Common use of CLOSURE TO PREVENT DAMAGE Clause in Contracts

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, in writing, by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor shall protect the work from damage or deterioration.

Appears in 4 contracts

Samples: Sale, www.dnr.wa.gov, www.dnr.wa.gov

AutoNDA by SimpleDocs

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 3 contracts

Samples: State Unless Otherwise Noted, State Unless Otherwise Noted, www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 3 4 inches on jaw run roads. Wheel track rutting exceeds 3 2 inches on crushed rock roads. Wheel track rutting exceeds 6 2 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor shall protect the work from damage or deterioration.

Appears in 3 contracts

Samples: Sale, www.dnr.wa.gov, www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 8 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 2 contracts

Samples: Otherwise Noted, www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 2 contracts

Samples: www.dnr.wa.gov, www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 4 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 2 contracts

Samples: Chamokane Hill Agreement, Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on jaw run, pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Wheel track rutting exceeds 4 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 2 contracts

Samples: www.dnr.wa.gov, Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on jaw run or pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Wheel track rutting exceeds 4 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 2 contracts

Samples: Sale, Monumented Corners

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 2 contracts

Samples: Sale, www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 3 inches on jaw run roads. Wheel track rutting exceeds 3 inches on crushed rock roads. Wheel track rutting exceeds 6 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 2 contracts

Samples: www.dnr.wa.gov, www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220.1 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run ballast roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: State Unless Otherwise Noted

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on jaw run or pit run roads. DRAFT ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Wheel track rutting exceeds 4 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run or pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sadie Hawkins Agreement

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: Wheel track rutting exceeds 3 inches on jaw run roads. Wheel track rutting exceeds 3 inches on crushed rock roads. Wheel track rutting exceeds 6 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations. In the opinion of the Contract Administrator excessive road damage or rutting may occur. DRAFT Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 4 inches on jaw run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, in writing, by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor Purchaser will be required to cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on jaw run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Wheel track rutting exceeds 4 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 4 inches on jaw run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, in writing, by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 8 inches on jaw run ballast roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220.1 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on jaw run and pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Wheel track rutting exceeds 8 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on jaw run roads. • Wheel track rutting exceeds 4 inches on crushed rock roads. • Wheel track rutting exceeds 4 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In • When, in the opinion of the Contract Administrator Administrator, excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will shall suspend road work or hauling right-of-way of right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 4 inches on jaw run/pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 8 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, in writing, by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor Purchaser will be required to cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Unit 8

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on pit run, jaw run or native surface roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

AutoNDA by SimpleDocs

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw and pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 8 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on jaw run, pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Wheel track rutting exceeds 4 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In DRAFT ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 2 inches on jaw pit run roads.  Wheel track rutting exceeds 3 2 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions: DRAFT  Wheel track rutting exceeds 3 6 inches on jaw run or pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run and pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 8 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: State Unless Otherwise Noted

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Grande Agreement

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on pit run roads. ▪ Wheel track rutting exceeds 4 inches on crushed rock roads. ▪ Wheel track rutting exceeds 4 inches on native surface roads. Surface or base stability problems persist. Weather is such that satisfactory results cannot be obtained in an area of operations.  In ▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: All State Unless Otherwise Noted

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run or pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 8 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Hemlock Agreement

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 4 inches on jaw run/pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 4 inches on jaw run roads.  Wheel track rutting exceeds 3 inches on crushed rock roads.  Wheel track rutting exceeds 6 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: www.dnr.wa.gov

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: State Unless Otherwise Noted

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220.1 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run and pit run roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 8 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Unless Otherwise Noted

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 G‐220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way right‐of‐way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run ballast roads.  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Sale

CLOSURE TO PREVENT DAMAGE. In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:  Wheel track rutting exceeds 3 6 inches on jaw run roads. DRAFT  Wheel track rutting exceeds 3 4 inches on crushed rock roads.  Wheel track rutting exceeds 6 4 inches on native surface roads.  Surface or base stability problems persist.  Weather is such that satisfactory results cannot be obtained in an area of operations.  In When, in the opinion of the Contract Administrator excessive road damage or rutting may occur. Operations must stop unless authority to continue working or hauling is granted, granted in writing, writing by the Contract Administrator. In the event that surface or base stability problems persist, the Contractor will be required to Purchaser shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor Purchaser shall protect the work from damage or deterioration.

Appears in 1 contract

Samples: Unit 1