Approved Construction Drawings Sample Clauses

Approved Construction Drawings. The Construction Drawings for the Tenant Improvements shall be approved by Landlord (the “Approved Construction Drawings”) prior to the commencement of construction, not including early demolition plans and permits to release the start of demolition of the Tenant Improvements. Tenant shall, at its sole cost and expense, cause to be obtained all applicable building permits required in connection with the construction of the Tenant Improvements (“Permits”). Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any Permits or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate at no cost to Landlord with Tenant in performing ministerial acts reasonably necessary to enable Tenant to obtain any such Permits or certificate of occupancy. No changes, modifications or alterations in the Approved Construction Drawings may be made without the prior written consent of Landlord pursuant to the terms of Section 3.5 below.
AutoNDA by SimpleDocs
Approved Construction Drawings. Landlord and Tenant acknowledge that they have approved the final architectural and engineering working drawings for the Tenant Improvement Work described in the drawings, prepared by TEF Architecture and dated November 7, 2018 (the “Approved Construction Drawings”).
Approved Construction Drawings. The Construction Drawings for the Tenant Improvements shall be approved by Landlord (the “Approved Construction Drawings”) prior to the commencement of construction of the Tenant Improvements. In the event that Tenant shall submit the Construction Drawings to Landlord in more than one stage, Landlord shall be entitled to approve a stage and to subsequently disapprove of such stage, provided that a problem is found to exist which is evident only following Landlord’s review of subsequent drawings. Upon receipt of Landlord’s approval, Tenant shall submit the Approved Construction Drawings to the appropriate municipal authorities for all applicable building permits required in connection with the construction of the Tenant Improvements (“Permits”). Tenant shall be responsible for obtaining all such Permits; provided, however, Tenant shall coordinate with Landlord in order to allow Landlord, at its option, to take part in all phases of the permitting process. Tenant shall supply Landlord, as soon as possible, with all plan check numbers and dates of submittal. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any Permits or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in performing ministerial acts reasonably necessary to enable Tenant to obtain any such Permits or certificate of occupancy. No material changes, modifications or alterations in the Approved Construction Drawings may be made without the prior written consent of Landlord pursuant to the terms of Section 3.5 below. Tenant shall pursue its Permits with all due diligence.
Approved Construction Drawings. Promptly following the execution of this Lease, Landlord shall cause Architect to prepare a fully coordinated set of architectural, structural, mechanical, electrical and plumbing working drawings in a form which is complete to allow subcontractors to bid on the work and to obtain all applicable permits, including all engineering construction documents and specifications relating to the structural, mechanical, electrical, plumbing, HVAC, lifesafety, and sprinkler work in the Premises (the “Construction Documents”), which Construction Documents shall be a natural evolution of the Preliminary Drawings. All Construction Documents shall comply with reasonable industry standard drawing formats and specifications, and shall be subject to Tenant’s reasonable approval. Landlord shall be responsible for ensuring (x) that all elements of the design of the Approved Construction Drawings comply with applicable law, and (y) that no Tenant Improvement impairs any system or structural component of the Building. Tenant shall be responsible for ensuring that the Approved Construction Drawings are suitable for Tenant’s use of the Premises. The Construction Documents, as finally approved by Landlord and Tenant, shall be referred to herein as the “Approved Construction Drawings”).
Approved Construction Drawings. The Final Construction Drawings with the changes required by Landlord pursuant to Section 3.2 above, if any, (the “Approved Construction Drawings”) shall be submitted by Tenant to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord's consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant's sole responsibility; provided, however, that Landlord shall cooperate, at no cost to Landlord, with Tenant in executing permit applications and performing other ministerial acts necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications, or alterations in the Approved Construction Drawings may be made without the prior written consent of Landlord, which consent shall not be unreasonably withheld, conditioned, or delayed.
Approved Construction Drawings. The Construction Drawings shall be approved by Landlord (the "APPROVED CONSTRUCTION DRAWINGS") prior to the commencement of construction of the Premises by Tenant in one or more stages (but at a minimum on a floor-by-floor basis). In the event that Tenant shall submit the Construction Drawings to Landlord in more than one stage, Landlord shall be entitled to approve a stage and to subsequently disapprove of such stage, provided that a Design Problem is found to exist which is evident only following Landlord's review of subsequent drawings and was not reasonably ascertainable prior to that time. Tenant shall cause to be obtained all applicable building permits required in EXHIBIT D -8- connection with the construction of the Tenant Improvements ("PERMITS"); provided, however, that Tenant shall be entitled to pull permits for construction on a floor-by-floor basis. Tenant hereby agrees that neither Landlord nor Landlord's consultants shall be responsible for obtaining any Permits or certificate of occupancy for the Premises and that obtaining the same shall be Tenant's responsibility; provided, however, that Landlord shall cooperate with Tenant in performing ministerial acts reasonably necessary to enable Tenant to obtain any such Permits or certificate of occupancy.
Approved Construction Drawings. Subject to performance of Landlord’s obligations under this Work Letter, Tenant shall cause to be obtained all applicable building and other permits (collectively “Permits”) required in connection with the construction or installation of the Tenant Improvements. After approval by Landlord of the Construction Drawings, Tenant shall submit such Approved Construction Drawings for the Permits. Tenant hereby acknowledges and agrees that: (i) neither Landlord nor Landlord’s Consultants shall be responsible for obtaining any Permits, approvals or certificates of occupancy for the Premises and (ii) Tenant shall be responsible for obtaining any and all required Permits, approvals and certificates of occupancy for the Premises; provided, however, that Landlord (x) at its cost, shall prepare and provide to Tenant such path-of-travel documentation regarding the Building and the Project as may be required in order for Tenant to apply for and/or obtain any building permit(s) for the Improvements or required permission for lawful occupancy of the Premises, and (y) Landlord shall reasonably cooperate with Tenant (at no cost to Landlord) in the performance of ministerial acts that are reasonably necessary to enable Tenant to obtain any such Permits, approvals or certificates of occupancy for the Premises. No material changes, modifications or alterations in or to any set of Approved Construction Drawings shall be made by Tenant without the prior written consent of Landlord.
AutoNDA by SimpleDocs
Approved Construction Drawings 

Related to Approved Construction Drawings

  • Selection of Architect/Construction Drawings Tenant shall retain the architect/space planner (the “Architect”) approved by Landlord, which approval shall not be unreasonably withheld, to prepare the Construction Drawings. Tenant shall retain the engineering consultants designated by Landlord (the “Engineers”) to prepare all plans and engineering working drawings relating to the structural, mechanical, electrical, plumbing, HVAC, lifesafety, and sprinkler work in the Premises. The plans and drawings to be prepared by Architect and the Engineers hereunder shall be known collectively as the “Construction Drawings.” All Construction Drawings shall comply with the drawing format and specifications reasonably determined by Landlord, and shall be subject to Landlord’s approval. Tenant and Architect shall verify, in the field, the dimensions and conditions as shown on the relevant portions of the base building plans, and Tenant and Architect shall be solely responsible for the same, and Landlord shall have no responsibility in connection therewith. Landlord’s review of the Construction Drawings as set forth in this Section 3, shall be for its sole purpose and shall not imply Landlord’s review of the same, or obligate Landlord to review the same, for quality, design, Code compliance or other like matters. Accordingly, notwithstanding that any Construction Drawings are reviewed by Landlord or its space planner, architect, engineers and consultants, and notwithstanding any advice or assistance which may be rendered to Tenant by Landlord or Landlord’s space planner, architect, engineers, and consultants, Landlord shall have no liability whatsoever in connection therewith and shall not be responsible for any omissions or errors contained in the Construction Drawings.

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Project Construction The Contractor agrees to provide continuous on-site supervision on each Job Order, while progress on the project is being accomplished. The Contractor’s Project Manager will ensure:

  • Approved Working Drawings The Final Working Drawings shall be approved by Landlord (the “Approved Working Drawings”) prior to the commencement of construction of the Premises by Tenant. After approval by Landlord of the Final Working Drawings, Tenant may submit the same to the appropriate municipal authorities for all applicable building permits. Tenant hereby agrees that neither Landlord nor Landlord’s consultants shall be responsible for obtaining any building permit or certificate of occupancy for the Premises and that obtaining the same shall be Tenant’s responsibility; provided, however, that Landlord shall cooperate with Tenant in executing permit applications and performing other ministerial acts reasonably necessary to enable Tenant to obtain any such permit or certificate of occupancy. No changes, modifications or alterations in the Approved Working Drawings may be made without the prior written consent of Landlord, which consent may not be unreasonably withheld.

  • Interconnection Facilities Engineering Procurement and Construction Interconnection Facilities, Network Upgrades, and Distribution Upgrades shall be studied, designed, and constructed pursuant to Good Utility Practice. Such studies, design and construction shall be based on the assumed accuracy and completeness of all technical information received by the Participating TO and the CAISO from the Interconnection Customer associated with interconnecting the Large Generating Facility.

  • ADDITIONAL CONSTRUCTIONS The Promoter undertakes that it has no right to make additions or to put up additional structure(s) anywhere in the Project after the building plan has been approved by the competent authority(ies) except for as provided in the Act.

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents.

  • Construction, Etc Each covenant contained herein shall be construed (absent express provision to the contrary) as being independent of each other covenant contained herein, so that compliance with any one covenant shall not (absent such an express contrary provision) be deemed to excuse compliance with any other covenant. Where any provision herein refers to action to be taken by any Person, or which such Person is prohibited from taking, such provision shall be applicable whether such action is taken directly or indirectly by such Person. For the avoidance of doubt, all Schedules and Exhibits attached to this Agreement shall be deemed to be a part hereof.

  • Construction Methods No four course of brick-work, with three joints, shall exceed in height, when built, one inch more than the same bricks piles upon one another without mortar. The bricks are to be well soaked in water before use on works, in proper through so as to be thoroughly wet when layed. The Cessation of the bubbles through the water is an irldication of saturation being complete. For ensuring thorough soaking of the bricks every one or two bricklayers or more as necessary, shall be provided with tubs for use The wall of structures shall be carried up regularly in all cases 1` when the nature of the work will admit of it not leaving any part 915mm (3 feet) lower than another. Horizontal courses shalI be straight, level and even and faces of walls smooth and plumb. A straight edge and a plumb- xxx shall be used for constant checking during progress of the work. No brick-bats shall be permitted to be used except when necessary for obtaining the dimension of the different course or for obtaining the specified bond. All unfinished work must be raked back in course unless otherwise directed arid when new work is to be jointed to it the surface of unfinished work must be cleaned and wetted. The bricks shall be laid by placing sufficient mortar on the wall and forcing every brick into it in such a manner as to completely fill every joint with moratar whether at the bottom, side or end of the brick. The mortar to be used shall be that specified for the relevant schedule items and shall comply with the specification for the mortar specified. The bound used shall be English and shall be carried throughout the work. At all angles forming the junction of any two walls, the bricks shall, at each alternate course be carried into each of the respective walls, so as to thoroughly unite the work. V'Jhen the faces are to be plastered, the joints shall be well raked out before any plaster is laid on should the plaster from want of proper joint ranking detach and 7 fall off from the brick work, the contractor shall strip off the plaster bodily to the extent ordered by Superintending Engineer and shall re-do the work properly at his own expense. All requisite scaffolding shall be provided at the contractor's expense and shall be double i.e., must it have two sets of upright supports Care must be taken to ensure the safety of the work people and the contractor must comply with such instructions as the Superintending Engineer may issue to ensure such safety. The contractor will be entirely responsible for any damage or injuries to person or property resulting from ill-erected scaffolding, defective ladders, or otherwise arising out of his default in this respect. The brick work for the retaining wall shall proceed side by side with the depositing and compacting of earth between the retaining walls. At no time shall the brick-work be constructed more than 405mm (1'-4") above Y the compacted earth. In the retaining wall weep-holes shall be provided at suitable intervals as instructed during execution, with the inner surface of the weep-holed plastered 20mm (3/4") thick in cement mortar 1:4 crouched rock of grades in different layer shall be provided at the inner end of the weep-holes to prevent the choking of the weep-holes to have full drainage. No extra payment will be made for this and no deductions will be made for this in the brick-work.