Battery Charging Clause Samples
Battery Charging. During the charging process, batteries generate heat and vent gasses, and must never be charged inside a sealed unit. Because the Micro 800 Meter is a sealed unit, we do not allow charging in situ. Batteries must be removed and charged with a suitable battery charger outside the Meter. We recommend the use of one of the Energizer range of NiMH chargers.
Battery Charging. It is the students responsibility to ensure that their laptops are plugged into the charging station at the end of the day so that they have a fully charged laptop each day. Students who fail to do this will not be given a supplemental laptop and this may cause them to fall behind on classroom assignments.
Battery Charging. Digital devices must be brought to school each day in a fully charged condition. It is the students responsibility to charge the device each night.
Battery Charging. Starting 24 VDC battery charger shall be selected and supplied by the engine- generator set manufacturer. Battery chargers to be provided as follows:
a. Fully automatic with manually adjustable voltage and equalize timer.
b. Phase: Single.
c. Hz: 50/60. d. 120//240 VAC, 13AAC. e. 24 VDC, 25 ADC. May 2017 C01025C17 LOW EMISSION DIESEL ENGINE STANDBY Georgetown Wet Weather Treatment Station 11083 - 14 GENERATOR SET 150 KW AND LARGER
Battery Charging. One (1) battery charging areas will be constructed, located at the North/West Corner of the building. Area to receive masonry partition to screen exterior glazed building corner. Electrical distribution to a 400amp panel and 200amp sub-panel. Tenant to provide additional Electrical Distribution from Landlord provided Electrical Panels. Area’s floor to be coated with epoxy paint, One (1) manual eyewash station, and One (1) Acid Neutralization basin with drain. Ventilation for this area to be provided per code requirements. Fire sprinkler heads will be a semi-recessed chrome pendant, centered in the acoustical ceiling for the office area. All work to be done in accordance with State and local codes and NFPA standards. Existing Warehouse System to be unchanged unless noted.
