Boring, Trenching, Backfilling and Compacting Contractor Sample Clauses

Boring, Trenching, Backfilling and Compacting Contractor shall furnish all labor, materials, tools, equipment and services for the boring, excavation, trenching, stringing, backfilling and compacting for the pipeline and associated facilities. Boring shall be by directional drilling methods. Trenches shall be excavated by open cut method to the depth required to accommodate the work and DOT code. The Contractor shall verify the location of all utilities prior to excavation and shall comply with local rules and regulations governing the respective utilities. Trenches shall be kept free of water. Backfill shall begin as soon as practical after lowering in the pipe. No large clods of dirt or other material that will cause voids in the trench backfill shall be allowed in the trench. -------------------------------------------------------------------------------- TENASKA GEORGIA PARTNERS, L.P. Appendix A - Scope Technical Requirements & Specifications ---------------------- Attachment II -------------------------------------------------------------------------------- NATURAL GAS PIPELINE Page 3 of 8 ---------------------- Date: 9/3/99 -------------------------------------------------------------------------------- Backfill shall be free of rock cobbles, roots, sod or other organic matter and frozen material to prevent damage to the coated pipe. The Contractor shall be responsible for any damage to the pipe or pipe coating caused during or by the backfilling operation. The backfill shall be mounded 8" - 12" above the ditch ground level. All excess soil shall be spread over the right-of-way and smooth graded as necessary.
AutoNDA by SimpleDocs

Related to Boring, Trenching, Backfilling and Compacting Contractor

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Scope of Interconnection Service 1.3.1 The NYISO will provide Energy Resource Interconnection Service to Interconnection Customer at the Point of Interconnection.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • Blasting Blasting shall be permitted only for road construction purposes unless advance permission is obtained from Forest Service. Whenever the Industrial Fire Precaution Level is II or greater, a fire security person equipped with a long handled round point No. 0 or larger shovel and a 5 gallon backpack pump can filled with water, will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service, in areas of high rate of spread and resistance to control. Fuses shall not be used for blasting. Explosive cords shall not be used without permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.

  • Network Interconnection Architecture Each Party will plan, design, construct and maintain the facilities within their respective systems as are necessary and proper for the provision of traffic covered by this Agreement. These facilities include but are not limited to, a sufficient number of trunks to the point of interconnection with the tandem company, and sufficient interoffice and interexchange facilities and trunks between its own central offices to adequately handle traffic between all central offices within the service areas at P.01 grade of service or better. The provisioning and engineering of such services and facilities will comply with generally accepted industry methods and practices, and will observe the rules and regulations of the lawfully established tariffs applicable to the services provided.

  • Screening 3.13.1 Refuse containers located outside the building shall be fully screened from adjacent properties and from streets by means of opaque fencing or masonry walls with suitable landscaping.

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Trunk Group Architecture and Traffic Routing The Parties shall jointly engineer and configure Local/IntraLATA Trunks over the physical Interconnection arrangements as follows:

  • Quality Management Grantee will:

Time is Money Join Law Insider Premium to draft better contracts faster.