100% Cost Estimate Sample Clauses

100% Cost Estimate. The CONSULTANT will address AIRPORT comments from the 90% review and advance the Cost Estimate to the 100% complete stage. The CONSULTANT will provide hard copies of the final Plans, Specifications, and Cost Estimate to the AIRPORT. The CONSULTANT will upload the plans and specifications to Builder’s Exchange of Washington, for distribution to Contractors. Deliverables: 100% Construction Plans (11” X 17”) Ten (10) printed copies, PDF, and AutoCAD 100% Contract Documents Ten (10) printed copies and PDF 100% Engineer’s Estimate Three (3) printed copies and PDF City of Arlington – Arlington Municipal Airport Runway 11/29 Rehabilitation
AutoNDA by SimpleDocs
100% Cost Estimate. The Consultant will utilize the 100% construction plans to develop final quantities for individual construction items and will then prepared an estimate of probable construction cost utilizing current unit prices based on FDOT and Escambia County recent (last 12 months) bid data, as available. A 5% Contingency will be utilized. At this point the estimate of probable costs should be within budget tolerance.

Related to 100% Cost Estimate

  • Cost Estimate An estimate of the total project cost including but not limited to direct expenses, indirect expenses, land cost, and capital expenses.

  • Construction Cost Estimate At 50% completion of the contract documents, the design team will present and submit copies of the project plans and manual. The Construction Administrator will prepare and issue the fourth of five construction cost estimates. The estimate shall be derived from actual takeoffs, subcontractor and vendor input, and material and labor cost data. All quantitative systems information shall be provided in detail.

  • Cost Estimates If this Agreement pertains to the design of a public works project, CONSULTANT shall submit estimates of probable construction costs at each phase of design submittal. If the total estimated construction cost at any submittal exceeds ten percent (10%) of CITY’s stated construction budget, CONSULTANT shall make recommendations to CITY for aligning the PROJECT design with the budget, incorporate CITY approved recommendations, and revise the design to meet the Project budget, at no additional cost to CITY.

  • Cost Estimating The Model may be used to develop cost estimates based on the approximate data provided and conceptual estimating techniques (e.g., volume and quantity of elements or type of system selected).

  • Preliminary Cost Estimate Consulting Engineer/Architect shall furnish City an estimate of probable Construction Cost based on the preliminary design. Consulting Engineer/Architect's estimate of probable Construction Cost is to be made on the basis of Consulting Engineer/Architect's experience and qualifications and represent Consulting Engineer/Architect's best judgment as an experienced and qualified design professional, familiar with the construction industry.

  • Preliminary Cost Estimates The Engineer shall develop a preliminary cost estimate using the Average Low Bid Unit Price. The Engineer shall estimate the total project cost including preliminary engineering, final engineering, right-of-way (ROW) acquisition, environmental compliance and mitigation, construction, utility relocation, and construction engineering inspection (CEI).

  • Estimated Cost Estimated costs by construction phases for Specified Roads listed in A7 are stated by segments in the Schedule of Items. Such estimated costs are subject to adjustment under B3.3, B5.2, B5.21, B5.212, B5.25, and B5.26. Appropriately adjusted costs shall be made a part of a revised Schedule of Items and shown as adjustments to Timber Sale Account. The revised Schedule of Items shall supersede any prior Schedule of Items when it is dated and signed by Contracting Officer and a copy is furnished to Purchaser.

  • Volume Estimate The estimated volumes of timber by species designated for cutting under B2.3 and expected to be cut under Utilization Standards are listed in A2. If Sale Area Map indicates that there are incom- pletely Marked subdivisions, the objective of Forest Ser- vice shall be to designate for cutting in such subdivisions sufficient timber so that Sale Area shall yield the ap- proximate estimated volume by species or species groups stated in A2. However, the estimated volumes stated in A2 are not to be construed as guarantees or limitations of the timber volumes to be designated for cut- ting under the terms of this contract. Volume adjustments shall not be made under this Section after there is modification for Catastrophic Dam- age under B8.32.

  • Operating Costs The Assuming Institution agrees, during its period of use of any Leased Data Management Equipment, to pay to the Receiver or to appropriate third parties at the direction of the Receiver all operating costs with respect thereto and to comply with all relevant terms of any existing Leased Data Management Equipment leases entered into by the Failed Bank, including without limitation the timely payment of all rent, taxes, fees, charges, maintenance, utilities, insurance and assessments.

  • Estimate The Engineer shall independently develop and report quantities necessary to construct the contract in standard State bid format at the specified milestones and Final PS&E submittals. The Engineer shall prepare each construction cost estimates using Estimator or any approved method. The estimate shall be provided at each milestone submittal or in DCIS format at the 95% and Final PS&E submittals per State’s District requirement.