The 'Civil Works' clause defines the scope and responsibilities related to construction activities involving infrastructure, such as earthworks, foundations, roads, and utilities. It typically outlines the standards, materials, and methods to be used, as well as the obligations of the contractor to comply with relevant regulations and project specifications. This clause ensures that all parties are clear on what civil construction tasks are included in the contract, helping to prevent disputes over the extent of work and to allocate responsibility for compliance and quality.
POPULAR SAMPLE Copied 6 times
Civil Works. 1) Major Civil works is excluded from the scope however necessary excavations if required, making, closing of cutouts/Core cuts in the wall/Floor, necessary supports and grouting, drilling etc with finishing the same to match the background in all respect are included in the scope.
Civil Works n1. In general, the scope of the civil works comprises the works of the expansions to be carried out in the existing substation Pariñas, as well as of the new facilities of the Nueva Tumbes substation, such as: earthworks, excavations, equipment foundations, towers, concrete chutes, power cable ducts, drainages, construction of stands, vehicle narrow roads, demolitions, concrete perimetric fence, among others.
Civil Works including, for the System, the construction of entries, digging work for the electrical underground cabling, if any, foundations, enclosures and constructions necessary to house the inverters and transformers, fencing, in accordance with the Executive Project and the Technical Specifications and supplying, on his own initiative and expense, the materials, vehicles or any other component and labour necessary. Construction of all the provisional Works, including those located outside the Area (signage, even luminous, placards, crush barriers aimed at defining or limiting the paths of pedestrians and vehicles, in compliance with the traffic and viability provisions), as well as the preparation of the equipment aimed at guaranteeing, for the entire duration of the Works, in compliance with the provisions on safety and health on the workplace and what is contained and has been prescribed in the PSC. Construction of site offices for the Works Manager and the Design Health and Safety Coordinator. Construction of the utilities required for the supply of water, gas, electricity, drainage into the sewers, as well as the provision of suitable offices for the Design Health and Safety Coordinator. Payment of all the charges for the consumption of water, gas, electricity and drainage into the sewers, as described above. Building of barriers or provisional protection for the Works and wherever the safety provisions require them;
Civil Works. (FINISHING) Item # MRS Ref# Description of Items. Unit Quantity Rate (PKR) Rate Quoted by the Contractor Amount SCHEDULE ITEMS: 1 Ch.4/13 (P.34)
Civil Works. The No Objection Certificate (NOC) for the civil works may be issued subject to the following:
Civil Works. In general, the scope of the civil works comprises all the works to be carried out in the new Iberia Substation and the specific works required for the expansion of the Puerto ▇▇▇▇▇▇▇▇▇ Substation, such as: earthworks, excavations, equipment foundations, towers, concrete chutes, power cable ducts, drainages, construction of stands, vehicle narrow roads, demolitions, perimetric fence made of solid materials (concrete and brick), among others, which includes the substation area plus space for future expansions. o2. The power and control cable chutes and ducts shall be provided with metal supports or shelves that allow classifying the power, control and communication cables separately and in an organized manner.
Civil Works including, for the System, the realization of entries, digging work for the electrical underground cabling, if any, foundations, enclosures and constructions necessary to house the inverters and transformers, fencing, in accordance with the Executive Project and the Technical Specifications and supplying, on his own initiative and expense, the materials, vehicles or any other component and labour necessary. Realisation of all the provisional Works, including those located outside the Area (signage, even luminous, placards, crush barriers aimed at defining or limiting the paths of pedestrians and vehicles, in compliance with the traffic and viability provisions), as well as the preparation of the equipment aimed at guaranteeing, for the entire duration of the Works, in compliance with the provisions on safety and health on the workplace and what is contained and has been prescribed in the PSC. Realisation of site offices for the Works Manager and the Design Health and Safety Coordinator. Realisation of the utilities required for the supply of water, gas, electricity, drainage into the sewers, as well as the provision of suitable offices for the Design Health and Safety Coordinator. Payment of all the charges for the consumption of water, gas, electricity and drainage into the sewers, as described above. Building of barriers or provisional protection for the Works and wherever the safety provisions require them;
Civil Works. CONSTRUCTION OF DISTRIBUTION LINES IN KLOUD - TRIPOLI CAZA VOLUME 3 – TECHNICAL SPECIFICATIONS GENERAL TABLE OF CONTENTS GENERAL TABLE OF CONTENTS PART 2 - CIVIL WORKS 201 EARTHWORKS 202 CONCRETE WORKS 203 (NOT USED) 204 (NOT USED) 205 (NOT USED) 206 (NOT USED) 207 (NOT USED) 208 (NOT USED) 209 (NOT USED) 210 (NOT USED) 211 (NOT USED) 212 (NOT USED) 213 (NOT USED) 214 (NOT USED) 215 (NOT USED) 216 (NOT USED) 217 PIPELINES & PIPEWORKS ▇▇▇ ▇▇▇▇ WORKS 219 (NOT USED) 220 (NOT USED) RY/486-02PG03E 201 EARTHWORKS 1
Civil Works i. The Main Contractor shall complete the Lift shaft and pit to the required dimensions including plastering and painting. Hoist way / openings and the Machine room of required sizes shall be made available by the Main Contractor for erection of equipment’s well before its receipt at site. The Main Contractor shall be responsible for water proofing of the lift pit. The Main Contractor shall also complete lift machine room/closed required hoist way with lockable doors and windows in all respects including lighting. All other civil activities for Lift installation shall be within the scope of the Lift Contractor and shall fall within the Lift Contractor’s responsibility. ii. All minor Civil works are under Lift Contractor’s responsibility that include Cutting, Chasing and making good of the same at all levels, conceal the conduits and boxes for Panels. etc. The minor Civil work shall also include items connected with fixing of Sill plate / Sill slab projection, fixing of buffer springs in the lift, fixing and mounting beams, bearing plate etc. at the Lift Machine room.
Civil Works. Item # MRS Ref# Description of Items. Unit Quantity Rate Quoted by the Contractor Amount (PKR) GENERATOR PAD AND TRANSFORMER TOWER. SCHEDULE ITEMS: EX- 01 Ch.3/21 (a-ii) (P.30)