Charge for Low Voltage Power. 3.1 Customers measured by demand/hour The charge of power in low voltage level includes the following:
AutoNDA by SimpleDocs

Related to Charge for Low Voltage Power

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall operate within a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA in order to maintain a specified voltage schedule, if the Interconnection System Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standard can be met by using, for example, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors, or a combination of the two, if agreed to by the Participating TO and CAISO. The Interconnection Customer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the Interconnection System Impact Study shows this to be required for system safety or reliability.

  • Electrical Power CUSTOMER acknowledges that the Services will not function in the absence of electrical power.

  • Reactive Power 1.8.1 The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range established by the Connecting Transmission Owner on a comparable basis, until NYISO has established different requirements that apply to all similarly situated generators in the New York Control Area on a comparable basis.

  • Reactive Power and Primary Frequency Response 9.6.1 Power Factor Design Criteria

  • Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.

  • Single Point of Contact The Contractor must provide, at the request of the Authorized User, a Single Point of Contact (SPOC) regardless of the breadth of the services being provided. The Contractor is required to provide the name and contact telephone numbers (desk, cell phone etc.) of the SPOC. RETAINAGE The Authorized User may retain a percentage of each deliverable payment of no more than twenty-five (25) percent until the acceptance of the complete Implementation. This retainage may be reduced up to 5 percent as described in the SOW, when the Contractor substantially reduces the time required from the timeframes negotiated between the Authorized User and the Contractor. ENHANCEMENTS TO SERVICES When the right is reserved in the RFQ, unanticipated enhancements to the services procured not exceeding a cumulative twenty (20) percent of the Implementation Service cost may be agreed to by the Authorized User. Such inclusion must be included in the Total Cost Evaluation. Such unanticipated enhancements will require a written Authorized User Agreement revision, which for NYS Agency Authorized Users will include an amended Purchase Order. Any changes that will result in exceeding this twenty (20) percent will require a new competitive RFQ. Contractor shall notify the Authorized User in writing when a requested scope change will exceed the cumulative twenty (20) percent total value of the Implementation Services.

  • Variance Power All funds established at the Foundation are subject to the Foundation’s “variance power”, required by Treasury Regulations for the Foundation and its donors to enjoy the more favorable income tax treatment of a community foundation as opposed to the less favorable income tax treatment of a private foundation. Treasury Regulations Section 170A-9(e)(11)(v)(B)(1) specifically states that the governing body of a community foundation must have the power “to modify any restriction or condition on the distributions of funds for any specified charitable purpose or to specified organizations if, in the sole judgment of the governing body (without the necessity of approval by any participating trustee, custodian or agent), such restriction becomes, in effect, unnecessary, incapable of fulfillment, or inconsistent with the charitable needs of the community or area served”.

  • Cost Responsibility for Interconnection Facilities and Distribution Upgrades 4.1 Interconnection Facilities 4.2 Distribution Upgrades

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where EveryCall has requested an Unbundled Loop and BellSouth uses Integrated Digital Loop Carrier (IDLC) systems to provide the local service to the end user and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to EveryCall. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for EveryCall (e.g. hairpinning):

  • Two-Way Interconnection Trunks 2.4.1 Where the Parties have agreed to use Two-Way Interconnection Trunks for the exchange of traffic between Verizon and ICG, ICG shall order from Verizon, and Verizon shall provide, the Two-Way Interconnection Trunks, and the Entrance Facility on which such Trunks will ride, and transport and multiplexing, in accordance with the rates, terms and conditions set forth in this Agreement and Verizon’s applicable Tariffs.

Time is Money Join Law Insider Premium to draft better contracts faster.