Cables and connectors Sample Clauses

Cables and connectors. All cables and connectors for used for installation of solar field must be of solar grade which can withstand harsh environment conditions for 25 years from the SCOD of the project and voltages as per latest IEC standards. (Note: IEC Standard for DC cables for PV systems is under development. It is recommended that in the interim, the Cables of 600- 1800 Volts DC for outdoor installations should comply with the EN50618/ TUV 2pfg 1169/08/07 or equivalent IS for service life expectancy of 25 years).
AutoNDA by SimpleDocs
Cables and connectors. The assembly will include all necessary connectors and cables running between the top of the camera pole and the associated equipment cabinet. The conductor sizes and cable types shall be appropriate for the length of the cable runs. Power and signal cables shall be supplied by the contractor to the manufacturer who shall pre- wire them to the lowering device in the factory. MEASUREMENT AND PAYMENT - Each 00 - c01700 ITEM 9000-0011 - CCTV CAMERA ATTACHMENT TO EXISTING TRAFFIC SIGNAL STRUCTURE Addendum: Associated Item(s): 9000-0011 Header: ITEM 9000-0011 - CCTV CAMERA ATTACHMENT TO EXISTING TRAFFIC SIGNAL STRUCTURE Provision Body: DESCRIPTION - This work is the installation of a Closed Circuit Television (CCTV) Camera on the traffic signal structure locations as indicated on the drawings and specified herein. MATERIAL - In accordance with Section 948.2 and as follows: Steel Pipe - ASTM A 53, Grade B

Related to Cables and connectors

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Assembly (1)(a) The Contracting Parties shall have an Assembly.

  • Switching All of the negotiated rates, terms and conditions set forth in this Section pertain to the provision of local and tandem switching.

  • Staging In addition to the staging categories listed in paragraph 1 of Annex 2-A, this Schedule contains staging categories 20-A, 20-B, PR-1 and PR-130:

  • Crossing Picket Lines The Company will not expect an employee to cross a picket line, including a picket line at a customer site, if to do so would place the employee's life, limb or personal property in jeopardy.

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Developer and Connecting Transmission Owner agree to report to each other in writing as soon as practical all accidents or occurrences resulting in injuries to any person, including death, and any property damage arising out of this Agreement.

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Fueling delivering or dispensing fuel, defueling and refueling, or any other transfer of fuel on Airport property.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins.

Time is Money Join Law Insider Premium to draft better contracts faster.