ICIF Construction Sample Clauses

ICIF Construction. The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider and Transmission Owner “as-built” drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer’s step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. Interconnection Customer shall provide Transmission Provider and Transmission Owner with Interconnection Customer’s specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.
AutoNDA by SimpleDocs
ICIF Construction. The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Owner "as-built" drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Large Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Large Generating Facility. The Interconnection Customer shall provide Transmission Owner specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.
ICIF Construction. The ICIF shall be designed and constructed in accordance with Applicable Reliability Standards, Transmission Provider’s Technical Standards, and Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to Transmission Provider "as-built" drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with Interconnection Customer's step-up transformers, the facilities connecting the Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Generating Facility. The Interconnection Customer shall provide Transmission Provider specifications for the excitation system, automatic voltage regulator, Generating Facility control and protection settings, transformer tap settings, and communications, if applicable.
ICIF Construction. 5.10.4 Interconnection Customer to Meet Requirements of the Distribution Provider’s Interconnection Handbook...............
ICIF Construction. [Need to make specific references (Transmission Provider) (Operating Agent of the JPP) (Project Phase)] [Differences between APS LGIA and CAISO LGIA] The APS LGIA provision was supplemented by adding language at the end concerning deviations from what was originally submitted by the Interconnection Customer. This language was added to make the provision conform more closely to the CAISO LGIA. Omission of CAISO LGIA Article 5.10.4 [Differences between APS LGIA and CAISO LGIA] The provisions of CAISO LGIA Article
ICIF Construction. The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to JEA "as-built" drawings, information and documents for the ICIF, such as: a one-line diagram, a site plan showing the Transmission Interconnected Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with Interconnection Customer's step-up transformers, the facilities connecting the Transmission Interconnected Generating Facility to the step-up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers and the Transmission Interconnected Generating Facility. The Interconnection Customer shall provide JEA specifications for the excitation system, automatic voltage regulator, Transmission Interconnected Generating Facility control and protection settings, transformer tap settings, various testing data as required by NERC Reliability Standards, PSSE models, and communications, if applicable.
ICIF Construction. The ICIF shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date of the Project, unless the Parties agree on another mutually acceptable deadline, Interconnection Customer shall deliver to (i) APS, on behalf of Transmission Owners, and (ii) CAISO “as-built” drawings, information and documents for the ICIF of the Large Generating Facility, such as: a one-line diagram, a site plan showing the Large Generating Facility and the ICIF, plan and elevation drawings showing the layout of the ICIF, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with Interconnection Customer’s step-up transformers, the facilities connecting the Large Generating Facility to the step- up transformers and the ICIF, and the impedances (determined by factory tests) for the associated step-up transformers. The Interconnection Customer shall provide (i) APS, on behalf of Transmission Owners, and (ii) CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the CAISO and APS, on behalf of the Transmission Owners pursuant to the appropriate provisions of this Agreement and APS’s Large Generator Interconnection Procedures and XXXXX’s GIDAP.
AutoNDA by SimpleDocs
ICIF Construction. [Intentionally left blank.]
ICIF Construction. 23 5.10.4 Interconnection Customer to Meet Requirements of the Distribution Provider’s Interconnection Handbook. 24 5.11 Distribution Provider's Interconnection Facilities Construction. 24 5.12 Access Rights. 24 5.13 Lands of Other Property Owners.. 24 5.14 Permits. 25 5.15 Early Construction of Base Case Facilities. 25 5.16 [Omitted].. 25 5.17 Taxes. 25 5.17.1 Interconnection Customer Payments Not Taxable. 25 5.17.2 Representations and Covenants. 25

Related to ICIF Construction

  • Completion of Construction Within 60 days of the completion of construction of the Project, Project Owner shall deliver to DoD copies of the FAA form 7460-2 for each ASN, including the final coordinates for each turbine erected.