Current inhabitants Sample Clauses

Current inhabitants. The following special arrangements shall safeguard the rights and interests of current inhabitants of areas subject to territorial adjustment, and provide for orderly relocation to adequate alternative accommodation in appropriate locations where adequate livelihoods may be earned:
AutoNDA by SimpleDocs

Related to Current inhabitants

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • ROAD DIMENSIONS Purchaser shall perform road work in accordance with the dimensions shown on the TYPICAL SECTION SHEET and the specifications within this road plan.

  • Buildings The Employer will provide and maintain all state-owned buildings, facilities, and equipment in accordance with the specific written order(s) of the Michigan Departments of Licensing and Regulatory Affairs and/or Military and Veterans Affairs. Where facilities are leased by the Employer, the Employer shall make every reasonable effort to assure that such facilities comply with the order(s) of the Michigan Departments of Licensing and Regulatory Affairs and/or Military and Veterans Affairs.

  • Surface  Grade and shape the road surface, turnouts, and shoulders to the original shape on the TYPICAL SECTION SHEET. Inslope or outslope as directed to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.  Blading shall not undercut the backslope or cut into geotextile fabric on the road.  If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.  Surface material shall not be bladed off the roadway. Replace surface material when lost or worn away, or as directed by the Contract Administrator.  Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.  For roads with geotextile fabric: spread surface aggregate to fill in soft spots and wheel ruts (barrel spread) to prevent damage to the geotextile fabric.

  • DAMAGE TO COUNTY FACILITIES, BUILDINGS OR GROUNDS 8.16.1 The Contractor shall repair, or cause to be repaired, at its own cost, any and all damage to County facilities, buildings, or grounds caused by the Contractor or employees or agents of the Contractor. Such repairs shall be made immediately after the Contractor has become aware of such damage, but in no event later than thirty (30) days after the occurrence.

  • Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; flexible and rigid pavements; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-50 SUBGRADE. The soil which forms the pavement foundation.

  • Living Plants The Project Area may have living plants; however, there is no lawn grass in the Project Area.

  • Vegetation No trees or other vegetation may be removed from the site without prior approval from the Town, except in accordance with Section 4 above and pursuant to the Annual Plan.

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • EMBANKMENT WIDENING The minimum embankment widening is:  2 feet for embankment heights at centerline of 2 to 6 feet.  4 feet for embankment heights at centerline of greater than 6 feet. Purchaser shall apply embankment widening equally to both sides of the road to achieve the required width.

Time is Money Join Law Insider Premium to draft better contracts faster.