Crane Work Plan Clause Samples

Crane Work Plan. The Contractor shall provide a crane work plan to the Contracting Officer as per Section F. The crane work plan shall include, for each crane proposed, the specific model of crane, a drawing of all locations (exact) at which dimensions, wheel sizes, number of wheels, wheel spacing, tire pressure(s), number of axles, axle spacing, maximum wheel load to be exerted during operations and maximum outrigger load to be exerted during operations. The Contractor shall allow at least ten (10) working days for review of the crane work plan provided. No crane operations shall begin prior to completion of the review of the crane work plan by the Government.