Backing Tracks Sample Clauses

Backing Tracks. Where the BBC wishes to use a backing track it will determine whether the record company had, for recordings made prior to 1st June 2011, cleared backing track rights, by checking the position with the MU or the record company. If the BBC is advised that such backing track rights are not cleared, the BBC and the MU will liaise to agree a rate in good faith for such clearance.
AutoNDA by SimpleDocs
Backing Tracks. 12.4.1 No payment shall be due from Producer where the rights to backing track usage in television programmes have been acquired under the MU’s agreement with BPI or XXXX, respectively. Recordings made under the terms of MU’s agreement with BPI (operative from 1st June 2011) will automatically be cleared for backing track use and substitution for use by the original artist.
Backing Tracks. 8.1 Where rights to backing track usage in Works have been obtained pursuant to the agreement between MU and BPI or XXXX, no Fees or Performance Fees shall be payable by Producer. Recordings made under the terms of MU’s agreement with BPI dated 1st January 2011 will be automatically cleared for backing track use and substitution for use by the original artist.
Backing Tracks. 1 Table or hercules laptop stand for laptop and audio interface (Depending on availability) MICROPHONE CHAN INSTRUMENT OPTION 1 OPTION 2 STAND 4. INPUT LIST 1 Conga 1 Telefunken M80 Shure SM 57 Boom Stand 2 Conga 2 Telefunken M80 Shure SM 57 Boom Stand 3 Alegre Telefunken M80 Shure SM 57 Boom Stand 4 Djembe Telefunken M80 Shure SM 57 Boom Stand 5, 6 Overheads Xxxxxxx KM184 - Boom Stand 7 Bass DI Whirlwind JT Radial J48 DI 8,9 Yamaha Montage 1 Whirlwind JT Radial J48 DI 10,11 Nord Stage 3 Whirlwind JT Radial J48 DI 12 Accordion DPA 4099 with Accordion Clip with Wireless System Shure Beta 98 Clip On with Wireless System Clip On 13 Main Vocal Capsule Sennheiser e935 Capsule Sennheiser e845 Boom Stand 15 Backing Vocal Percussion Sennheiser e835 Shure SM58 Boom Stand 16 Backing Vocal Bass Sennheiser e835 Shure SM58 Boom Stand 17 Backing Vocal Piano Sennheiser e835 Shure SM58 Boom Stand 18 PERCUSSION Talkback Sennheiser e835 Shure SM58 Boom Stand 19,20,21 BACKING TRACKS Whirlwind JT Radial J48 DI

Related to Backing Tracks

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

  • Crossing Picket Lines The Company will not expect an employee to cross a picket line, including a picket line at a customer site, if to do so would place the employee's life, limb or personal property in jeopardy.

  • Television Equipment Recycling Program If this Contract is for the purchase or lease of covered television equipment, then Contractor certifies that it is compliance with Subchapter Z, Chapter 361 of the Texas Health and Safety Code related to the Television Equipment Recycling Program.

  • Modification of the Small Generating Facility The Interconnection Customer must receive written authorization from the NYISO and Connecting Transmission Owner before making any change to the Small Generating Facility that may have a material impact on the safety or reliability of the New York State Transmission System or the Distribution System. Such authorization shall not be unreasonably withheld. Modifications shall be done in accordance with Good Utility Practice. If the Interconnection Customer makes such modification without the prior written authorization of the NYISO and Connecting Transmission Owner, the Connecting Transmission Owner shall have the right to temporarily disconnect the Small Generating Facility. If disconnected, the Small Generating Facility will not be reconnected until the unauthorized modifications are authorized or removed.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.

  • Provisioning Line Splitting and Splitter Space 3.8.1 The Data LEC, Voice CLEC or BellSouth may provide the splitter. When EZ Phone or its authorized agent owns the splitter, Line Splitting requires the following: a non-designed analog Loop from the serving wire center to the NID at the End User’s location; a collocation cross connection connecting the Loop to the collocation space; a second collocation cross connection from the collocation space connected to a voice port; the high frequency spectrum line activation, and a splitter. The Loop and port cannot be a Loop and port combination (i.e. UNE-P), but must be individual stand-alone Network Elements. When BellSouth owns the splitter, Line Splitting requires the following: a non designed analog Loop from the serving wire center to the NID at the End User’s location with CFA and splitter port assignments, and a collocation cross connection from the collocation space connected to a voice port.

  • Synchronous Generation The Interconnection Customer shall design its Small Generating Facility to maintain a composite power delivery at continuous rated power output at the Point of Interconnection at a power factor within the range of 0.95 leading to 0.95 lagging, unless the NYISO or the Transmission Owner in whose Transmission District the Small Generating Facility interconnects has established different requirements that apply to all similarly situated generators in the New York Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice.

  • Local Control Center, Metering and Telemetry The NTO shall operate, pursuant to ISO Tariffs, ISO Procedures, Reliability Rules and all other applicable reliability rules, standards and criteria on a twenty-four (24) hour basis, a suitable local control center(s) with all equipment and facilities reasonably required for the ISO to exercise ISO Operational Control over NTO Transmission Facilities Under ISO Operational Control, and for the NTO to fulfill its responsibilities under this Agreement. Operation of the NYS Power System is a cooperative effort coordinated by the ISO control center in conjunction with local control centers and will require the exchange of all reasonably necessary information. The NTO shall provide the ISO with Supervisory Control and Data Acquisition (“SCADA”) information on facilities listed in Appendices A-1 and A-2 herein as well as on generation and merchant transmission resources interconnected to the NTO’s transmission facilities pursuant to the ISO OATT. The NTO shall provide metering data for its transmission facilities to the ISO, unless other parties are authorized by the appropriate regulatory authority to provide metering data. The NTO shall collect and submit to the ISO billing quality metering data and any other information for its transmission facilities required by the ISO for billing purposes. The NTO shall provide to the ISO the telemetry and other operating data from generation and merchant transmission resources interconnected to its transmission facilities that the ISO requires for the operation of the NYS Power System. The NTO will establish and maintain a strict code of conduct to prevent such information from reaching any unauthorized person or entity.

  • Procedures for Providing NP Through Full NXX Code Migration Where a Party has activated an entire NXX for a single Customer, or activated at least eighty percent (80%) of an NXX for a single Customer, with the remaining numbers in that NXX either reserved for future use by that Customer or otherwise unused, if such Customer chooses to receive Telephone Exchange Service from the other Party, the first Party shall cooperate with the second Party to have the entire NXX reassigned in the LERG (and associated industry databases, routing tables, etc.) to an End Office operated by the second Party. Such transfer will be accomplished with appropriate coordination between the Parties and subject to appropriate industry lead times for movements of NXXs from one switch to another. Neither Party shall charge the other in connection with this coordinated transfer.

Time is Money Join Law Insider Premium to draft better contracts faster.