Prepared By Sample Clauses

Prepared By. Date: ------------------------------------------------------------------------------- Firm: Telephone: ------------------------------------------------------------------------------- Reminder: Please include the following documents:
AutoNDA by SimpleDocs
Prepared By. ¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
Prepared By. Xxxxx Xxxxxxxx – Olympic Region Cruiser TC PSPCSTGR Species, Sort Grade - Board Foot Volumes (Project) T000 R000 S00 TyU1 T000 R000 S00 TyU2 9.00 5.00 Project: Acres XXXXX 14.00 Page Date Time 1 9/13/2018 4:07:25PM S So Gr Spp T rt ad % Net BdFt Bd. Ft. per Acre Def% Gross Net Total Net MBF Percent of Net Board Foot Volume Average Log Logs Per /Acre Log Scale Dia. Log Length Ln Ft Dia In Bd Ft CF/ Lf DF CU CU 7 0.00 1.0 DF HQ 2S 24 3.9 2,850 2,740 38 24 76 100 40 16 391 2.67 7.0 DF D 2S 46 2.1 5,220 5,110 72 48 52 14 86 38 15 319 2.15 16.0 DF D 3S 20 6.3 2,314 2,169 30 19 81 2 70 27 34 9 88 0.78 24.7 DF D 4S 7 747 747 10 80 20 52 48 21 6 26 0.38 28.5 DF D UT 3 314 314 4 18 82 18 82 18 6 26 0.43 12.3 DF Totals 51 3.2 11,445 11,080 155 10 20 28 43 4 4 22 70 28 9 124 1.19 89.5 SS D 4S 80 89 89 1 100 100 24 8 40 0.57 2.2 SS D UT 20 22 22 0 100 100 14 5 10 0.24 2.2 SS Totals 1 111 111 2 20 80 20 80 19 7 25 0.45 4.5 RC CU CU 100.0 60 6 6 0.00 9.5 RC D 3S 88 21.7 4,412 3,452 48 9 24 21 46 5 3 5 87 34 11 146 1.87 23.7 RC D 4S 12 6.1 465 437 6 97 3 19 44 11 26 24 5 25 0.44 17.3 RC Totals 18 21.2 4,937 3,889 54 19 22 18 41 6 8 6 80 26 8 77 1.32 50.4 RA D 2S 9 20.8 530 420 6 100 100 40 14 210 2.00 2.0 RA D 3S 20 1.0 955 945 13 100 44 46 10 26 10 78 0.85 12.0 RA D 4S 54 2.0 2,576 2,524 35 80 20 18 80 2 27 7 40 0.46 63.4 RA D UT 17 751 751 11 100 82 10 8 15 5 13 0.21 56.4 WH D 3S 55 3.4 435 420 6 100 100 40 9 129 0.95 3.2 WH D 4S 17 123 123 2 80 20 84 16 27 6 33 0.33 3.7 WH Totals 4 12.5 865 756 11 13 59 28 14 86 34 8 99 0.98 7.7 BM D 2S 58 21.1 803 634 9 79 21 21 25 54 32 14 185 2.18 3.4 BM D 3S 2 18 18 0 100 100 20 10 70 0.81 .2 BM D 4S 1 20 20 0 100 100 20 8 40 0.50 .5 BM D UT 39 412 412 6 54 46 17 20 40 23 26 6 40 0.64 10.3 TWP RGE 000 000 000 000 SC TRACT 00 ALDER 00 ALDER TYPE ACRES U1 14.00 U2 PLOTS 21 TREES254 CuFt S BdFt W PLOTS TREES ESTIMATED TREES TOTAL PER XXXX XXXXX XXXXXXX XXXXXX XXXXX XXXXX 00 000 12.1 CRUISE 21 254 12.1 2,141 11.9 DBH COUNT REFOREST COUNT BLANKS 100 % SAMPLE TREES TREES /ACRE STAND SUMMARY AVG BOLE REL BASAL DBH LEN DEN AREA XXXXX XX/AC NET BF/XX XXXXX CF/AC NET CF/AC XXXX FIR 85 39.9 19.5 69 18.8 82.9 11,445 11,080 3,019 3,019 WR CEDAR 82 27.3 19.8 51 13.1 58.5 4,937 3,889 1,717 1,702 R ALDER 56 71.1 12.1 50 16.4 57.1 4,812 4,640 1,388 1,388 BL MAPLE 15 8.4 18.7 50 3.7 16.0 1,252 1,083 421 421 WHEMLOCK 15 3.9 19.4 73 1.8 8.1 865 756 253 253 S SPRUCE 1 2.2 12.0 45 0.5 1.7 111 111 38 38 TOTAL 254 153.0 16.4 55 55.4 224.4 23,422 21,560 6...
Prepared By. Xxxxxx Xxxxxxxx Surveyors dispose of any debris arising from damage to or destruction of the works and to rebuild, restore, replace and/or repair the works, at the contractor
Prepared By. Xxxxxx Xxxxxxxx Surveyors as he will be held solely responsible for all new work being of the correct size. PIPES, ETC Special care is to be taken not to interfere unnecessary with any supply pipes or other piping that may be met with and found necessary to disconnect or cut, are to be effectively stopped off and any new connections that may be necessary are to be made with proper fittings and to the satisfaction of the Principal Agent to whom due notice must be given of any alterations to the existing services. PROTECTION In taking down and removing existing work the utmost care is to be observed to avoid any structural or other damage to the remaining portions of the buildings. The Contractor must also protect all work not removed such as walls, floors, doors, windows or other joinery,loose and fixed fittings and electrical appliances, etc. from damage during the progress of the work and provide all necessary materilas for doing so. The Contractor will be held solely responsible for any damage to persons or property and for the safety of the structure throughout the whole of this Contract and must make good at his own expense any damage that may occur. OLD USABLE MATERIALS from the alterations/demolitions are to become the property of the Client. Old materials for re-use are to be carefully removed, stored and protected from injury including making good any damaged or defective parts as required before fixing. Old reusable materials are to be handed over to the Client are to be carefully removed and neatly stacked on site where directed. The remainder of the old materials and all rubbish to be immediately carted away and the site left clean and unencumbered.The Contractor should allow for removing of rubble from site on daily basis, failing which the client might stop the construction until the site has been cleaned. None of the old stock bricks from the pulling down are to be re-used for any new work. Materials to be handed over to the Client should be kept safely and handed over to the School Governing Body or the school principal who shall sign for all materials received. MATERIALS, ETC The materials to be used and work to be done to be similar in all respects to that described for new work insofar as they concur. All work in making good is to be properly jointed to the existing. Carried to Collection R Section No. 2 Buildings Bill No. 1 ALTERATIONS
Prepared By. 3. The use of the Servient Lands shall be restricted in the manner stated in Articles 4 through 8, inclusive of this Restrictive Covenant. The Restrictions shall be annexed to and burden the Servient Lands and shall be annexed to and benefit the Dominant Lands.
Prepared By. The issuer, but the issuer may not vary the provisions of the Agreement. Prepared in: One original. Distribution: Submit to Xxxxxx Mae’s Office of Issuer & Portfolio Management.
AutoNDA by SimpleDocs
Prepared By. K.B Title: Timber Cruiser j:\forms\pre-sales\CRUISE-Narrative.doc Revised: 2/17/2000 TC PSPCSTGR Species, Sort Grade - Board Foot Volumes (Project) X00X X00X X00 Xx00X0 12.50 Project: LINKSALV Acres 12.50 Page Date Time 1 5/30/2017 4:14:35PM S So Gr Spp T rt ad % Net BdFt Bd. Ft. per Acre Def% Gross Net Total Net MBF Percent of Net Board Foot Volume Average Log Logs Per /Acre Log Scale Dia. Log Length Ln Ft Dia In Bd CF/ Ft Lf WH CU CU WH HB 2S WH HB 3S WH D 2S WH D 3S WH D 4S WH D UT 6 18 27 25 22 2 4.5 1,206 1,151 3,408 3,408 6.1 5,532 5,195 4.2 4,858 4,653 .6 4,287 4,259 201 201 14 43 65 58 53 3 100 100 89 11 34 66 100 100 11 55 100 100 21 79 19 5 76 29 7 52 45 2 38 36 34 35 30 19 8 13 9 14 8 5 6 0.00 201 1.52 109 0.80 229 1.70 77 0.64 33 0.33 26 0.44 39.0 5.7 31.2 22.7 60.5 130.2 7.8 WH B CU CU WH B D 2S WH B D 3S WH B D UT 16 16 68 100.0 24316.7 318 265 10.0 292 263 1,101 1,101 3 3 14 100 100 13 28 59 100 100 35 5 60 24 36 36 34 6 12 9 8 0.00 150 1.28 90 0.75 105 0.84 7.5 1.8 2.9 10.4 SF Totals 27 1.2 7,902 7,810 98 14 25 35 26 2 12 7 80 30 9 120 0.99 65.1 XX XX XX XX X 0X XX X 0X 00 0 6.2 483 453 30 30 6 0 100 100 24 76 100 3 27 22 15 18 9 0.00 380 3.07 50 0.83 .6 1.2 .6 DF Totals 2 5.8 513 483 6 6 94 22 6 72 20 15 202 2.33 2.4 Totals 3.6 29,860 28,789 360 25 32 33 11 3 16 4 77 29 8 74 0.70 387.3 TC PSTATS PROJECT STATISTICS PROJECT LINKSALV PAGE DATE 1 5/30/2017 TWP RGE 14N 05 SC TRACT 16 LINKSALV TYPE ACRES 00U1 12.50 PLOTS 20 TREES81 CuFt S BdFt W PLOTS TREES ESTIMATED TREES TOTAL PER PLOT TREES PERCENT SAMPLE TREES TOTAL 20 81 4.1 CRUISE 13 53 4.1 2,364 2.2 DBH COUNT REFOREST BLANKS 4 100 % SAMPLE TREES TREES /ACRE STAND SUMMARY AVG BOLE REL BASAL DBH LEN DEN AREA XXXXX XX/AC NET BF/XX XXXXX CF/AC NET CF/AC WHEMLOCK 29 148.0 14.6 63 45.0 171.9 19,491 18,867 5,268 5,271 WHEMLOCK-B 5 10.4 16.6 71 3.8 15.6 1,954 1,629 540 454 PS FIR 18 30.1 19.0 69 13.6 59.4 7,902 7,810 1,956 1,956 XXXX FIR 1 .6 31.0 82 0.6 3.1 513 483 110 110 TOTAL 53 189.1 15.6 64 63.4 250.0 29,860 28,789 7,875 7,791 CONFIDENCE LIMITS OF THE SAMPLE 68.1 TIMES OUT OF 100 THE VOLUME WILL BE WITHIN THE SAMPLE ERROR CL 68.1 COEFF SAMPLE TREES - BF # OF TREES REQ. INF. POP. SD: 1.0 VAR.% S.E.% LOW AVG HIGH 5 7 10 WHEMLOCK 56.0 10.6 153 171 189 WHEMLOCK-B 26.1 13.0 144 166 188 PS FIR 33.5 8.4 299 326 353 XXXX FIR TOTAL 62.0 8.6 213 233 253 154 78 38 CL 68.1 COEFF SAMPLE TREES - CF # OF TREES REQ. INF. POP. SD: 1.0 VAR.% S.E.% LOW AVG HIGH 5 7 10 WHEMLOCK 55.9 10.6 43 48 53 WHEMLOCK-B 25...
Prepared By. Signatures. This Deed is signed and attested to by the Grantor's proper corporate officers as of the date at the top of the first page. Its corporate seal is affixed. Witnessed by: _By: Print Name and Title STATE OF SS: COUNTY OF I CERTIFY that on personally came before me and stated to my satisfaction that this person ( or if more than one, each person):
Prepared By. Xxxxxx X. Xxxxxxxx Xxxxxx X. Xxxxxxxx & Associates, P.L.C. 00000 X. Xxxxxxxx Xxxx Xxxx, Xxxxx 000 Xxxxxxxxxx Xxxxx, XX 00000 (000) 000-0000 xxxxxx@xxxxxxxxxx.xxx xxx.xxxxxxxxxx.xxx
Time is Money Join Law Insider Premium to draft better contracts faster.