ATTACHMENT FACILITIES AND SYSTEM UPGRADE FACILITIES. 1. Attachment Facilities:
AutoNDA by SimpleDocs
ATTACHMENT FACILITIES AND SYSTEM UPGRADE FACILITIES. 1. Reliability Project Overview The Reliability Project consists of a 345kV transmission line from the 345 kV Ramapo Facility and ultimately terminating at the Rock Tavern substation, owned by Central Xxxxxx Gas & Electric Corp. The interconnection details at Rock Tavern and Sugarloaf are part of separate Interconnection Agreements. The portion of the Reliability Project which is addressed by this Agreement is the Developer’s Transmission Project which shall be relocated from its present interconnection point at the 138kV Ramapo Facility and moved to the 345 kV Ramapo Facility. In addition, and as detailed below, System Upgrade Facilities at the Sugarloaf Substation will be needed to be constructed in order to permit the Developer to step down the voltage from 345kV to 138kV.
ATTACHMENT FACILITIES AND SYSTEM UPGRADE FACILITIES. 1. Reliability Project Overview The Reliability Project consists of the a 345kV transmission line from the 345kV Ramapo Substation and terminating at the Rock Tavern substation, owned by Central Xxxxxx. The Reliability Project requires certain modifications at the 138kV Ramapo Substation, the 345kV Ramapo Substation, and the 345kV Rock Tavern Substation. In addition, System Upgrade Facilities at the Sugarloaf Substation will need to be constructed in order to permit the voltages to be transformed from 345kV to 138kV.3 Finally, the 345kV transmission line will be interconnected to the Rock Tavern Substation4.
ATTACHMENT FACILITIES AND SYSTEM UPGRADE FACILITIES. The Generating Facility and all of the identified Attachment Facilities have been constructed and funded. The Generating Facility has been interconnected with the transmission system and operation since 1986, no new interconnection facilities or system upgrades are required to interconnect the Generating Facility to the New York State Transmission System.

Related to ATTACHMENT FACILITIES AND SYSTEM UPGRADE FACILITIES

  • System Upgrade Facilities Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • System Upgrade Facilities and System Deliverability Upgrades Connecting Transmission Owner shall design, procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Appendix A hereto. The responsibility of the Developer for costs related to System Upgrade Facilities and System Deliverability Upgrades shall be determined in accordance with the provisions of Attachment S to the NYISO OATT.

  • Developer Attachment Facilities Developer shall design, procure, construct, install, own and/or control the Developer Attachment Facilities described in Appendix A hereto, at its sole expense.

  • Verizon OSS Facilities Any gateways, interfaces, databases, facilities, equipment, software, or systems, used by Verizon to provide Verizon OSS Services to CBB.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • Existing Facilities Each of the Existing Facilities shall be repaid in full and terminated and all collateral security therefor shall be released, and the Administrative Agent shall have received pay-off letters in form and substance satisfactory to it evidencing such repayment, termination and release.

  • Interconnection Facilities 4.1.1 The Interconnection Customer shall pay for the cost of the Interconnection Facilities itemized in Attachment 2 of this Agreement. The NYISO, in consultation with the Connecting Transmission Owner, shall provide a best estimate cost, including overheads, for the purchase and construction of its Interconnection Facilities and provide a detailed itemization of such costs. Costs associated with Interconnection Facilities may be shared with other entities that may benefit from such facilities by agreement of the Interconnection Customer, such other entities, the NYISO, and the Connecting Transmission Owner.

  • System Protection Facilities The Interconnection Customer shall, at its expense, install, operate and maintain System Protection Facilities as a part of the Large Generating Facility or the Interconnection Customer’s Interconnection Facilities. The Participating TO shall install at the Interconnection Customer's expense any System Protection Facilities that may be required on the Participating TO’s Interconnection Facilities or the Participating TO’s Transmission System as a result of the interconnection of the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities.

  • Developer’s Attachment Facilities (“DAF”). Developer shall, at its expense, design, procure, construct, own and install the DAF, as set forth in Appendix A hereto.

  • Generating Facility The Interconnection Customer’s device for the production of electricity identified in the Interconnection Request, but shall not include the Interconnection Customer’s Interconnection Facilities.