Choke Manifold Pressure Gauge Sample Clauses

Choke Manifold Pressure Gauge. Quantity: no. 2 Make/type: Houston Digital Instruments (Mounted on manifold) Pressure range: psi - psi 0 - 16,000psi Quantity: no. 2 Make/type: Electroflow Pressure range: psi - psi 0 - 16,000psi Quantity: no. 2 Make/type: HDI (mounted on manifold) Pressure range: psi - psi 0 -15,000psi
AutoNDA by SimpleDocs
Choke Manifold Pressure Gauge. Make/type HDI Type 2400 Pressure range (maximum): psi 15,000psi H.3.1 and H.3.2 combined on one panel: yes/no Yes Visible from choke operation position: yes/no Yes H.4 STANDPIPE PRESSURE GAUGE HDI already shown on H.3.1 & H.1.2 Make/type: HDI 2400 Pressure range: psi 10,000psi Visible from Driller’s position: yes/no Yes
Choke Manifold Pressure Gauge. Make/type Pressure range (maximum) psi H.3.1 and H.3.2 combined on one panel: Yes/No Visible from choke operation position: Yes/No
Choke Manifold Pressure Gauge. Quantity: no. 4 Make/type: NOV-Hitec with transmitter Pressure range: psi - psi 0 – 20,000 Quantity: no. 4 Make/type: NOV/Pressure Gauge Pressure range: psi - psi 0 – 20,000
Choke Manifold Pressure Gauge. Make/type R.B. Pipetech Pressure range (maximum) psi 10,000 and 15,000 (fine scale)

Related to Choke Manifold Pressure Gauge

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Signaling Link Transport 9.2.1 Signaling Link Transport is a set of two or four dedicated 56 kbps transmission paths between Global Connection-designated Signaling Points of Interconnection that provide appropriate physical diversity.

  • DELIVERY PRESSURE Xxxxxx agrees to use due care and diligence to furnish gas hereunder at such uniform pressure as Seller may elect up to, but not exceeding 20 pounds per square inch gauge, and not less than 5 pounds per square inch gauge, at the "Point of Delivery". Buyer shall be responsible for the installation and operation of adequate safety equipment downstream of the Point of Delivery so as to relieve or control pressure variations within the limits described above that may, for any reason through malfunction of Seller's equipment or otherwise, occur on Buyer's side of the "Delivery Point".

  • Receipt Points The Points of Receipt are listed in Appendix 2.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Natural Gas 21.1 Subject to Article 21.2, the Indian domestic market shall have the first call on the utilisation of Natural Gas discovered and produced from the Contract Area. Accordingly, any proposal by the Contractor relating to Discovery and production of Natural Gas from the Contract Area shall be made in the context of the Government's policy for the utilisation of Natural Gas and shall take into account the objectives of the Government to develop its resources in the most efficient manner and to promote conservation measures.

  • Smoke Detectors At Owner's expense, smoke detectors will be installed on the Property in working condition in accordance with the law prior to the tenant's occupancy. During the occupancy, it shall be the tenant's responsibility to maintain all smoke detectors. Owner will replace smoke detector equipment as needed.

  • Wet Weather In the event of wet weather, work in the open will continue until the particular work in hand can no longer be done safely and efficiently. Whilst it is raining, employees will be required to: Continue to work under cover or relocate to alternative work under cover, on site. Obtain materials and services for employees working under cover where there is only minimal exposure to inclement weather. When required, perform emergency and safety work. In addition, work on unexpected breakdowns, which can be corrected in limited time duration. Should a portion of the project be affected by wet weather, all other employees not so affected shall continue working in accordance with award conditions, regardless that some employees may be entitled to cease work due to wet weather. If a halt to productive work occurs due to inclement weather, the parties agree that employees may be relocated to other unaffected sites. Where the above steps are not possible, affected employees may be required to attend tool box meetings, work planning sessions or skills development activities, all of which will count as productive time for payment purposes.

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

Time is Money Join Law Insider Premium to draft better contracts faster.