{"component": "clause", "props": {"groups": [{"samples": [{"hash": "lBFjaPVxvZc", "uri": "/contracts/lBFjaPVxvZc#draft-report", "label": "Professional Services", "score": 33.1181216391, "published": true}, {"hash": "cB09iAYCuLd", "uri": "/contracts/cB09iAYCuLd#draft-report", "label": "Contract", "score": 32.9985950757, "published": true}, {"hash": "1UPKH8UyUTM", "uri": "/contracts/1UPKH8UyUTM#draft-report", "label": "Professional Services", "score": 32.9973235165, "published": true}], "snippet_links": [{"key": "specific-project", "type": "definition", "offset": [45, 61]}, {"key": "copies-to", "type": "definition", "offset": [82, 91]}, {"key": "for-review", "type": "clause", "offset": [99, 109]}, {"key": "exhibits-and-attachments", "type": "clause", "offset": [146, 170]}, {"key": "responsible-professional", "type": "definition", "offset": [198, 222]}, {"key": "the-project", "type": "clause", "offset": [237, 248]}], "snippet": "1. A-E shall complete a Draft Report for the specific project and submit four (4) copies to County for review. The Draft Report shall include all exhibits and attachments and shall be signed by the responsible professional who worked on the project.\n2. The Draft Report might be expected to include, but not be limited to the following items. Those items that will be required for all reports are shown in bold italic type.", "size": 9, "hash": "68d2d8305d8d9419e8495b4b82aaa1d8", "id": 1}, {"samples": [{"hash": "bEjqp7IFRnB", "uri": "/contracts/bEjqp7IFRnB#draft-report", "label": "Detailed Engineering Study Funding Contract", "score": 28.9246791445, "published": true}, {"hash": "jWyb1ubp2Ms", "uri": "/contracts/jWyb1ubp2Ms#draft-report", "label": "Detailed Engineering Study Funding Contract", "score": 28.5250234778, "published": true}], "snippet_links": [{"key": "participant-will", "type": "clause", "offset": [8, 24]}, {"key": "report-to", "type": "definition", "offset": [40, 49]}, {"key": "technical-reviewer", "type": "definition", "offset": [54, 72]}, {"key": "with-a-copy", "type": "definition", "offset": [74, 85]}, {"key": "electronic-format", "type": "definition", "offset": [109, 126]}, {"key": "study-report", "type": "definition", "offset": [375, 387]}, {"key": "minimum-requirements", "type": "definition", "offset": [388, 408]}, {"key": "approval-of", "type": "clause", "offset": [478, 489]}, {"key": "approved-by", "type": "definition", "offset": [560, 571]}, {"key": "participant-incentive", "type": "definition", "offset": [633, 654]}, {"key": "participant-a", "type": "definition", "offset": [831, 844]}, {"key": "reasonable-period-of-time", "type": "clause", "offset": [845, 870]}, {"key": "provided-that", "type": "clause", "offset": [933, 946]}, {"key": "terms-and-conditions-of-this-agreement", "type": "clause", "offset": [1000, 1038]}, {"key": "satisfaction-of", "type": "clause", "offset": [1111, 1126]}, {"key": "date-hereof", "type": "clause", "offset": [1214, 1225]}], "snippet": "(i) The Participant will submit a Draft Report to the Technical Reviewer, with a copy (in hard or searchable electronic format) to the LDC. The Technical Reviewer will communicate to the Participant how many days it will take the Technical Reviewer to review the Draft Report.\n(ii) If the Technical Reviewer determines that the Draft Report reflects the Detailed Engineering Study Report Minimum Requirements and the Detailed Engineering Study SOW, the LDC will communicate the approval of the Draft Report to the Participant.\n(iii) If the Draft Report is not approved by the Technical Reviewer, the LDC will not pay any part of the Participant Incentive to the Participant and will communicate to the Participant the reasons (if and as provided by the Technical Reviewer) for not approving the Draft Report. The LDC may allow the Participant a reasonable period of time to address such deficiencies and to re-submit a Draft Report, provided that such revised Draft Report will remain subject to the terms and conditions of this Agreement. If such revised Draft Report does not address such deficiencies to the satisfaction of the LDC and the Technical Reviewer on or before the earlier of (A) eight months of the date hereof and", "size": 6, "hash": "f5ea79e4b8d37c098e6d74cac8ae583e", "id": 3}, {"samples": [{"hash": "nvwrU8wb3w", "uri": "/contracts/nvwrU8wb3w#draft-report", "label": "Collective Agreement", "score": 23.9801505818, "published": true}, {"hash": "ft33mtU0Ieo", "uri": "/contracts/ft33mtU0Ieo#draft-report", "label": "Collective Agreement", "score": 22.7604380561, "published": true}, {"hash": "5hJkLqoXFgN", "uri": "/contracts/5hJkLqoXFgN#draft-report", "label": "Collective Agreement", "score": 20.1731690623, "published": true}], "snippet_links": [{"key": "the-investigation", "type": "clause", "offset": [19, 36]}, {"key": "the-investigator", "type": "clause", "offset": [38, 54]}, {"key": "provide-a", "type": "definition", "offset": [61, 70]}, {"key": "report-in-writing", "type": "clause", "offset": [77, 94]}, {"key": "respond-in-writing", "type": "definition", "offset": [337, 355]}, {"key": "in-order-to", "type": "clause", "offset": [376, 387]}], "snippet": "Upon completion of the investigation, the investigator shall provide a draft report in writing to the complainant and respondent within 10 days of completing the investigation. The draft (and final) report shall include findings on whether the complaint has been substantiated. The complainant and respondent will be afforded 10 days to respond in writing to the draft report in order to clarify or correct factual errors or conclusions.", "size": 6, "hash": "ef951eaa30be0084d1b95502a7516346", "id": 2}, {"samples": [{"hash": "836mUn3yXWJ", "uri": "/contracts/836mUn3yXWJ#draft-report", "label": "On Call Construction Services Agreement", "score": 28.8235514119, "published": true}, {"hash": "azikqbfFWUN", "uri": "/contracts/azikqbfFWUN#draft-report", "label": "On Call Construction Services Agreement", "score": 28.7058446059, "published": true}], "snippet_links": [{"key": "specific-project", "type": "definition", "offset": [42, 58]}, {"key": "copies-to", "type": "definition", "offset": [79, 88]}, {"key": "for-review", "type": "clause", "offset": [96, 106]}, {"key": "exhibits-and-attachments", "type": "clause", "offset": [143, 167]}, {"key": "responsible-professional", "type": "definition", "offset": [195, 219]}, {"key": "the-project", "type": "clause", "offset": [234, 245]}, {"key": "table-of-contents", "type": "definition", "offset": [420, 437]}, {"key": "scope-of-work", "type": "definition", "offset": [467, 480]}, {"key": "site-description", "type": "definition", "offset": [483, 499]}, {"key": "field-investigation", "type": "definition", "offset": [513, 532]}, {"key": "testing-of-samples", "type": "clause", "offset": [575, 593]}, {"key": "test-results", "type": "definition", "offset": [596, 608]}, {"key": "slope-stability", "type": "definition", "offset": [704, 719]}, {"key": "concluding-statement", "type": "clause", "offset": [745, 765]}, {"key": "with-reference-to", "type": "clause", "offset": [766, 783]}, {"key": "purpose-of", "type": "clause", "offset": [784, 794]}, {"key": "unanticipated-conditions", "type": "clause", "offset": [822, 846]}, {"key": "the-plan", "type": "clause", "offset": [877, 885]}, {"key": "safety-factor", "type": "definition", "offset": [1010, 1023]}, {"key": "equal-to", "type": "definition", "offset": [1024, 1032]}, {"key": "moisture-content", "type": "definition", "offset": [1183, 1199]}, {"key": "excavated-soil", "type": "definition", "offset": [1233, 1247]}, {"key": "for-settlement", "type": "clause", "offset": [1316, 1330]}, {"key": "fill-placement", "type": "clause", "offset": [1355, 1369]}, {"key": "sand-equivalence", "type": "clause", "offset": [1410, 1426]}, {"key": "maximum-height", "type": "definition", "offset": [1826, 1840]}, {"key": "during-construction", "type": "clause", "offset": [1865, 1884]}, {"key": "recommendations-for", "type": "clause", "offset": [2166, 2185]}, {"key": "removal-of", "type": "definition", "offset": [2245, 2255]}, {"key": "unsuitable-material", "type": "definition", "offset": [2256, 2275]}, {"key": "disposal-of", "type": "clause", "offset": [2278, 2289]}, {"key": "preparation-of", "type": "clause", "offset": [2311, 2325]}, {"key": "natural-ground", "type": "definition", "offset": [2326, 2340]}, {"key": "to-receive", "type": "definition", "offset": [2341, 2351]}, {"key": "native-soils", "type": "definition", "offset": [2374, 2386]}, {"key": "engineered-fill", "type": "definition", "offset": [2432, 2447]}, {"key": "and-safety", "type": "clause", "offset": [2593, 2603]}, {"key": "construction-considerations", "type": "clause", "offset": [2606, 2633]}, {"key": "drainage-and-erosion-control", "type": "clause", "offset": [2676, 2704]}, {"key": "location-map", "type": "clause", "offset": [2780, 2792]}, {"key": "regional-fault", "type": "definition", "offset": [2795, 2809]}, {"key": "structural-features", "type": "clause", "offset": [2891, 2910]}, {"key": "proposed-design", "type": "clause", "offset": [2913, 2928]}, {"key": "summary-table", "type": "definition", "offset": [3186, 3199]}, {"key": "civil-engineer", "type": "definition", "offset": [3463, 3477]}, {"key": "geotechnical-engineer", "type": "clause", "offset": [3489, 3510]}, {"key": "engineering-geologist", "type": "definition", "offset": [3519, 3540]}], "snippet": "A-E shall complete a Draft Report for the specific project and submit four (4) copies to County for review. The Draft Report shall include all exhibits and attachments and shall be signed by the responsible professional who worked on the project. The Draft Report might be expected to include, but not be limited to the following items. Those items that will be required for all reports are shown in bold italic type. \u2022 Table of Contents \u2022 Introduction, Purpose, and Scope of Work \u2022 Site Description \u2022 Methods of Field Investigation (surface and subsurface) \u2022 Methods of Lab Testing of Samples \u2022 Test Results \u2022 Site Geology (Bedrock and soil units, geologic structures, landslides, etc.) \u2022 Groundwater \u2022 Slope Stability Analysis \u2022 Conclusions o Concluding statement with reference to purpose of investigation and report o Unanticipated conditions encountered o Deviations from the plan (if any plan exists) o Bedrock excavating conditions and rippability o Gross stability: Steepest cut slopes possible with a safety factor equal to or greater than 1:1 for a pseudostatic condition. o Surficial stability and erodibility of cut slopes and fill slopes o Soil units \u25aa Classification \u25aa Moisture content \u25aa Sulfate content \u25aa Shrinkage of excavated soil \u25aa Stability of temporary cut slopes \u25aa Compressibility and potential for settlement or consolidation due to fill placement \u25aa Potential for expansion or collapse \u25aa Sand equivalence \u25aa Dry densities \u25aa Shear strengths (\u00d8 and c) o Seismicity \u25aa Regional \u25aa Local earthquake effects \u25aa Ground rupture potential \u25aa Liquefaction potential \u25aa Lateral spreading potential \u25aa Potential for ground lurching \u25aa Potential for Tsunami \u25aa Potential for seiche \u25aa Seismically included landsliding or rockfall \u2022 Recommendations o Methods of excavation by equipment and/or blasting o Slope ration (H:V) and maximum height of temporary cut slopes during construction o Stabilization of interim cut slopes (if necessary) o Slope ratio (H:V) and maximum height of temporary cut slopes during construction o Shoring load, slope gradients, and stabilization of temporary cut slopes o Slope ratio (H:V) and maximum height of fill slopes o Key and bench recommendations for constructing fill slopes o Terrace drains and downdrains o Removal of unsuitable material o Disposal of oversized material o Preparation of natural ground to receive fill o Suitability of native soils for use as backfill o Relative compaction of engineered fill and natural subgrade o Subdrains o Engineering and geologic inspections during construction for competence of materials, stability of cut slopes and safety o Construction considerations o Buttress fills or stabilization fills o Drainage and erosion control during construction o Foundation recommendations \u2022 Illustrations o Project location map o Regional fault and seismicity map o Geotechnical map showing \u25aa Existing topography and existing structural features \u25aa Proposed design \u25aa Distribution and explanation of geological map units (soil and Bedrock units, geologic structures, and landslides) \u25aa Locations of test-pits and borings \u25aa Trace of geotechnical cross-sections o Geotechnical cross-sections o Boring logs and test-pit logs o Summary table of major cut slopes and fill slopes \u25aa Slope numbers \u25aa Cross-section reference \u25aa Slope height and slope ratio (H:V) \u25aa Slope type and direction faced by slope \u25aa Geologic condition \u25aa Remarks \u25aa References \u2022 Authentication o Original ink signatures of the responsible civil engineer and/or the geotechnical engineer and the engineering geologist who worked on the project", "size": 3, "hash": "b25b4d068251e8925d5d3ea30b6c4b2b", "id": 10}, {"samples": [{"hash": "bpWa2nQFmt5", "uri": "/contracts/bpWa2nQFmt5#draft-report", "label": "Collective Agreement", "score": 35.1873589187, "published": true}, {"hash": "6q4JtUwvjjX", "uri": "/contracts/6q4JtUwvjjX#draft-report", "label": "Collective Agreement", "score": 35.1847819758, "published": true}, {"hash": "hxZEwjJTxgI", "uri": "/contracts/hxZEwjJTxgI#draft-report", "label": "Collective Agreement", "score": 34.059700948, "published": true}], "snippet_links": [{"key": "evaluator-shall", "type": "definition", "offset": [4, 19]}, {"key": "the-teacher", "type": "definition", "offset": [49, 60]}, {"key": "the-report", "type": "clause", "offset": [62, 72]}], "snippet": "The evaluator shall review the draft report with the teacher. The report shall not include weaknesses of which the teacher had not previously been informed.", "size": 5, "hash": "54ebe8fc9fb5345479361b5aab3351f8", "id": 4}, {"samples": [{"hash": "denoH1nsIyU", "uri": "/contracts/denoH1nsIyU#draft-report", "label": "Provincial Collective Agreement", "score": 36.1124434738, "published": true}, {"hash": "3nHdzjsg5PK", "uri": "/contracts/3nHdzjsg5PK#draft-report", "label": "Collective Agreement", "score": 32.4859943663, "published": true}, {"hash": "uvnRiCC6lP", "uri": "/contracts/uvnRiCC6lP#draft-report", "label": "Collective Agreement", "score": 26.7440109514, "published": true}], "snippet_links": [{"key": "the-report", "type": "clause", "offset": [19, 29]}, {"key": "prepared-by", "type": "definition", "offset": [39, 50]}, {"key": "the-evaluator", "type": "clause", "offset": [51, 64]}, {"key": "the-teacher", "type": "definition", "offset": [69, 80]}, {"key": "opportunity-to-meet", "type": "clause", "offset": [105, 124]}, {"key": "of-the-final-report", "type": "clause", "offset": [194, 213]}, {"key": "a-copy-of-the", "type": "clause", "offset": [215, 228]}, {"key": "pursuant-to", "type": "definition", "offset": [324, 335]}, {"key": "this-subsection", "type": "definition", "offset": [336, 351]}, {"key": "the-association", "type": "clause", "offset": [375, 390]}, {"key": "administrative-officer", "type": "clause", "offset": [431, 453]}, {"key": "recommendations-for-improvement", "type": "clause", "offset": [498, 529]}, {"key": "reference-to", "type": "definition", "offset": [547, 559]}, {"key": "objective-data", "type": "definition", "offset": [595, 609]}, {"key": "specific-examples", "type": "clause", "offset": [613, 630]}, {"key": "the-evaluative-process", "type": "clause", "offset": [695, 717]}], "snippet": "i. A draft copy of the report shall be prepared by the evaluator and the teacher shall have a reasonable opportunity to meet with the evaluator at least forty-eight (48) hours before submission of the final report. A copy of the draft report shall be provided to the teacher.\nii. The teacher may be accompanied to a meeting pursuant to this subsection by a representative of the Association. The evaluator may be accompanied by an administrative officer.\niii. Specific strengths and, if necessary, recommendations for improvement shall be stated. Reference to criteria shall be substantiated by objective data or specific examples.\niv. The report shall reflect only those areas discussed during the evaluative process.", "size": 4, "hash": "18d9a2b89e999d4a543ff4b6669863a3", "id": 5}, {"samples": [{"hash": "7wNZwWJqjrU", "uri": "/contracts/7wNZwWJqjrU#draft-report", "label": "Collective Agreement", "score": 28.6536797541, "published": true}, {"hash": "9ibQryIZ48L", "uri": "/contracts/9ibQryIZ48L#draft-report", "label": "Collective Agreement", "score": 28.3908924664, "published": true}, {"hash": "jDIB0JNiPMi", "uri": "/contracts/jDIB0JNiPMi#draft-report", "label": "Collective Agreement", "score": 24.7645448323, "published": true}], "snippet_links": [{"key": "the-report", "type": "clause", "offset": [16, 26]}, {"key": "prepared-by", "type": "definition", "offset": [36, 47]}, {"key": "the-evaluator", "type": "clause", "offset": [48, 61]}, {"key": "the-teacher", "type": "definition", "offset": [66, 77]}, {"key": "opportunity-to-meet", "type": "clause", "offset": [102, 121]}, {"key": "of-the-final-report", "type": "clause", "offset": [191, 210]}, {"key": "a-copy-of-the", "type": "clause", "offset": [212, 225]}], "snippet": "A draft copy of the report shall be prepared by the evaluator and the teacher shall have a reasonable opportunity to meet with the evaluator at least forty-eight (48) hours before submission of the final report. A copy of the draft report shall be provided to the teacher.", "size": 4, "hash": "4bfb6595c6c5bb88dacdfb4f498d7a66", "id": 6}, {"samples": [{"hash": "dL90wy06Ych", "uri": "/contracts/dL90wy06Ych#draft-report", "label": "Local and Provincial Matters Agreement", "score": 33.0635789257, "published": true}, {"hash": "dQdOinCvU9R", "uri": "/contracts/dQdOinCvU9R#draft-report", "label": "Local and Provincial Matters Agreement", "score": 26.9356605065, "published": true}, {"hash": "1CpLE3lTs1", "uri": "/contracts/1CpLE3lTs1#draft-report", "label": "Local and Provincial Matters Agreement", "score": 26.9356605065, "published": true}], "snippet_links": [{"key": "normal-circumstances", "type": "definition", "offset": [3, 23]}, {"key": "conclusion-of", "type": "clause", "offset": [53, 66]}, {"key": "schedule-of-observations", "type": "clause", "offset": [71, 95]}, {"key": "the-teacher", "type": "definition", "offset": [96, 107]}, {"key": "the-report", "type": "clause", "offset": [138, 148]}, {"key": "in-the-case", "type": "clause", "offset": [150, 161]}, {"key": "less-than-satisfactory", "type": "clause", "offset": [173, 195]}, {"key": "time-frame", "type": "definition", "offset": [214, 224]}, {"key": "one-week", "type": "definition", "offset": [255, 263]}, {"key": "after-receiving", "type": "clause", "offset": [264, 279]}, {"key": "the-opportunity", "type": "clause", "offset": [333, 348]}, {"key": "the-evaluator", "type": "clause", "offset": [365, 378]}, {"key": "changes-to-the", "type": "definition", "offset": [390, 404]}, {"key": "third-person", "type": "definition", "offset": [513, 525]}, {"key": "evaluator-shall", "type": "definition", "offset": [531, 546]}, {"key": "to-ensure", "type": "clause", "offset": [565, 574]}, {"key": "prior-to", "type": "definition", "offset": [652, 660]}, {"key": "the-final-report", "type": "clause", "offset": [668, 684]}], "snippet": "In normal circumstances, within two (2) weeks of the conclusion of the schedule of observations the teacher shall receive a draft copy of the report. In the case of pending less than satisfactory reports, a longer time frame should be anticipated. Within one week after receiving the draft copy of the report, the teacher shall have the opportunity of meeting with the evaluator to propose changes to the draft. In the case of a pending less than satisfactory report, the teacher may elect to be accompanied by a third person. The evaluator shall make every effort to ensure accuracy and shall attempt to reach agreement on the report with the teacher prior to filing the final report.", "size": 4, "hash": "a2a101c4ecef9a8276164df16a9c4cdd", "id": 7}, {"samples": [{"hash": "iykOkNlIx3Z", "uri": "/contracts/iykOkNlIx3Z#draft-report", "label": "Good Neighbor Agreement", "score": 34.4621802348, "published": true}, {"hash": "9gg0XOsoU4t", "uri": "/contracts/9gg0XOsoU4t#draft-report", "label": "Good Neighbor Agreement", "score": 24.4688569473, "published": true}, {"hash": "7IXQIzF2p4o", "uri": "/contracts/7IXQIzF2p4o#draft-report", "label": "Good Neighbor Agreement", "score": 21.5693724567, "published": true}], "snippet_links": [{"key": "the-third-party", "type": "definition", "offset": [0, 15]}, {"key": "based-on", "type": "clause", "offset": [45, 53]}, {"key": "findings-of-fact", "type": "definition", "offset": [124, 140]}], "snippet": "The Third Party shall prepare a draft report based on the above evaluation. The draft report shall include, as appropriate, findings of fact, recommendations, and conclusions.", "size": 3, "hash": "aa6afd2400df86337d81ef6a66843003", "id": 8}, {"samples": [{"hash": "iykOkNlIx3Z", "uri": "/contracts/iykOkNlIx3Z#draft-report", "label": "Good Neighbor Agreement", "score": 34.4621802348, "published": true}, {"hash": "9gg0XOsoU4t", "uri": "/contracts/9gg0XOsoU4t#draft-report", "label": "Good Neighbor Agreement", "score": 24.4688569473, "published": true}, {"hash": "7IXQIzF2p4o", "uri": "/contracts/7IXQIzF2p4o#draft-report", "label": "Good Neighbor Agreement", "score": 21.5693724567, "published": true}], "snippet_links": [{"key": "based-on", "type": "clause", "offset": [33, 41]}, {"key": "findings-of-fact", "type": "definition", "offset": [112, 128]}], "snippet": "SMC shall prepare a draft report based on the above evaluation. The draft report shall include, as appropriate, findings of fact, recommendations, and conclusions.", "size": 3, "hash": "ba0458885e6b2e4f830bbf1a74dc30a1", "id": 9}], "next_curs": "ClUST2oVc35sYXdpbnNpZGVyY29udHJhY3RzcjELEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IhVkcmFmdC1yZXBvcnQjMDAwMDAwMGEMogECZW4YACAA", "clause": {"parents": [["airport-requirements", "Airport Requirements"], ["reports", "Reports"], ["benefits", "Benefits"], ["employee-and-family-assistance-plan", "Employee and Family Assistance Plan"], ["geotechnical-services", "GEOTECHNICAL SERVICES"]], "title": "Draft Report", "children": [["", ""], ["conclusions", "Conclusions"], ["table-of-contents", "Table of Contents"], ["sand-equivalence", "Sand equivalence"], ["photographs", "Photographs"]], "size": 81, "id": "draft-report", "related": [["cost-report", "COST REPORT", "COST REPORT"], ["expert-reports", "Expert Reports", "Expert Reports"], ["audit-report", "Audit Report", "Audit Report"], ["progress-report", "Progress Report", "Progress Report"], ["cmi-rai-mds-report", "CMI/RAI MDS Report", "CMI/RAI MDS Report"]], "related_snippets": [], "updated": "2025-07-07T12:37:39+00:00"}, "json": true, "cursor": ""}}