AT INSTALLATION Clause Samples
AT INSTALLATION. 8.1.1. User shall install the pipeline within the Property and clear of any other underground installation by open cut construction, horizontal drilling or boring methods, except under highways, and in full conformance with any other specifications detailed in any applicable Permit attached hereto as Exhibit C. User shall install the pipeline under highways and other surface obstructions using horizontal drilling or boring methods. All installation shall be in accordance with Exhibits A, B, C and D.
8.1.2. If applicable, and upon ODOT approval, User shall install fence openings for points of access and install temporary gates with locks to protect the Property, right-of-way, construction area, and its materials and equipment.
8.1.3. As applicable, and at all times, User shall comply with all the requirements of the Ohio Manual on Uniform Traffic Control Devices and ODOT’s Utility Manual.
