DRIVEWAY APPROACHES Sample Clauses

DRIVEWAY APPROACHES. 20.1 Each Lot and Block shall be serviced with a driveway approach constructed in accordance with the Plans filed to the complete satisfaction of the Director of Public Works.
AutoNDA by SimpleDocs
DRIVEWAY APPROACHES. The Owner agrees that driveway approaches shall be constructed in such width and location as shall be approved by the Director of Infrastructure Services and the Owner shall have the option of constructing the said driveway approaches as follows:
DRIVEWAY APPROACHES. The Owner shall construct driveway approaches for each lot in accordance with this Agreement including, but not limited to, the Design Information and the terms and specifications as set out in Schedule "J". Driveway approaches shall not be installed prior to the expiry of ONE (1) year following the completion of any underground Services being installed beneath the location of the proposed driveway approach on a phase by phase basis. Driveway approaches shall not be constructed without the consent of the Town. The driveway approaches shall be constructed at the risk of the Owner. Without limiting the generality of the foregoing, the Owner shall be required to repair or restore such driveway approaches, or construct new driveway approaches, if damage occurs to such driveway approaches as a result of repair or maintenance work being performed on the underground Services, said obligation to extend until the assumption of the Services by the Town. Driveway approaches shall be built from the curb to the front property line. To the extent that the driveway approach for any lot may not be installed in advance of the Owner transferring title to such lot, nevertheless the obligation to complete same shall remain an obligation binding upon not only the Owner but successors and assigns within the meaning of article 10.6 of this agreement.
DRIVEWAY APPROACHES. The Owner shall construct a driveway approach for each lot/unit in the development utilising one of the following sets of specifications and materials:

Related to DRIVEWAY APPROACHES

  • Sidewalks entrances, passages, elevators, vestibules, stairways, corridors, halls, lobby and any other part of the Building shall not be obstructed or encumbered by any Tenant or used for any purpose other than ingress or egress to and from each tenant’s premises. Landlord shall have the right to control and operate the common portions of the Building and exterior facilities furnished for common use of the tenants (such as the eating, smoking, and parking areas) in such a manner as Landlord deems appropriate.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Volunteer Firefighting Leave Leave without pay will be granted when an employee who is a volunteer firefighter is called to duty to respond to a fire, natural disaster or medical emergency.

  • Roads 16. (1) The Joint Venturers shall —

  • COMMUTE TRIP REDUCTION AND PARKING 24.1 The Employer will continue to encourage but not require employees to use alternate means of transportation to commute to and from work consistent with the Commute Trip Reduction (CTR) law and the needs of the Employer and the community.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Technology Upgrades Notwithstanding any other provision of this Agreement, Verizon shall have the right to deploy, upgrade, migrate and maintain its network at its discretion. The Parties acknowledge that Verizon, at its election, may deploy fiber throughout its network and that such fiber deployment may inhibit or facilitate PNG’s ability to provide service using certain technologies. Nothing in this Agreement shall limit Verizon's ability to modify its network through the incorporation of new equipment or software or otherwise. PNG shall be solely responsible for the cost and activities associated with accommodating such changes in its own network.

  • Transponders will be assigned to each covert vehicle and are to be stored in the glove compartment, console or other secure place within the assigned vehicle when not in use.

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.

Time is Money Join Law Insider Premium to draft better contracts faster.