Designs and Drawings Sample Clauses

Designs and Drawings all the drawings and design required for obtaining the development permission and building permission and completion, the Development rules in force at the time and Chhattisgarh Bhoomi Vikas Niyam, 1984 with all amendments shall be applicable.
AutoNDA by SimpleDocs
Designs and Drawings. APPENDIX 7...............................................................................................................................
Designs and Drawings. In respect of the Concessionaire’s obligations relating to the Designs and Drawings for the Additional Project Facilities, the following shall apply:
Designs and Drawings. Where designs are prepared by the Company for the Buyer, acceptance of the Contract by the Company is conditional upon such designs having been previously approved in writing by the Buyer and where the Goods are manufactured to designs submitted by the Buyer. The Company undertakes to provide them in strict conformity with such designs but accepts no responsibility in either case for functions or purpose of the Goods. Designs, drawings, photographic images and other media prepared by the Company remain the property of the Company, unless such variation is specifically agreed in writing by the Company prior to confirmation of the Buyers order. The Company reserves the right to use such media for marketing and other purposes.
Designs and Drawings. The feedstock facilities and the synthetic fuel production facilities for each Project, if constructed in accordance with the designs and construction drawings in respect thereof, will have the operational capabilities to produce Qualified Fuels of a quality expected to satisfy the requirements of the marketplace for synthetic coal-based fuels, and the capacities to produce Qualified Fuels as contemplated in the Base Case.
Designs and Drawings. (i) The Concessionaire shall prepare the Designs and Drawings in accordance with the Technical Specifications, Applicable Laws and Applicable Permits. The Designs and Drawings shall be drawn to scale, with accurate dimensions, to minimize construction delays, disputes and cost overruns and to ensure smooth development of the Project Facilities. The Project Facilities should be designed in a manner such that the Concessionaire can obtain an environmental clearance for the WtE Facility, an authorisation under the SWM Rules for setting up the WtE Facility, approvals for grid connection and commissioning certificates from the Offtaker or the relevant Governmental Authority, and a consent to operate for the operation of the Project Facilities.
Designs and Drawings. (a) All drawings, photographs, plans, capacities, weights, measurements and other particulars contained in the quotation are approximate and are intended only to be a general description the goods and/or accessories ordered. Small deviations there from shall not invalidate the contract nor be made the basis of any claim against the company.
AutoNDA by SimpleDocs
Designs and Drawings. The Designs and Drawings requiring PQA review and approval for compliance with the Project Scope will be submitted to PQA in accordance with the Implementation Schedule. PQA shall within fifteen (15) Days of receipt, return them to QICT as compliant or detailed remarks indicating any non-compliance and in case these are not returned within fifteen (15) Days as aforesaid, these shall be deemed to have been approved. The procedures for the approval of Designs and Drawings are set out in Schedule 18 (Project Execution Guidelines).
Designs and Drawings. The Supplier shall execute the conceptual and detailed designs and the programming & engineering work, in compliance with the provisions of the Contract, or where not so specified, in accordance with good international engineering standards and practices.
Designs and Drawings. (i) The Concessionaire shall prepare the Designs and Drawings in accordance with the Technical Specifications, Applicable Laws and Applicable Permits. The Designs and Drawings shall be drawn to scale, with accurate dimensions, to minimize construction delays, disputes and cost overruns and to ensure smooth development of the Project Facilities. The Project Facilities should be designed in a manner such that the Concessionaire can obtain an environmental clearance for the WtC Facility, an authorisation under the SWM Rules for setting up the WtC Facility and a consent to operate for the operation of the Project Facilities.