Water Main Relocation at the Milwaukee Trail Pedestrian Underpass Sample Clauses

Water Main Relocation at the Milwaukee Trail Pedestrian Underpass. WGM Group will complete the design work for the water main relocation at the Milwaukee Pedestrian Trail Underpass, which was previously prepared for MWC. Designs and technical specification requirements will be coordinated with the City. Final plans and technical specifications will be prepared in MDT format to be incorporated into the MDT plan set and construction documents. A design report and required project information will be prepared and submitted to DEQ for review and approval as soon as possible, but preferably before bidding. Construction observation will be conducted on behalf of the City with record drawings and post construction documentation submitted to the City and DEQ.
AutoNDA by SimpleDocs

Related to Water Main Relocation at the Milwaukee Trail Pedestrian Underpass

  • Therapist Availability Therapist’s office is equipped with a confidential voice mail system that allows Patient to leave a message at any time. Therapist will make every effort to return calls within 24 hours (or by the next business day), but cannot guarantee the calls will be returned immediately. Therapist is unable to provide 24-hour crisis service. In the event that Patient is feeling unsafe or requires immediate medical or psychiatric assistance, he/she should call 911, or go to the nearest emergency room.

  • Infrastructure Vulnerability Scanning Supplier will scan its internal environments (e.g., servers, network devices, etc.) related to Deliverables monthly and external environments related to Deliverables weekly. Supplier will have a defined process to address any findings but will ensure that any high-risk vulnerabilities are addressed within 30 days.

  • Transit Traffic The following rates will apply:

  • Traffic Measurement and Billing over Interconnection Trunks 6.1 For billing purposes, each Party shall pass Calling Party Number (CPN) information on at least ninety-five percent (95%) of calls carried over the Interconnection Trunks.

  • BUILDING INDUSTRY PICNIC DAY The parties agree that Building Industry Picnic Day will continue to apply during the life of this Agreement in accordance with the following:

  • Originating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • Terminating Switched Access Detail Usage Data A category 1101XX record as defined in the EMI Telcordia Practice BR-010-200- 010.

  • -wire Unbundled Digital/DS0 Loop These are designed 4-wire Loops that may be configured as 64kbps, 56kbps, 19kbps, and other sub-rate speeds associated with digital data services and will come standard with a test point, OC, and a DLR.

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • EVENTS OUTSIDE OUR CONTROL 7.1 We will not be liable or responsible for any failure to perform, or delay in performance of, any of Our obligations under these Terms that is caused by an Event Outside Our Control.

Time is Money Join Law Insider Premium to draft better contracts faster.