AIRCRAFT MODEL Sample Clauses

AIRCRAFT MODEL. APPLICABILITY The guarantees contained in this Attachment (the [****]) are applicable to the [****]
AutoNDA by SimpleDocs
AIRCRAFT MODEL. APPLICABILITY The guarantees contained in this Attachment (the “Performance Guarantees”) are applicable to the 787-10X Aircraft with a maximum takeoff weight of *** pounds, a maximum landing weight of ***pounds, and a maximum zero fuel weight of ***pounds, and equipped with Boeing furnished Trent 1000-***engines.
AIRCRAFT MODEL. APPLICABILITY The guarantees contained in this Attachment (the "Performance Guarantees") are applicable to the 747-400 Freighter Aircraft with a maximum takeoff weight of 875,000 pounds, a maximum landing weight of 652,000 pounds, and a maximum zero fuel weight of 610,000 pounds, and equipped with Boeing furnished CF6-80C2B1F engines.
AIRCRAFT MODEL. Fuel Provided -------------- ------------- 737 1,000 747 4,000 757 1,600 767 2,000 777 3,000
AIRCRAFT MODEL. APPLICABILITY The guarantees contained in this Attachment (the "Performance Guarantees") are applicable to the 737-700 Aircraft with winglets and a maximum takeoff weight of[CONFIDENTIAL PORTION OMITTED AND FILED SEPARATELY WITH THE COMMISSION PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT] kilograms, a maximum landing weight of [CONFIDENTIAL PORTION OMITTED AND FILED SEPARATELY WITH THE COMMISSION PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT] kilograms, and a maximum zero fuel weight of [CONFIDENTIAL PORTION OMITTED AND FILED SEPARATELY WITH THE COMMISSION PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT] kilograms, and equipped with Boeing furnished CFM56-7B22 engines.
AIRCRAFT MODEL. TERM AND FEE Lessee agrees to utilize the hangar space at in accordance with the terms and fees below: START DATE: END DATE: (DD/MM/YY) (DD/MM/YY) Fee Category: □ Category 1Category 2Category 3 (In accordance with the rate schedule identified in section 2) □ I have read and agree to all terms identified in this agreement (1 through 15)
AIRCRAFT MODEL. APPLICABILITY The guarantees contained in this Attachment (the "Performance Guarantees") are applicable to [CONFIDENTIAL PORTION OMITTED AND FILED SEPARATELY WITH THE COMMISSION PURSUANT TO A REQUEST FOR CONFIDENTIAL TREATMENT].
AutoNDA by SimpleDocs
AIRCRAFT MODEL. 737 *** 747 *** 757 *** 767 *** 777 *** 787 ***
AIRCRAFT MODEL. APPLICABILITY The guarantees contained in this Attachment (the [*CTR]) are applicable to the [*CTR]

Related to AIRCRAFT MODEL

  • AIRCRAFT CONFIGURATION The guarantees defined in Paragraphs 2 and 3 below (the “Guarantees”) are applicable to the A321 Aircraft as described in the A321 Standard Specification ***** as amended by the following SCNs:

  • Aircraft Basic Price The Aircraft Basic Price is listed in Table 1 and is subject to escalation in accordance with the terms of this Purchase Agreement.

  • Aircraft This peril includes self-propelled missiles and spacecraft.

  • Aircraft Maintenance Operator shall, at its own expense, cause the Aircraft to be inspected, maintained, serviced, repaired, overhauled, and tested in accordance with FAR Part 91 so that the Aircraft will remain in good operating condition and in a condition consistent with its airworthiness certification and shall take such requirements into account in scheduling the Aircraft hereunder, including but not limited compliance with applicable airworthiness directives and service bulletins. Performance of maintenance, preventive maintenance or inspection shall not be delayed or postponed for the purpose of scheduling the Aircraft unless such maintenance or inspection can safely be conducted at a later time in compliance with applicable laws, regulations and requirements, and such delay or postponement is consistent with the sound discretion of the pilot-in-command. In the event that any non-standard maintenance is required during the term and will interfere with User’s requested or scheduled flights, Operator, or Operator’s pilot-in-command, shall notify User of the maintenance required, the effect on the ability to comply with User’s requested or scheduled flights and the manner in which the parties will proceed with the performance of such maintenance and conduct of such flight(s). In no event shall Operator be liable to User or any other person for loss, injury or damage occasioned by the delay or failure to furnish the Aircraft under this Agreement, whether or not maintenance-related.

  • BOEING PROPRIETARY Attachment D to Letter Agreement No. 6-1162- SKC-974 ***

  • Use of Aircraft ‌ Employees shall not be required to use an aircraft in the course of their duties other than those of regular commercial airlines, licensed charters, or government aircraft.

  • Lease of Aircraft Lessor agrees to lease the Aircraft to Lessee pursuant to the provisions of FAR Section 91.501(b)(6) and Section 91.501(c)(1) and this Agreement, and to provide a fully-qualified and credentialed flight crew for all flights to be conducted hereunder during the Term (as defined in Section 13) hereof. The parties acknowledge and agree that this Agreement did not result in any way from any direct or indirect advertising, holding out or soliciting on the part of Lessor or any person purportedly acting on behalf of Lessor. Lessor and Lessee intend that the lease of the Aircraft effected by this Agreement shall be treated as a “wet lease” pursuant to which Lessor provides transportation services to Lessee in accordance with FAR Section 91.501(b)(6) and Section 91.501(c)(1).

  • Equipment Specifications All equipment must meet the contract specifications and all federal and State safety codes and regulations in effect at the date of manufacture. All equipment must be Original Equipment Manufacturer (OEM) equipment unless otherwise stated in the contract. Items Offered as New. All products, materials, supplies, replacement parts, and equipment offered and furnished must be new, of current manufacturer production, and must have been formally announced by the manufacturer as being commercially available, unless otherwise stated in this Contract.

  • Return of Aircraft 64 23.1 Date of Return................................................64 23.2

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

Time is Money Join Law Insider Premium to draft better contracts faster.