CONCRETE WORKS Sample Clauses

CONCRETE WORKS. 4.1 Tools and plant: Contractor has to arrange Concrete mixer machine, Vibrator and proper Plywood shuttering to produce good quality of concrete foundation of all external signage works. Other required T&P will have to be provided as per the direction of „DMRC.
AutoNDA by SimpleDocs
CONCRETE WORKS. 1.0 TOP OF CONCRETE TO MATCH RIM OF EXISTING UTILITY COVERS OR HOUSING.NOTIFY TOWNSHIP'S ENGINEERING DEPARTMENT FOR OBVIOUS CHANGE IN GRADE OR CROSS SLOPES.
CONCRETE WORKS. Description This item shall consist of furnishing, placing and finishing concrete in building structures in accordance with this Specification and conforming to the lines, graded, dimension shown on the Plans. Material Requirement Coarse aggregated and fine aggregates shall be well graded and conform with the standard DPWH Specifications. Cement must be stored and protect against dampness and shall conform with the requirements of blended hydraulic cement. No pouring of concrete shall be allowed without the use of concrete vibrator. Water shall be clear and apparently clean. No pouring activity shall be allowed without pouring permits. Use class “A” mixture for all concrete works. At least one (1) set consisiting three (3) Concrete Cylinder Tests Specimens, 150 x 300 (6” x 12”), shall be taken from each 75 cu.m. of each class of concrete or fraction thereof placed each day.
CONCRETE WORKS. 1 : General 1.1
CONCRETE WORKS. 2.1 Supply and cast plain concrete grade 20/20 mm aggregate. m³ 10
CONCRETE WORKS. 1703 MATERIALS FOR CONCRETE This work shall consist of placing selected approved material of 250mm minimum diameter on the foundation put after excavation to receive levelling concrete in accordance with these specifications and in conformity with the lines, grades and cross sections shown on the Drawings as directed by the Engineer.

Related to CONCRETE WORKS

  • Creative Work The Executive agrees that all creative work and work product, including but not limited to all technology, business management tools, processes, software, patents, trademarks, and copyrights developed by the Executive during the term of this Agreement, regardless of when or where such work or work product was produced, constitutes work made for hire, all rights of which are owned by the Employer. The Executive hereby assigns to the Employer all rights, title, and interest, whether by way of copyrights, trade secret, trademark, patent, or otherwise, in all such work or work product, regardless of whether the same is subject to protection by patent, trademark, or copyright laws.

  • Software Development Software designs, prototypes, and all documentation for the final designs developed under this agreement must be made fully transferable upon direction of NSF. NSF may make the software design, prototype, and documentation for the final design available to competitors for review during any anticipated re-competition of the project.

  • Improvement Plans A. A professional improvement plan is a clearly articulated assistance program for a teacher whose student growth measure dimension of the evaluation is below the expected level of student growth. For the purposes of this agreement, improvement plans shall be based on the individual student growth measure level, and not for overall subjects or classes taught.

  • Outside Work All work necessary to the assembling, installation, erection, operation, maintenance, repair, control, in- spection and supervision of all electrical apparatus, devices, wires, cables, supports, insulators, conduc- tors, ducts and raceways when part of distributing systems outside of buildings, railroads and outside the directly related railroad property and yards. In- stalling and maintaining the catenary and trolley work on railroad property, and bonding of rails. All underground ducts and cables when they are in- stalled by and are part of the system of a distrib- uting company, except in power stations during new construction, including ducts and cables to adjacent switch racks or substations. All outdoor substations and electrical connections up to and including the setting of transformers and the connecting of the secondary buses thereto. Outside work to include renewable electrical energy sources such as solar photovoltaic, geothermal, wind, biomass, wave, etc., and other distributed en- ergy installations such as fuel cells, microturbines, etc.

  • Design Development An interim step in the design process. Design Development documents consist of plans, elevations, and other drawings and outline specifications. These documents will fix and illustrate the size and character of the entire project in its essentials as to kinds of materials, type of structure, grade elevations, sidewalks, utilities, roads, parking areas, mechanical and electrical systems, and such other work as may be required.

  • ALTERATIONS & IMPROVEMENTS Tenant shall not make any alterations, additions or improvements or do any type of construction to the Property without first obtaining Landlord's written consent. Unless prior written agreement is reached between Tenant and Landlord, any such alterations, additions, improvements or construction shall become part of the Property and shall remain at the expiration of Tenant's Lease term. If Landlord approves of alterations, additions, improvements or construction in writing and Tenant intends to use contractors to undertake such work, the contractors must first be approved in writing by Landlord. Tenant must also place any funds to cover the amount of any alterations, additions, improvements or construction in an escrow account approved by Landlord before the commencement of the work. Landlord shall designate the times and manner of the work being done, exclusively.

  • Curriculum Development This includes the analysis and coordination of textual materials; constant review of current literature in the field, some of which are selected for the college library collection, the preparation of selective, descriptive materials such as outlines and syllabi; conferring with other faculty and administration on curricular problems; and, the attendance and participation in inter and intra-college conferences and advisory committees.

  • Work Products Grantee shall provide CalRecycle with copies of all final products identified in the Work Plan. Grantee shall also provide CalRecycle with copies of all public education and advertising material produced pursuant to this Agreement. WORKERS’ COMPENSATION/LABOR CODE

  • Employee Workload ‌ The Employer shall ensure that an employee’s workload is not unsafe as a result of employee absence(s). Employees may refer safety related workload concerns to the Occupational Health and Safety Committee for investigation under Article 22.3 (Occupational Health and Safety Committee).

  • Works Contractor must notify the Department or State of Florida of any publications, artwork, or other copyrightable works developed in connection with the Contract. All copyrights created or developed through performance of the Contract are owned solely by the State of Florida.