Period for the Project definition

Period for the Project. The period for the carrying out of the Project, being the period between the Date for Commencement and the Date for Completion.

Examples of Period for the Project in a sentence

  • The Parties do hereby undertake to be jointly and severally responsible for all obligations and liabilities relating to the Project and in accordance with the terms of the RFP and the Concession Agreement, till Concession Period for the Project under and in accordance with the Concession Agreement.

  • The Parties do hereby undertake to be jointly and severally responsible for all obligations and liabilities relating to the Project and in accordance with the terms of the RFP and the Agreement, till the Agreement Period for the Project is achieved under and in accordance with the Agreement.

  • This JBA shall be effective from the date hereof and shall continue in full force and effect until the Concession Period for the Project under and in accordance with the concession Agreement in case the Project is awarded to the Consortium.

  • This JBA shall be effective from the date hereof and shall continue in full force and effect until the Concession Period for the Project under and in accordance with the Concession Agreement in case the Project is awarded to the Consortium.

  • The Applicant must demonstrate the financial ability to develop and complete the Project and the financial viability of operating the Project throughout the Compliance Period for the Project.

  • Any signage must remain in place during the Operational Period for the Project as specified in Item A.4. Signage for the Activity may be paid from the Budget if approved by Us. Signage for any other part of the Project must be at the Recipient’s own cost.

  • The Applicant must identify (a) all sources of income for the Project projected over the Compliance Period, including without limitation all rental income from the residential units in the Project, income from any commercial or non-residential space, rental assistance and operating subsidies (such as operating subsidy from tax increment financing), and the amount, terms and conditions of such income, and (b) all costs of operating the Project projected over the Compliance Period for the Project.

  • The ERA-EDTA Council will normally meet twice during the annual ERA-EDTA Congresses.

  • Pilot Financing Instruments and Modalities: Proposed Extension of Pilot Period for the Project Design Facility with Modifications.

  • The second party is responsible for all obligations and liabilities relating to the Project and in accordance with the terms of the e-NIT and the Agreement, till the Agreement Period for the Project is achieved under and in accordance with the Agreement.

Related to Period for the Project

  • Cost of the Project means and embraces the cost of construction; the cost of all

  • Scope of the Project shall have the meaning set forth in Clause 2.1;

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Point of compliance means the location(s) at the source(s) of contamination or at the location(s) between the source(s) and the point(s) of exposure where concentrations of chemicals of concern must meet applicable risk-based screening levels at Tier 1 or other target level(s) at Tier 2 or Tier 3.

  • The Project means supply, installation, testing and commissioning, integration of computer hardware and services with support under Warranty and annual maintenance contract, if required for the contract period.

  • Respective Part of the Project means, for the Recipient and for any Project Implementing Entity, the part of the Project specified in the Legal Agreements to be carried out by it.

  • Period of Maintenance means the specified period of maintenance from the date of completion of the works, as certified by the Engineer.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • PJM Region Peak Load Forecast means the peak load forecast used by the Office of the Interconnection in determining the PJM Region Reliability Requirement, and shall be determined on both a preliminary and final basis as set forth in Tariff, Attachment DD, section 5.

  • Repeat compliance period means any subsequent compliance period after the initial compliance period.

  • Date of commencement of the project means the date of the agreement.

  • Annual Statement of Compliance As defined in Section 3.13.

  • Project Year means the 12 month period beginning from the Effective Date and ending 12 months thereafter and each successive 12 month period following thereafter;

  • Initial compliance period means the first full three-year compliance period which begins at least 18 months after promulgation, except for the following contaminants: Dichloromethane; 1,2,4-Trichlorobenzene; 1,1,2- Trichloroethane; Benzo[a]pyrene; Dalapon; Di(2-ethylhexyl adipate; Di(2-ethylhexyl) phthalate; Dinoseb; Diquat; Endothall; Endrin; Glyphosate; Hexachlorobenzene; Hexachlorocyclopentadiene; Oxamyl (Vydate); Picloram; Simazine; 2,3,7,8-TCDD (Dioxin); Antimony; Beryllium; Cyanide; Nickel; and Thallium, initial compliance period means the first full three-year compliance period after promulgation for systems with 150 or more service connections (January 1993 -December 1995) and first full three-year compliance period after the effective date of regulation (January 1996 - December 1998) for systems having fewer than 150 service connections.

  • The Project Site, where applicable, means the place or places named in the SCC.

  • Due Diligence Examination shall have the meaning set forth in Section 3.2.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Maintenance and Operations Revenue or “M&O Revenue” means (i) those revenues which the District receives from the levy of its annual ad valorem maintenance and operations tax pursuant to Section 45.002 of the TEXAS EDUCATION CODE, or other lawful authority, and Article VII § 3 of the TEXAS CONSTITUTION, plus (ii) all State revenues to which the District is or may be entitled under the applicable provisions of the TEXAS EDUCATION CODE or any other statutory provision as well as any amendment or successor statute to these provisions, as applicable, less

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • PJM Region Reliability Requirement means, for purposes of the Base Residual Auction, the Forecast Pool Requirement multiplied by the Preliminary PJM Region Peak Load Forecast, less the sum of all Preliminary Unforced Capacity Obligations of FRR Entities in the PJM Region; and, for purposes of the Incremental Auctions, the Forecast Pool Requirement multiplied by the updated PJM Region Peak Load Forecast, less the sum of all updated Unforced Capacity Obligations of FRR Entities in the PJM Region.

  • Sales assessment ratio studies means sales assessment ratio studies

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Marijuana testing facility means an entity licensed to analyze and certify the safety and potency of marijuana.

  • Contract Year means each period of twelve (12) consecutive months during the Initial Term of this Agreement, with the first Contract Year commencing on the Effective Date, and with each subsequent Contract Year commencing on the anniversary of the Effective Date.