Common use of Bridge Locations Clause in Contracts

Bridge Locations. Engineer shall include an 8 ½ inch x 11 inch copy of the bridge location map with the bridge location highlighted in each bridge inspection folder. Engineer shall verify that the GPS coordinates in the database are accurate (i.e., located on the bridge). If the coordinates are missing or not accurate, Engineer shall collect new coordinates using a hand held GPS unit and provide coordinates in a decimal format. Sub-meter, differentially corrected data is not required. Engineer shall notify the TxDOT District Bridge Inspection Coordinator of missing maps and needed corrections. Engineer is not required to electronically update bridge location maps.

Appears in 11 contracts

Samples: sb20pca.txdot.gov, sb20pca.txdot.gov, sb20pca.txdot.gov

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.