DESIGN, PERMITTING and INSTALLATION Clause Samples
DESIGN, PERMITTING and INSTALLATION. 4.1 The Customer and the System must comply with all applicable requirements of the following; the most current versions of cited references apply: • All applicable building and zoning ordinances and codes • National Electric Code (NEC) requirements, including, but not limited to NEC Articles 690 and 705 • All applicable Underwriters Laboratories (UL) equipment certification requirements including, but not limited to UL 1741 and UL 1741 supplement A (including certifications of compliance with (“Smart” inverter requirements mandated under California Rule 21 for Phase 1,2 & 3 functions). • All applicable Institute of Electrical and Electronics Engineers (IEEE) requirements including, but not limited to the IEEE 1547-series (includes 1547.a, and 1547.1) . • All applicable National Fire Protection Agency (NFPA) requirements, including, but not limited to NFPA 70. At its sole expense, the Customer must:
1) Obtain all necessary zoning permits for the installation of the System.
2) Obtain all necessary electrical & building permit(s) for the installation of the System
3) Obtain and maintain any governmental authorizations or permits that may be required for the installation or operation of the System.
4) Have the design of its System (including all related equipment specifications and installation plans) reviewed and approved by a Professional Electrical Engineer that is currently licensed in the State of Iowa. The Customer must reimburse AMES for any and all losses, damages, claims, penalties, or liability AMES incurs as a result of the Customer’s failure to obtain or to maintain any governmental authorizations and permits that may be required for construction and operation of the Customer’s System.
4.2 The Customer or its designated representative (engineer, consultant, or contractor, for example) must complete Exhibits A and B and construct the System as specified in the completed/attached Exhibit A.
DESIGN, PERMITTING and INSTALLATION. 4.1 The Customer and the System must comply with all applicable requirements of the following; the most current versions of cited references apply: • All applicable building and zoning ordinances and codes • National Electric Code (NEC) requirements, including, but not limited to NEC Articles 690 and 705 • All applicable Underwriters Laboratories (UL) equipment certification requirements including, but not limited to ▇▇ ▇▇▇▇ , ▇▇ ▇▇▇▇ supplement A and UL 1741 (2016) certification requirements, including certifications of compliance with required advanced/smart inverter requirements mandated in Hawaii and California (i.e. California Phase1 autonomous inverter behaviors). • All applicable Institute of Electrical and Electronics Engineers (IEEE) requirements including, but not limited to the IEEE 1547-series (includes 1547.a, and 1547.1) . • All applicable National Fire Protection Agency (NFPA) requirements, including, but not limited to NFPA 70. At its sole expense, the Customer must:
1) Obtain all necessary zoning permits for the installation of the System.
2) Obtain all necessary electrical & building permit(s) for the installation of the System
3) Obtain and maintain any governmental authorizations or permits that may be required for the installation or operation of the System.
4) Have the design of its System (including all related equipment specifications and installation plans) reviewed and approved by a Professional Electrical Engineer that is currently licensed in the State of Iowa. The Customer must reimburse AMES for any and all losses, damages, claims, penalties, or liability AMES incurs as a result of the Customer’s failure to obtain or to maintain any governmental authorizations and permits that may be required for construction and operation of the Customer’s System.
4.2 The Customer or its designated representative (engineer, consultant, or contractor, for example) must complete Exhibits A and B and construct the System as specified in the completed/attached Exhibit A.