A positive test Sample Clauses

A positive test is a dischargeable offense unless the Union and the Employer expressly agree to a lesser penalty. Any such agreement will not be precedent setting.

Related to A positive test

  • Positive Test Results In the event an employee tests positive for drug use, the employee will be provided, in writing, notice of their right to explain the test results. The employee may indicate any relevant circumstance, including over the counter or prescription medication taken within the last thirty (30) days, or any other information relevant to the reliability of, or explanation for, a positive test result.

  • CONSEQUENCES OF POSITIVE TEST RESULTS For post-Accident or reasonable suspicion, a Covered Employee shall be immediately removed from performing his or her job or, in the alternative, may be temporarily reassigned to work that is not safety-sensitive if such work is available. The Covered Employee shall be subject to disciplinary action, and shall meet with the SAPC, as set forth in Exhibit A, and section 10 below, if the Covered Employee: 1. Is confirmed to have tested positive for alcohol or drugs; 2. Refuses to Submit to testing; or 3. Has submitted a specimen that the testing laboratory report is an Adulterated or Substituted Specimen. a. If the Union disagrees with the proposed disciplinary action, it may use the grievance procedure as set forth in the parties’ MOU, provided, however, that such a grievance must be initiated at the Employee Relations Director step, unless the parties otherwise mutually agree. b. All proposed disciplinary actions imposed because of a positive drug/alcohol test(s) shall be administered pursuant to the disciplinary matrix set forth in Exhibit A. Subject to good cause, the City may impose discipline for conduct in addition to the discipline for a positive drug/alcohol test. The positive test may be a factor in determining good cause for such additional discipline. c. In the event the City proposes disciplinary action, the notice of the proposed discipline shall contain copies of all laboratory reports and any other supporting documentation upon which the City is relying to support the proposed discipline.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is a NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASPP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram, , the English Language Proficiency Assessments for California (“ELPAC”), and as appropriate to the student, and mandated by LEA pursuant to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. ▇▇▇ shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by ▇▇▇.

  • Follow-up Testing An employee shall submit to unscheduled follow-up drug and/or alcohol testing if, within the previous 24-month period, the employee voluntarily disclosed drug or alcohol problems, entered into or completed a rehabilitation program for drug or alcohol abuse, failed or refused a preappointment drug test, or was disciplined for violating the provisions of this Agreement and Employer work rules. The Employer may require an employee who is subject to follow-up testing to submit to no more than six unscheduled drug or alcohol tests within any 12 month period.