{"component": "clause", "props": {"groups": [{"snippet_links": [{"key": "dry-pipe-sprinkler-system", "type": "definition", "offset": [42, 67]}, {"key": "in-accordance-with", "type": "definition", "offset": [112, 130]}, {"key": "the-requirements", "type": "clause", "offset": [131, 147]}, {"key": "fire-protection", "type": "definition", "offset": [200, 215]}], "size": 3, "snippet": "The cooling tower shall be protected by a dry pipe sprinkler system furnished and installed for moderate hazard in accordance with the requirements of NFPA-13. If a concrete structure is provided, no fire protection is needed or supplied.", "samples": [{"hash": "7S3pqVPn6F6", "uri": "/contracts/7S3pqVPn6F6#cooling-tower", "label": "Engineering, Procurement and Construction Services Agreement (Aes Ironwood LLC)", "score": 18.0, "published": true}, {"hash": "4frtOfVenCK", "uri": "/contracts/4frtOfVenCK#cooling-tower", "label": "Engineering, Procurement and Construction Services Agreement (Aes Ironwood LLC)", "score": 18.0, "published": true}, {"hash": "2qd3p0ayVZG", "uri": "/contracts/2qd3p0ayVZG#cooling-tower", "label": "Engineering, Procurement and Construction Services Agreement (Aes Ironwood LLC)", "score": 18.0, "published": true}], "hash": "df855819c6900ca18249cb5324affc81", "id": 1}, {"snippet_links": [{"key": "in-the-event", "type": "clause", "offset": [0, 12]}, {"key": "the-demised-premises", "type": "clause", "offset": [56, 76]}, {"key": "regular-business-hours", "type": "definition", "offset": [101, 123]}, {"key": "landlord-shall", "type": "clause", "offset": [125, 139]}, {"key": "upon-reasonable", "type": "clause", "offset": [141, 156]}, {"key": "advance-notice", "type": "definition", "offset": [157, 171]}, {"key": "the-building", "type": "definition", "offset": [181, 193]}, {"key": "equipment-and-machinery", "type": "definition", "offset": [225, 248]}], "size": 3, "snippet": "In the event Tenant conducts business in any portion of the Demised Premises during hours other than regular business hours, Landlord shall, upon reasonable advance notice, operate the Building's cooling tower and such other equipment and machinery as", "samples": [{"hash": "e5EVpx9mIw4", "uri": "/contracts/e5EVpx9mIw4#cooling-tower", "label": "Lease Agreement (Long Distance Direct Holdings Inc)", "score": 18.0, "published": true}], "hash": "09141b1dd88c032d14159a094bbaa01a", "id": 2}, {"snippet_links": [{"key": "period-of", "type": "definition", "offset": [61, 70]}, {"key": "flow-meter", "type": "definition", "offset": [99, 109]}, {"key": "cooling-mode", "type": "definition", "offset": [134, 146]}, {"key": "pressure-drop", "type": "definition", "offset": [156, 169]}, {"key": "determination-of", "type": "clause", "offset": [368, 384]}], "size": 2, "snippet": "The cooling tower will circulate 1200 gpm for a demonstrated period of 60 minutes as measured by a flow meter with all plant users in cooling mode (minimal pressure drop through system). During this same period, it will demonstrate the capacity to cool water from 95 to 87 F with an ambient WBT of 85 F at full flow. This will be determined by actual measurements and determination of capacity using standard charts.", "samples": [{"hash": "5lYEhxoibH9", "uri": "/contracts/5lYEhxoibH9#cooling-tower", "label": "Engineering, Procurement and Construction Contract", "score": 29.340862423, "published": true}, {"hash": "f4f0CT6ilTX", "uri": "/contracts/f4f0CT6ilTX#cooling-tower", "label": "Engineering, Procurement and Construction Contract (Quaker Chemical Corp)", "score": 19.0, "published": true}], "hash": "352d7ed41fe21a08e6ea8f5b67d02330", "id": 3}, {"snippet_links": [{"key": "supply-and-install", "type": "clause", "offset": [0, 18]}, {"key": "the-production", "type": "clause", "offset": [57, 71]}, {"key": "or-equivalent", "type": "definition", "offset": [135, 148]}, {"key": "flow-meter", "type": "definition", "offset": [171, 181]}], "size": 2, "snippet": "Supply and Install a Cooling Tower (pad mounted) outside the production building. \u2022 Evapco USS-112-312 1200 USGPM from 95F to 85F WBT, or equivalent \u2022 Sump \u2022 Dual pumps \u2022 Flow meter \u2022 Cooling tower should have two fans and two pumps", "samples": [{"hash": "5lYEhxoibH9", "uri": "/contracts/5lYEhxoibH9#cooling-tower", "label": "Engineering, Procurement and Construction Contract", "score": 29.340862423, "published": true}, {"hash": "f4f0CT6ilTX", "uri": "/contracts/f4f0CT6ilTX#cooling-tower", "label": "Engineering, Procurement and Construction Contract (Quaker Chemical Corp)", "score": 19.0, "published": true}], "hash": "1cb00914aab9582be22a9b4df25f3c32", "id": 4}, {"snippet_links": [{"key": "oc-public-works", "type": "clause", "offset": [3, 18]}, {"key": "operation-personnel", "type": "clause", "offset": [30, 49]}, {"key": "determine-the", "type": "clause", "offset": [111, 124]}, {"key": "effectiveness-of-the", "type": "clause", "offset": [125, 145]}, {"key": "to-control", "type": "definition", "offset": [156, 166]}, {"key": "and-equipment", "type": "clause", "offset": [215, 228]}, {"key": "corrosion-protection", "type": "clause", "offset": [229, 249]}, {"key": "total-alkalinity", "type": "definition", "offset": [348, 364]}, {"key": "to-provide", "type": "definition", "offset": [553, 563]}, {"key": "mild-steel", "type": "definition", "offset": [584, 594]}, {"key": "to-the-county", "type": "definition", "offset": [938, 951]}, {"key": "system-control", "type": "clause", "offset": [1004, 1018]}, {"key": "based-on", "type": "clause", "offset": [1027, 1035]}, {"key": "best-practices", "type": "clause", "offset": [1036, 1050]}, {"key": "product-use", "type": "definition", "offset": [1063, 1074]}, {"key": "to-city", "type": "definition", "offset": [1132, 1139]}], "size": 2, "snippet": "i. OC Public Works/Facilities Operation personnel will make a twice weekly check of the cooling tower water to determine the effectiveness of the treatment to control scale, algae, fungi and bacteria free operation and equipment corrosion protection, unless there is an issue which requires more frequent testing. Tests include PH, total hardness, total alkalinity, conductivity, free and total halogen and inhibitor levels.\nii. Equipment and chemical protection against scale and corrosion shall contain all of the following:\na) PBTC/HEDP Phosphonate (to provide anodic and cathodic mild steel corrosion protection)\nb) Benzotriazole or Tolyltriazole (TT or BZT) (to provide copper corrosion protection\nc) High Stress Polymer (to provide calcium, iron and silt control), Polymer shall be non-foaming and non-Ionic\nd) Fluoresced inert and active trace element (to facilitate ease of testing). Product shall not contain any molybdenum (due to the County\u2019s desire for no heavy metal discharge)\niii. Current system control limits (based on best practices and current product use): a) Conductivity: 2,200 to 2,600 mmhos b) Cycles (Tower to City): 4.5 to 6.0", "samples": [{"hash": "hE5BI8Ekzrf", "uri": "/contracts/hE5BI8Ekzrf#cooling-tower", "label": "Contract for Water Treatment Chemicals and Related Services", "score": 33.2096751085, "published": true}], "hash": "3c0b5da7d2d1232bdfdc2616babb39c4", "id": 5}, {"snippet_links": [{"key": "energy-savings-guarantee", "type": "definition", "offset": [33, 57]}], "size": 1, "snippet": "Replacement Center \u2013 there is no energy savings guarantee for this measure.", "samples": [{"hash": "80LOcQNRJOr", "uri": "/contracts/80LOcQNRJOr#cooling-tower", "label": "Energy Savings Performance Contract", "score": 25.8899541992, "published": true}], "hash": "a79ac61abed5b812a95b5ec1e76d382f", "id": 6}, {"snippet_links": [], "size": 1, "snippet": "Oil, grease and clean fan motors and bearings.", "samples": [{"hash": "iqp6vJw2vyF", "uri": "/contracts/iqp6vJw2vyF#cooling-tower", "label": "Service Level Agreement", "score": 24.8726899384, "published": true}], "hash": "9c9414aa122a52715a387ffd6c82605c", "id": 7}, {"snippet_links": [{"key": "seller-will", "type": "clause", "offset": [0, 11]}, {"key": "after-the-closing-date", "type": "clause", "offset": [65, 87]}, {"key": "located-in", "type": "definition", "offset": [107, 117]}, {"key": "corpus-christi-terminal", "type": "definition", "offset": [146, 169]}, {"key": "not-limited", "type": "clause", "offset": [186, 197]}, {"key": "solid-waste-disposal-costs", "type": "clause", "offset": [202, 228]}, {"key": "cleanup-costs", "type": "definition", "offset": [233, 246]}, {"key": "associated-with", "type": "definition", "offset": [247, 262]}, {"key": "demolition-and-removal", "type": "clause", "offset": [267, 289]}, {"key": "access-to-the", "type": "clause", "offset": [319, 332]}, {"key": "conduct-of-the", "type": "clause", "offset": [375, 389]}, {"key": "right-of-entry", "type": "definition", "offset": [421, 435]}, {"key": "section-96", "type": "clause", "offset": [455, 466]}], "size": 1, "snippet": "Seller will, at its expense, demolish and remove, within 90 days after the Closing Date, the cooling tower located in the refinery section of the Corpus Christi terminal, including, but not limited to, solid waste disposal costs and Cleanup costs associated with the demolition and removal. Seller will have a right of access to the Corpus Christi terminal for this purpose. Conduct of the demolition and removal and the right of entry will be subject to Section 9.6.", "samples": [{"hash": "jA8uKx2n5YH", "uri": "/contracts/jA8uKx2n5YH#cooling-tower", "label": "Sale of Assets Agreement (Williams Energy Partners L P)", "score": 18.0, "published": true}], "hash": "d9268c3541e9f832af1d3dcdbab492d1", "id": 8}, {"snippet_links": [{"key": "in-the-event", "type": "clause", "offset": [0, 12]}, {"key": "the-demised-premises", "type": "clause", "offset": [56, 76]}, {"key": "regular-business-hours", "type": "definition", "offset": [101, 123]}, {"key": "landlord-shall", "type": "clause", "offset": [125, 139]}, {"key": "upon-reasonable", "type": "clause", "offset": [141, 156]}, {"key": "advance-notice", "type": "definition", "offset": [157, 171]}, {"key": "the-building", "type": "definition", "offset": [181, 193]}, {"key": "equipment-and-machinery", "type": "definition", "offset": [225, 248]}, {"key": "the-premises", "type": "clause", "offset": [280, 292]}, {"key": "tenant-shall", "type": "clause", "offset": [294, 306]}, {"key": "for-landlord", "type": "clause", "offset": [326, 338]}, {"key": "cost-of", "type": "definition", "offset": [341, 348]}, {"key": "a-\u2587", "type": "clause", "offset": [380, 383]}, {"key": "customary-charge", "type": "definition", "offset": [411, 427]}, {"key": "hvac-equipment", "type": "clause", "offset": [559, 573]}], "size": 1, "snippet": "In the event Tenant conducts business in any portion of the Demised Premises during hours other than regular business hours, Landlord shall, upon reasonable advance notice, operate the Building\u2019s cooling tower and such other equipment and machinery as shall enable Tenant to cool the Premises. Tenant shall reimburse Landlord for Landlord\u2019s cost of such service upon rendition of a \u2587\u2587\u2587\u2587 therefor, at Landlord\u2019s customary charge therefor. Notwithstanding anything herein to the contrary, there shall be no after-hours charge for Tenant using and operating the HVAC equipment which exclusively services the laboratory portion of the Demised Premises.", "samples": [{"hash": "ajymw6FVvAf", "uri": "/contracts/ajymw6FVvAf#cooling-tower", "label": "Lease (Vision Sciences Inc /De/)", "score": 19.0, "published": true}], "hash": "933fc2b1e5bacb369e6258bcf853f3b3", "id": 9}, {"snippet_links": [{"key": "disposal-of", "type": "clause", "offset": [160, 171]}, {"key": "before-december", "type": "clause", "offset": [197, 212]}, {"key": "regional-water-quality-control-board", "type": "definition", "offset": [331, 367]}, {"key": "written-authorization", "type": "definition", "offset": [378, 399]}, {"key": "county-health-department", "type": "definition", "offset": [418, 442]}, {"key": "to-extend", "type": "clause", "offset": [533, 542]}, {"key": "disposal-date", "type": "definition", "offset": [556, 569]}, {"key": "dispose-of", "type": "definition", "offset": [676, 686]}], "size": 1, "snippet": "Basin solids - Piles of solids from cleanout of cooling tower basins were noted at well pads 16-30, 15-32, 18-5, and the containment basin west of OGIH. Proper disposal of these solids is required before December 31, 2002. (Samples have been collected and tested, and authorization to dispose has been received from the California Regional Water Quality Control Board. However, written authorization from the Imperial County Health Department has not yet been received. The California Regional Water Quality Control Board has agreed to extend the required disposal date because of the delay in receiving the written authorization from the Imperial County Health Department to dispose of the wastes.)", "samples": [{"hash": "diQVPPbT2zp", "uri": "/contracts/diQVPPbT2zp#cooling-tower", "label": "Credit Agreement (Ormat Technologies, Inc.)", "score": 19.0, "published": true}], "hash": "8c3473080dccd6ad9945455ada2fdc01", "id": 10}], "next_curs": "ClYSUGoVc35sYXdpbnNpZGVyY29udHJhY3RzcjILEhZDbGF1c2VTbmlwcGV0R3JvdXBfdjU2IhZjb29saW5nLXRvd2VyIzAwMDAwMDBhDKIBAmVuGAAgAA==", "clause": {"children": [["cooling-tower-and-cooling-tower-chemical-treatment-area-auxilliary-equipment", "Cooling Tower and Cooling Tower Chemical Treatment Area Auxilliary Equipment"], ["", ""], ["pick-up-service", "PICK-UP SERVICE"], ["water-treatment-specifications", "WATER TREATMENT SPECIFICATIONS"], ["scope-of-services", "Scope of Services"]], "parents": [["utilities", "Utilities"], ["project-team-and-key-personnel", "Project Team and Key Personnel"], ["water-treatment-specifications", "WATER TREATMENT SPECIFICATIONS"], ["charges-for-services-during-non-regular", "Charges for Services During Non-Regular"], ["background", "Background"]], "title": "Cooling Tower", "size": 26, "id": "cooling-tower", "related": [["hvac", "HVAC", "HVAC"], ["heating", "Heating", "Heating"], ["generators", "Generators", "Generators"], ["walls", "Walls", "Walls"], ["meters", "Meters", "Meters"]], "related_snippets": [], "updated": "2025-07-07T12:36:17+00:00", "also_ask": [], "drafting_tip": null, "explanation": "A Cooling Tower clause outlines the requirements and standards for the installation, operation, and maintenance of cooling towers within a facility or project. It typically specifies technical criteria such as capacity, efficiency, water treatment protocols, and compliance with environmental regulations. For example, it may require regular inspections, water quality monitoring, and adherence to noise or emission limits. The core function of this clause is to ensure that cooling towers operate safely, efficiently, and in accordance with legal and environmental standards, thereby minimizing operational risks and potential liabilities."}, "json": true, "cursor": ""}}