Common use of Construction Change Directives Clause in Contracts

Construction Change Directives. 7.3.1 A Construction Change Directive is written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

Appears in 16 contracts

Samples: Agreement, Agreement, Agreement

AutoNDA by SimpleDocs

Construction Change Directives. 7.3.1 8.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

Appears in 8 contracts

Samples: Agreement (Northern Growers LLC), Owner and Design Builder (Great Plains Ethanol LLC), Terms and Conditions (Aristotle Corp)

Construction Change Directives. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 7 contracts

Samples: School District Facilites and Special, www.fountaininngas.org, Remodeling Agreement

Construction Change Directives. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 6 contracts

Samples: www.boarddocs.com, Form of Agreement (Nu Skin Enterprises Inc), Indemnity Agreement

Construction Change Directives. 7.3.1 A.7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Design-Build Contract, order changes in the Work within the general scope of the Contract Design-Build Documents consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 5 contracts

Samples: cdn.cocodoc.com, www.unlv.edu, www.unlv.edu

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 5 contracts

Samples: Agreement, www.spotsylvania.k12.va.us:443, Agreement (Digex Inc/De)

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 5 contracts

Samples: files.josephlombardo.com, www.gov.bm, www.gov.bm

Construction Change Directives. 7.3.1 (a) A Construction Change Directive is a written order prepared by the Architect Architect/Engineer and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for prior to or in the absence of an agreement on adjustment, if any, in the Contract Sum, or Contract Time, or bothSum and/or Construction Schedule. The Owner may by Construction Change Directive, and without invalidating the Contract, order changes in the Work. A Construction Change Directive to change the Work within will be used when Owner determines that the general scope of change must be implemented before the Contract consisting of additions, deletions or other revisions, parties will be able to agree on a Change Order for the Contract Sum and Contract Time being adjusting accordingly.changed Work;

Appears in 4 contracts

Samples: www.bidnet.com, www.bidnet.com, www.bidnet.com

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 4 contracts

Samples: Agreement (Adicet Bio, Inc.), Immunicon Corp, Empire Resorts Inc

Construction Change Directives. 7.3.1 a. A Construction Change Directive is a written order prepared by the Architect Project Manager and signed by the Owner HISD General Manager and Architectthe Project Manager, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Job Order amount or Contract Timecompletion date, or both. The Owner HISD may by Construction Change Directive, without invalidating the ContractJob Order, order changes in the Work within the general scope of the Contract Job Order consisting of additions, deletions or other revisions, the Contract Sum Job Order amount and Contract Time completion date being adjusting adjusted accordingly.

Appears in 4 contracts

Samples: Master Joc Agreement, Master Joc Agreement, Master Joc Agreement

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect Owner or at the Owner’s election, the Architect, and signed by the Owner and at the Owner’s election, the Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 3 contracts

Samples: resources.finalsite.net, resources.finalsite.net, resources.finalsite.net

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by directed to the Architect Contractor and signed by the Owner and ArchitectEngineer, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 3 contracts

Samples: Trade Contractor Agreement, Trade Contractor Agreement, Trade Contractor Agreement

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner Development Manager and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Cost of the Work or Contract Time, or both. The Owner Development Manager may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time Cost of the Work being adjusting adjusted accordingly.

Appears in 2 contracts

Samples: Agreement (Chukchansi Economic Development Authority), Chukchansi Economic Development Authority

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, /Engineer directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Contact Sum or Contract Time, Time or both. The Owner may may, by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time Times being adjusting adjusted accordingly.

Appears in 2 contracts

Samples: County Services Contract Contract, Recording Stamp Only

Construction Change Directives. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and si Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, or Contract C Time, or both. The Owner may by Construction Change Directive, without invalidating the Contractby the Owner and ct Sum or Contract tract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 2 contracts

Samples: crdact.net, biznet.ct.gov

Construction Change Directives. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect Owner or at the Owner’s election, the Architect, and signed by the Owner and at the Owner’s election, the Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 2 contracts

Samples: resources.finalsite.net, resources.finalsite.net

Construction Change Directives. 7.3.1 9.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

Appears in 2 contracts

Samples: cdn.cocodoc.com, University System

Construction Change Directives. 7.3.1 4.4.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may may, by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 2 contracts

Samples: Agreement, Agreement

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order [prepared by the Architect Architect] directed to the Contractor and signed by the Owner [and Architectarchitect], directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Agreement (Symantec Corp)

Construction Change Directives. 7.3.1 § 8.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Guaranteed Maximum Price or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

Appears in 1 contract

Samples: Agreement (Magenta Therapeutics, Inc.)

Construction Change Directives. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect Engineer and signed by the Owner and ArchitectEngineer, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: mccmeetingspublic.blob.core.usgovcloudapi.net

Construction Change Directives. 45 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: cdn.maricopa.edu

Construction Change Directives. 7.3.1 A Construction Change Directive Directive” is a written order prepared by the Architect and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

Appears in 1 contract

Samples: Lump Sum Construction Agreement

Construction Change Directives. 7.3.1 (a) A Construction Change Directive is a written order prepared by the Architect and signed by the Owner City and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner City may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: brazosbid.cstx.gov

Construction Change Directives. 7.3.1 8.3.1 A "Construction Change Directive Directive" is a written order prepared by the Architect and signed by the Owner Owner, Contractor, and Architect, directing a change in the Project Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may may, by Construction Change Directive, without invalidating the Contract, order changes in the Project Work within the general scope of the Contract consisting of additions, deletions or other revisions, with the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Guaranteed Maximum Price Construction Agreement (Gaylord Entertainment Co /De)

AutoNDA by SimpleDocs

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The If the parties are unable to agree on the terms of a Change Order, Owner may by Construction Change Directive, without invalidating the Contract, Directive order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Architectural Services Agreement

Construction Change Directives. CANNOT BE USED FOR BIDDING. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: bidcondocs.delaware.gov

Construction Change Directives. 7.3.1 (1) A Construction Change Directive is a written order prepared by the Architect Designer and signed by the Owner and ArchitectDesigner, directing a change in the Work Work, and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: core-docs.s3.amazonaws.com

Construction Change Directives. 7.3.1 6.1.1 A Construction Change Directive is a written order prepared by the Architect Architect, after full consultation with and signed and delivered by the Owner and ArchitectAuthority, directing a change in the Work and stating a proposed basis for adjustment, if any, Work. A Construction Change Directive shall be used in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating absence of total agreement on the Contract, order changes in the Work within the general scope terms of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordinglya Change.

Appears in 1 contract

Samples: Design Services Agreement

Construction Change Directives. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect Design Agent and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: www.purchasing.ri.gov

Construction Change Directives. 7.3.1 10.11.3.1. A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Guaranteed Maximum Price or Contract TimeDate of Substantial Completion, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum Guaranteed Maximum Price and Contract Time Date of Substantial Completion being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Professional Services Agreement

Construction Change Directives. § 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Guaranteed Maximum Price or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum or Guaranteed Maximum Price and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: agenda.webbcountytx.gov:8085

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and the Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Guaranteed Maximum Price or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum Guaranteed Maximum Price and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Construction Contract (National Instruments Corp /De/)

Construction Change Directives. 7.3.1 8.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract TimeTarget Completion Date, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

Appears in 1 contract

Samples: Seneca Niagara Falls Gaming Corp

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by 30 Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: procurement.maricopa.edu

Construction Change Directives. 7.3.1 A.7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for prior to agreement on adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Badger State Ethanol LLC

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect Construction Manager and signed by the Owner and ArchitectOwner, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Agreement (Windsor Woodmont Black Hawk Resort Corp)

Construction Change Directives. 7.3.1 A "Construction Change Directive Directive" is a written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Construction Contract (NightHawk Biosciences, Inc.)

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by directed to the Architect Contractor and signed by the Owner XXXX and ArchitectEngineer, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, Sum or Contract Time, or both. The Owner NURA may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, the Contract Sum and Contract Time being adjusting adjusted accordingly.

Appears in 1 contract

Samples: Northglenn Urban Renewal Authority

Construction Change Directives. 7.3.1 A Construction Change Directive is a written order prepared by the Architect and signed by the Owner and Architector Owner, directing a change in the Work prior to agreement and stating a proposed basis for adjustment, if any, in the Contract Sum, Price or Contract Time, time for Substantial Completion or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of this Contract; the Contract consisting Price and time for Substantial Completion being adjusted accordingly. A Construction Change Directive shall be used in the absence of additions, deletions or other revisions, total agreement on the Contract Sum and Contract Time being adjusting accordinglyterms of a Change Order.

Appears in 1 contract

Samples: Subcontract Agreement

Construction Change Directives. 7.3.1 17.11.1 A Construction Change Directive is a written order prepared and issued by the District, the Construction Manager, and/or the Architect and signed by the Owner District and the Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or bothWork. The Owner District may as provided by law, by Construction Change Directive, Directive and without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions deletions, or other revisions, . Any dispute as to the Contract Sum sum of the Construction Change Directive or timing of payment shall be resolved pursuant to the Payment and Contract Time being adjusting accordinglyClaims and Disputes provisions herein.

Appears in 1 contract

Samples: Facilities Lease

Time is Money Join Law Insider Premium to draft better contracts faster.