DESIGN-BUILD REQUEST FOR PROPOSAL PACKAGE. CONSULTANT will prepare a Request for Proposal (RFP) package that will be used to notify qualified contractors of the project and provide them a higher level of detail about the project. The RFP package shall include, but not limited to, the following:

Related to DESIGN-BUILD REQUEST FOR PROPOSAL PACKAGE

  • Request for Review If any operator believes that in his case any requirment of a recognized agency is excessive, the operator may request the administrator, division of forestry, to review the requirements. If in the opinion of the administrator any or all are not necessary in the interest of public safety, he may make such changes as he considers advisable. Bucket: Metal, plastic, canvas, or fiberglass container capable of holding at least one gallon of water. Motorcycle helmets qualify. Campfire means a fire set for cooking, warming, or ceremonial purposes; not more than 3 feet in diameter or height; void of overhanging branches; with all combustible material cleared at least 1-1/2 times the diameter of the fire; or a barbecue in a noncombustible container.

  • Interconnection Request The Interconnection Customer’s request, in accordance with the Tariff, to interconnect a new Small Generating Facility, or to materially increase the capacity of, or make a material modification to the operating characteristics of, an existing Small Generating Facility that is interconnected with the New York State Transmission System or the Distribution System. For the purposes of this Agreement, this definition of Interconnection Request shall supersede the definition of Interconnection Request set out in Attachment X to the ISO OATT. Interconnection Study – Any study required to be performed under Sections 32.2 or 32.3 of the SGIP. Material Modification – A modification that has a material impact on the cost or timing of any Interconnection Request with a later queue priority date. New York State Transmission System – The entire New York State electric transmission system, which includes: (i) the Transmission Facilities under ISO Operational Control; (ii) the Transmission Facilities Requiring ISO Notification; and (iii) all remaining transmission facilities within the New York Control Area. NYISO Deliverability Interconnection Standard – The standard that must be met, unless otherwise provided for by Attachment S to the ISO OATT, by (i) any generation facility larger than 2MW in order for that facility to obtain ▇▇▇▇; (ii) any Class Year Transmission Project proposing to interconnect to the New York State Transmission System and receive Unforced Capacity Delivery Rights; (iii) any entity requesting External ▇▇▇▇ Rights, and (iv) any entity requesting a ▇▇▇▇ transfer pursuant to Section 25.9.5 of Attachment S to the ISO OATT. To meet the NYISO Deliverability Interconnection Standard, the Interconnection Customer must, in accordance with the rules in Attachment S to the ISO OATT, fund or commit to fund any System Deliverability Upgrades identified for its project in the Class Year Deliverability Study. NYISO Minimum Interconnection Standard – The reliability standard that must be met by any generation facility or Class Year Transmission Project that is subject to NYISO’s Large Facility Interconnection Procedures in Attachment X to the ISO OATT or the NYISO’s Small Generator Interconnection Procedures in this Attachment Z, that is proposing to connect to the New York State Transmission System or Distribution System, to obtain ERIS. The Minimum Interconnection Standard is designed to ensure reliable access by the proposed project to the New York State Transmission System or to the Distribution System. The Minimum Interconnection Standard does not impose any deliverability test or deliverability requirement on the proposed interconnection. Operating Requirements – Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards. Party or Parties – The NYISO, Connecting Transmission Owner, Interconnection Customer or any combination of the above. Point of Interconnection – The point where the Interconnection Facilities connect with the New York State Transmission System or the Distribution System. Reasonable Efforts – With respect to an action required to be attempted or taken by a Party under this Agreement, efforts that are timely and consistent with Good Utility Practice and are otherwise substantially equivalent to those a Party would use to protect its own interests. Small Generating Facility – The Interconnection Customer’s facility, no larger than 20 MW for the production and/or storage for later injection of electricity identified in the Interconnection Request if proposing to interconnect to the New York State Transmission System or Distribution System, but shall not include (i) facilities proposing to simply receive power from the New York State Transmission System or the Distribution System; (ii) facilities proposing to interconnect to the New York State Transmission System or the Distribution System made solely for the purpose of generation with no wholesale sale for resale nor to net metering; (iii) facilities proposing to the New York State Transmission System or the Distribution System made solely for the purpose of net metering; (iv) facilities proposing to interconnect to LIPA’s distribution facilities; and (v) the Interconnection Customer’s Interconnection Facilities. A facility will be treated as a single Small Generating Facility if all units within the facility are behind a single facility meter, even if such units are different technology types. System Deliverability Upgrades – The least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements, to make the modifications or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Deliverability Interconnection Standard for Capacity Resource Interconnection Service. System Upgrade Facilities – The least costly configuration of commercially available components of electrical equipment that can be used, consistent with Good Utility Practice and Applicable Reliability Requirements to make the modifications to the existing transmission system that are required to maintain system reliability due to: (i) changes in the system, including such changes as load growth and changes in load pattern, to be addressed in the form of generic generation or transmission projects; and (ii) proposed interconnections. In the case of proposed interconnection projects, System Upgrade Facilities are the modification or additions to the existing New York State Transmission System that are required for the proposed project to connect reliably to the system in a manner that meets the NYISO Minimum Interconnection Standard. Tariff – The NYISO’s Open Access Transmission Tariff, as filed with the FERC, and as amended or supplemented from time to time, or any successor tariff. Trial Operation shall mean the period during which Interconnection Customer is engaged in on- site test operations and commissioning of the Small Generating Facility prior to Commercial Operation. Upgrades – The required additions and modifications to the Connecting Transmission Owner’s portion of the New York State Transmission System or the Distribution System at or beyond the Point of Interconnection. Upgrades may be System Upgrade Facilities or System Deliverability Upgrades Distribution Upgrades. Upgrades do not include Interconnection Facilities.

  • Request for Purchase The Company may from time to time during the Issuance Period make requests for purchases of Private Shelf Notes (each such request being herein called a “REQUEST FOR PURCHASE”). Each Request for Purchase shall be made to Prudential by telecopier and confirmed by nationwide overnight delivery service, and shall (i) specify the aggregate principal amount of Private Shelf Notes covered thereby, which shall not be less than $5,000,000 and shall not be greater than the Available Facility Amount at the time such Request for Purchase is made, (ii) specify the principal amounts, final maturities, principal prepayment dates and amounts and interest payment periods (quarterly in arrears) of the Private Shelf Notes covered thereby, (iii) specify the use of proceeds of such Private Shelf Notes, (iv) specify the proposed day for the closing of the purchase and sale of such Private Shelf Notes, which shall be a Business Day during the Issuance Period not more than thirty (30) days after the making of such Request for Purchase and in any event not less than three (3) days after any Acceptance with respect to such Request for Purchase under paragraph 2E, (v) specify the number of the account and the name and address of the depository institution to which the purchase prices of such Private Shelf Notes are to be transferred on the Private Shelf Closing Day for such purchase and sale, (vi) certify that the representations and warranties contained in paragraph 8 hereof are true on and as of the date of such Request for Purchase except to the extent of changes caused by the transactions herein contemplated and that there exists on the date of such Request for Purchase no Event of Default or Default (and that no Event of Default or Default shall arise as the result of the purchase and sale of such Private Shelf Notes), and (vii) be substantially in the form of EXHIBIT B attached hereto. Each Request for Purchase shall be in writing and shall be deemed made when received by Prudential.

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Advance Request To obtain a Term Loan Advance, Borrower shall complete, sign and deliver an Advance Request (at least one (1) Business Day before the Closing Date and at least five (5) Business Days before each Advance Date other than the Closing Date) to Agent. The Lenders shall fund the Term Loan Advance in the manner requested by the Advance Request provided that each of the conditions precedent to such Term Loan Advance is satisfied as of the requested Advance Date.