Cageless Physical Collocation Installation Intervals Sample Clauses

The "Cageless Physical Collocation Installation Intervals" clause defines the timeframes within which a service provider must complete the installation of network equipment in a cageless collocation arrangement. In this context, cageless collocation refers to the placement of a customer's equipment in a shared space, rather than in a locked, dedicated cage, within a telecommunications facility. The clause typically outlines specific deadlines for installation steps, such as site preparation and equipment activation, and may address procedures if these intervals are not met. Its core function is to ensure timely deployment of services and provide clear expectations for both parties, thereby minimizing delays and disputes related to installation timelines.
Cageless Physical Collocation Installation Intervals. 8.2.2.1 Dedicated space for Cageless Physical Collocation is not reserved until the quotation is accepted by the Collocator. 8.2.2.2 Where space suitable for Central Office equipment (Active Central Office Space) is available and the request includes DC power capacity greater than fifty (50) amps (2-50 amp feeds), AT&T-13STATE will deliver Cageless Physical Collocation within ninety (90) calendar days from the completion of the application process (when the Collocator has remitted a signed confirmation form along with a check for fifty-percent (50%) of all applicable non-recurring charges).
Cageless Physical Collocation Installation Intervals. 8.2.2.1 Dedicated space for Cageless Physical Collocation is not reserved until the quotation is accepted by the Collocator. 8.2.2.2 Where space suitable for Central Office equipment (Active Central Office Space) is available and the request includes DC power capacity greater than fifty (50) amps (2-50 amp feeds), AT&T-13STATE will deliver Cageless Physical Collocation within ninety (90) calendar days from the completion of the application process (when the Collocator has remitted a signed confirmation form along with a check for fifty-percent (50%) of all applicable non-recurring charges). 8.2.2.2.1 A shorter interval may apply where Collocator installs all of its own bays (See Section 21 below). If the available space is not suitable for Central Office equipment (Inactive Space) and must be converted to Active Collocation Space, thirty (30) calendar days will be added to the provisioning interval to allow for the conversion process to be completed. If there are additional problems with the space, AT&T-13STATE shall meet the provisioning interval requirements in the waiver granted by the FCC unless the state has different provisions. 8.2.2.2.2 The cageless collocation construction interval ends when roughed in, unterminated DC power and interconnection cabling is provided to the Collocator’s collocation area. 8.2.2.3 Any material revision to a completed application will be treated as a new application following revision guidelines set forth in Section 8.1.6.