Examples of Total Construction Cost in a sentence
Prepare a preliminary Estimate of Probable Total Construction Cost (defined as the total anticipated cost of the construction contract to be let to a prime contractor) based upon the programming phase services performed, review initial budget estimates existing by applying unit costs and other standard cost data to space and facilities requirements.
Prepare an Estimate of Probable Total Construction Cost and duration of the Project based on the schematic layouts, sketches and conceptual design criteria.
Based on the information contained in the Design Development documents, Architect shall prepare a detailed Estimate of Probable Total Construction Cost and duration of the Project, coordinated with the Master Schedule and (as applicable) Milestone Schedule.
Business Category Participation Percentage Goal – Percentage of Total Construction Cost for the Project LBE 12% MBE 6% WBE 4% It is the intent of the UG to give preference to the utilization of LBEs so long as all other factors relating to the award of an individual contract are equal.
Upon completion of the District’s separate, parallel Estimate of Probable Total Construction Cost, coordinate with District’s estimating consultant to reconcile any differences between Architect’s Estimate of Probable Total Construction Cost and District’s.