operator may invoice and collect the Variable Registry-Level Fees from the registrars that are party to a registry-registrar agreement with Registry Operator (which agreement may specifically provide for the reimbursement of Variable Registry-Level Fees paid by Registry Operator pursuant to this Section 6.3); provided, that the fees shall be invoiced to all ICANN accredited registrars if invoiced to any. The Variable Registry-Level Fee, if collectible by ICANN, shall be an obligation of Registry Operator and shall be due and payable as provided in this Section 6.3 irrespective of Registry Operator’s ability to seek and obtain reimbursement of such fee from registrars. In the event ICANN later collects variable accreditation fees for which Registry Operator has paid ICANN a Variable Registry-Level Fee, ICANN shall reimburse the Registry Operator an appropriate amount of the Variable Registry-Level Fee, as reasonably determined by ICANN. If the ICANN accredited registrars (as a group) do approve, pursuant to the terms of their registrar accreditation agreements with ICANN, the variable accreditation fees established by the ICANN Board of Directors for a fiscal year, ICANN shall not be entitled to a Variable-Level Fee hereunder for such fiscal year, irrespective of whether the ICANN accredited registrars comply with their payment obligations to ICANN during such fiscal year. The amount of the Variable Registry-Level Fee will be specified for each registrar, and may include both a per-registrar component and a transactional component. The per‑registrar component of the Variable Registry-Level Fee shall be specified by ICANN in accordance with the budget adopted by the ICANN Board of Directors for each ICANN fiscal year. The transactional component of the Variable Registry-Level Fee shall be specified by ICANN in accordance with the budget adopted by the ICANN Board of Directors for each ICANN fiscal year but shall not exceed US$0.25 per domain name registration (including renewals associated with transfers from one ICANN accredited registrar to another) per year.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Usage Measurement Usage measurement for calls shall begin when answer supervision or equivalent Signaling System 7 (SS7) message is received from the terminating office and shall end at the time of call disconnect by the calling or called subscriber, whichever occurs first.

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

Time is Money Join Law Insider Premium to draft better contracts faster.