CHESAPEAKE BAY CRITICAL AREA Sample Clauses

CHESAPEAKE BAY CRITICAL AREA. If all or a portion of a Property is located within 1,000 feet of tidal waters of the Chesapeake Bay, there may be restrictions on the use and/or development of the Property. Additional information regarding the Chesapeake Bay Critical Areas is available from the Critical Areas Program established by the local government of each county in Maryland and Baltimore City.
AutoNDA by SimpleDocs

Related to CHESAPEAKE BAY CRITICAL AREA

  • Low Census Low census is defined as a decline in patient care requirements resulting in a temporary staff decrease. During periods of low census, the Employer will assign low census to nurses in the following order:

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • SERVICE LEVEL DESCRIPTION The Fund Accounting Agreement is hereby amended by deleting the Service Level Description attached thereto and replacing it in its entirety with the Service Level Description attached hereto.

  • Power Factor Design Criteria Developer shall design the Large Generating Facility to maintain an effective power delivery at demonstrated maximum net capability at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all generators in the New York Control Area on a comparable basis. The Developer shall design and maintain the plant auxiliary systems to operate safely throughout the entire real and reactive power design range. The Connecting Transmission Owner shall not unreasonably restrict or condition the reactive power production or absorption of the Large Generating Facility in accordance with Good Utility Practice.

  • Project Description In two or three brief sentences, provide a concise description of your exhibition. Include the subject matter, type of objects to be included (paintings, sculpture, manuscripts, etc.), those responsible for organizing the exhibition, and catalogue author(s).

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Service Areas The MCP agrees to provide services to Aged, Blind or Disabled (ABD) members, Modified Adjusted Gross Income (MAGI) members, and Adult Extension members residing in the following service area(s): Central/Southeast Region ☒ Northeast Region ☒ West Region ☒ The ABD and MAGI categories of assistance are described in OAC rule 5160-26-02. The Adult Extension category is defined in Ohio’s Medicaid State Plan as authorized by the Centers for Medicare and Medicaid Services (CMS). The MCP shall serve all counties in any region they agree to serve.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Service Area (a) SORACOM shall provide the SORACOM Air Global Service within the area designated on the web site of SORACOM (the “Service Area”), provided, that, the Service Area may be different if stated otherwise as specified by SORACOM separately. However, within the Service Area, you may not use the SORACOM Air Global Service in places where transmissions are difficult to send or receive.

  • Use of Basement and Service Areas The basement(s) and service areas, if any, as located within the (project name), shall be earmarked for purposes such as parking spaces and services including but not limited to electric sub-station, transformer, DG set rooms, underground water tanks, pump rooms, maintenance and service rooms, fire fighting pumps and equipment's etc. and other permitted uses as per sanctioned plans. The Allottee shall not be permitted to use the services areas and the basements in any manner whatsoever, other than those earmarked as parking spaces, and the same shall be reserved for use by the association of allottees formed by the Allottees for rendering maintenance services.

Time is Money Join Law Insider Premium to draft better contracts faster.