Cable. MFN is required to provide proper cabling, based on circuit type (VF, DS0, xDSL, DS1, DS3, etc.) to ensure adequate shielding. GTE cable standards (which are set forth on Addendum B to the CSP) are required to reduce the possibility of interference. MFN is responsible for providing fire retardant riser cable that meets GTE standards. GTE is responsible for placing MFN's fire retardant riser cable from the cable vault to the partitioned space. GTE is responsible for installing MFN provided fiber optic cable in the cable space or conduit from the manhole to the wire center or access tandem. This may be shared conduit with dedicated inner duct. GTE will wire DS1 services in multiples of 28 or DS0 cable facilities in sufficient capacity for GTE to wire DS0 services in multiples of 24. MFN shall be required to provide DS1 cable facilities to support MFN equipment installed to its capacity. If MFN provides its own fiber optic facility, then MFN shall be responsible for bringing its fiber optic cable to the wire center or access tandem manhole and leave sufficient cable length for GTE to be able to fully extend such cable through to MFN's space. Due to physical and technical constraints, removal of cable will be at GTE's option. GTE will make every effort to contact MFN in the event MFN's equipment disrupts the network. If GTE is unable to make contact with MFN, GTE shall temporarily disconnect MFN's service, as provided in Section 4.7. GTE will notify MFN as soon as possible after any disconnects of MFN's equipment. 4.3.4.1 GTE recognizes MFN’s desire for the placement of high count fiber optic entrance cables (432 fibers) into MFN’s collocation arrangements. The Parties desire to avoid multiple fiber optic cable installations into the cable vault and to MFN’s collocation arrangement. Provided there is sufficient duct space entering GTE’s premises and sufficient duct and cable rack structure within GTE’s premises, GTE will allow the placement of 432 count fiber optic cable between the manhole and MFN’s collocation arrangement.
Appears in 1 contract
Sources: Collocation Agreement
Cable. MFN NEN is required to provide proper cabling, based on circuit type (VF, DS0, xDSL, DS1, DS3, etc.) to ensure adequate shielding. GTE cable standards (which are set forth on Addendum B to the CSP) are required to reduce the possibility of interference. MFN NEN is responsible for providing fire retardant riser cable that meets GTE standards. GTE is responsible for placing MFN▇▇▇'s fire retardant riser cable from the cable vault to the partitioned space. GTE is responsible for installing MFN NEN provided fiber optic cable in the cable space or conduit from the manhole to the wire center or access tandem. This may be shared conduit with dedicated inner duct. GTE will wire DS1 services in multiples of 28 or DS0 cable facilities in sufficient capacity for GTE to wire DS0 services in multiples of 24. MFN NEN shall be required to provide DS1 cable facilities to support MFN NEN equipment installed to its capacity. If MFN NEN provides its own fiber optic facility, then MFN NEN shall be responsible for bringing its fiber optic cable to the wire center or access tandem manhole and leave sufficient cable length for GTE to be able to fully extend such cable through to MFNNEN's space. Due to physical and technical constraints, removal of unused cable will be at GTE's option. GTE will make every effort to contact MFN NEN in the event MFN▇▇▇'s equipment disrupts the network. If GTE is unable to make contact with MFNNEN, GTE shall temporarily disconnect MFNNEN's service, as provided in Section 4.7. GTE will notify MFN as soon as possible after any disconnects of MFN's equipment.
4.3.4.1 GTE recognizes MFN’s desire for the placement of high count fiber optic entrance cables (432 fibers) into MFN’s collocation arrangements. The Parties desire to avoid multiple fiber optic cable installations into the cable vault and to MFN’s collocation arrangement. Provided there is sufficient duct space entering GTE’s premises and sufficient duct and cable rack structure within GTE’s premises, GTE will allow the placement of 432 count fiber optic cable between the manhole and MFN’s collocation arrangement.Section
Appears in 1 contract
Sources: Collocation Agreement