Rubric The rubrics are a scoring tool used for the Educator’s self-assessment, the formative assessment, the formative evaluation and the summative evaluation. The districts may use either the rubrics provided by ESE or comparably rigorous and comprehensive rubrics developed or adopted by the district and reviewed by ESE.
Warning Banners All systems providing access to PHI COUNTY discloses to 9 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 10 must display a warning banner stating that data is confidential, systems are logged, and system use is for 11 business purposes only by authorized users. User must be directed to log off the system if they do not 12 agree with these requirements.
Glazing All new and replacement exterior windows shall have sealed, low emmissivity, insulating glass units which are manufactured by members of SIGMA and IGCC. Sealed insulating glass shall meet ASTM E774, class B. Glass shall be hermetically dual sealed, inert gas filled, double pane units with exterior 3/16” bronze float glass (IoE second surface), ½” air space, and interior 3/16” clear float glass. Insulated panels, if used, shall be 1” laminated panels equal to Xxxxx Industries architectural panels with a porcelain fused-on finish. Wired or clear fire-rated glass shall be UL approved. Safety glass shall be tempered or laminated, and shall meet ANSI 297.1 standard.
Windows a. Front and rear windshield per California Vehicle Code § 26710.
Safety Glasses 10.3.1 Where a teacher is considered to be working in an “eye danger” area, the teacher shall receive a personal issue of standard neutral safety glasses which shall remain the property of the employer.
Welding Welding and use of cutting torches or cutoff saws will be permitted only in areas that have been cleared or are free of all material capable of carrying fire. Flammable debris and vegetation must be removed from within a minimum 10-foot radius of all welding and cutting operations. A shovel and a 5-gallon standard backpack water container filled and with handpump attached shall be immediately available for use in the event of a fire start. C8.212 – MARKET-RELATED CONTRACT TERM ADDITION (11/08). The term of this contract may be adjusted when a drastic reduction in wood product prices has occurred in accordance with 36 CFR 223.52. The Producer Price Index used to determine when a drastic reduction in price has occurred is stated in A20. Purchaser will be notified whenever the Chief determines that a drastic reduction in wood product prices has occurred. If the drastic reduction criteria specified in 36 CFR 223.52 are met for 2 consecutive calendar quarters, after contract award date, Contracting Officer will add 1 year to the contract term, upon Purchaser’s written request. For each additional consecutive quarter such a drastic reduction occurs, Contracting Officer will, upon written request, add an additional 3 months to the term during Normal Operating Season, except that no single 3-month addition shall extend the term of the contract by more than one year. Contracting Officer must receive Purchaser’s written request for a market-related contract term addition before the expiration of this contract. No more than 3 years shall be added to a contract's term by market-related contract term addition unless the following conditions are met:
Bicycles Bicycles or other vehicles shall not be permitted anywhere inside or on the sidewalks outside of the Building, except in those areas designated by Landlord for bicycle parking.
FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.
Towing Contractor shall meet all requirements set forth in Title 46 CFR, Part 15 for Towing Assistance. Unless otherwise specified in the work request, Purchasers require a dead-ship tow plan to be approved by the Coast Guard in accordance with the Puget Sound Harbor Safety Committee for vessels over 50-feet, unless the Coast Guard deems the plan unnecessary. Contractor is responsible to obtain a tow plan and provide Purchaser with an approved copy at least one (1) business day prior to the tow. The plan is located on the Puget Sound Harbor Safety Committee’s website under the Safety Plan link on the left side of the page (xxxx://xxxxx.xxx/about). This site will have the most update version of the plan.
Trees 1) Any major tree surgery or tree removal over a three (3) inch diameter, which becomes necessary through no fault of the Contractor, will be at the County's expense.